Launch Date
Completion Date
RERA ID
28.56055556
77.43722222
As per approved building plan
RCC/Brick work in boundary wall
WBM with paver/Tarmac
Polycrete tile/Paver
Provided central water supply for all required areas as given in the drawing , for flushing & irrigation Dual Plumbing system provided.
Two pipe line system for sewage disposal & finally treated through STP
Drainage through network of pipes and catch basins to dispersion trenches with overflow to authority drain.
As per approved building plan
As per approved building plan
Through LT and Sub Distribution Panels
Club & other Facilities provided
Through Sewage Treatment Plant and overflow to authority Sewer line
Through Solid Waste Machine
Through Rain water harvesting Pit
Automatic PLC, Solar , LED
Integrated fire alarm system as per NBC
NA
Fire escapes staircase as per NBC
NA
Showing 7 blocks with 184 units
Total Carpet Area
98969.58 m²
1065298.66 ft²
Total Units
760
4 different types
Blocks & Floors
7
30 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
33400.34 m²
359517.92 ft²