ONGOINGActive

SAAN VERDANTE

GURUGRAM, GURGAON
19-06-2019
Launch Date
ONGOING
Type
2027-05-28
Completion Date

Overview

Launch Date

19-06-2019

Completion Date

2027-05-28

RERA ID

RERA-GRG-262-2019

Basic Details

Project NameSAAN VERDANTE
Project IDRERA-GRG-262-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date19-06-2019 01:23:05 AM
Builder NameSAAN PROCON PVT. LTD.
CINU70101DL2011PTC223793
PANXXXX963F
Emailaroanmol@gmail.com
Websitehttp://saangroup.com/overview.php
Phone (Mobile)9910026906
Phone (Landline)01126210520
Registered Address11, COMMUNITY CENTRE, EAST OF KAILASH, FIRST FLOOR. BEHIND NATIONAL HEART INSTITUTE.
Project AddressSECTOR-95
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameVIJAYA BANK (NOW BANK OF BARODA), NO 31/C, DDA COMPLEX, OPP. MOOLCHAND HOSPITAL, DEFENCE COLONY BRANCH, NEW DELHI-110024
Account Number600501013000004
IFSC CodeVIJB0006005
MICR Code110029007
Branch Code6005

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Anmol Arora 11, Community Centre, East of Kailash, First Floor, Behind National Heart Institute.
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area3.77 (Acre)
Proposed FAR174.15
Permissible FAR175
Total Licensed Land17 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1717.818
CONSTRUCTION OF ROADS3249.733
PAVEMENTS1624.867
PARKS AND PLAYGROUNDS4837.82
GREEN BELTS0
VEHICLE PARKINGS2404.6
ELECTRICITY SUB-STATION31.47
CLUB HOUSE355.050
SEWAGE AND SOLID WASTE TREATMENT FACILITY360.63
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER518.92
COMMERCIAL155.734
Total15256.642

Cost Details

Land Cost1245 Lakhs
Other Cost6048.03 Lakhs
Estimated Project Cost14193.41 Lakhs
Estimated Infrastructure Cost420.38 Lakhs
Estimated Apartment Construction Cost6480 Lakhs

Documents

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 19-06-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 19-06-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 19-06-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 19-06-2019

DEMARCATION PLAN

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

ZONING PLAN

Uploaded on: 19-06-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 19-06-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN (.PDF,JPG,JPEG,PNG)

Uploaded on: 19-06-2019

Statutory Approvals

LICENSE APPROVAL NO. 216 OF 2007 DT. 05.09.2007Date: 04-09-2019Status: ALREADY BEEN OBTAINED
ZONING PLAN APPROVAL NO. DTC-2945 DT. 19.12.2007Date: NAStatus: ALREADY BEEN OBTAINED
BUILDING PLAN / SITE PLAN APPROVAL NO. ZP-298/AD (RA)/2016/13847Date: 12-07-2016Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN (NO. DEH/09/SEIAA/478 DT. 28.05.2009)Date: 30-11-2022Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCE NO. AAI/RHQ/NR/ATM/NOC/2016/205/1037-40 DT. 16.09.2016Date: 16-11-2021Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVAL NO. DFS/F.A./2016/457/51015Date: NAStatus: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATES APPROVAL NO. LC-1057PA(B)-2015/16966Date: 04-09-2015Status: ALREADY BEEN OBTAINED
FOREST NOC NO. 121-GDate: 22-04-2011Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STPAS PER PROJECT REPORT

NOC

ROADSProvider: HUDAApproval Status: Approved
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHVBNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Pending
STORM WATER DRAINAGEProvider: GMDAApproval Status: Pending

Project Team

Authorized Representative

ANMOL ARORA
Name
ANMOL ARORA
PAN
XXXX810M
Email
aroanmol@gmail.com
Mobile
9910026906
Landline
01126210520
Address
M-75 Greater Kailash-1 New Delhi- 110048

Managing Director/CEO

NA
Name
NA
PAN
XXXXNANA
Email
NA@GMAIL.COM
Mobile
0000000000
Landline
00000000000
Address
NA

Directors

PREM ARORA
Name
PREM ARORA
PAN
XXXX189L
Email
premarora59@gmail.com
Mobile
9810026906
Landline
01126210520
Address
M-75 Greater Kailash-1 New Delhi- 110048
RAJAN BAJAJ
Name
RAJAN BAJAJ
PAN
XXXX522D
Email
rajanbajaj269@gmail.com
Mobile
9810006244
Landline
01126210520
Address
137B Golf Links New Delhi-110003
ANMOL ARORA
Name
ANMOL ARORA
PAN
XXXX810M
Email
aroanmol@gmail.com
Mobile
9910026906
Landline
01126210520
Address
M-75 Greater Kailash-1 New Delhi- 110048
SAKSHI ARORA
Name
SAKSHI ARORA
PAN
XXXX169G
Email
sakshi.arora0210@gmail.com
Mobile
9910069969
Landline
01126210520
Address
M-75 Greater Kailash-1 New Delhi- 110048

Contact Details

Project ContactEmail: aroanmol@gmail.comMobile: 9910026906Landline: 01126210520
Project Contact PersonName: ANMOL ARORAEmail: aroanmol@gmail.comMobile: 9910026906Landline: 01126210520

Land Details

Land Area3.77 (Acre)
Proposed FAR174.15
Permissible FAR175
Total Licensed Land17 (Acre)

Land Usage

Land Cost1245 Lakhs
Other Cost6048.03 Lakhs
Estimated Project Cost14193.41 Lakhs
Estimated Infrastructure Cost420.38 Lakhs
Estimated Apartment Construction Cost6480 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Underground Tank3.36
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres20
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-000
Other-000
Parks and Playgrounds-00.8850.885
Rainwater Harvesting--06.25
Roads & Pavements-022.3322.33
Security and Fire fighting----
Security and Firefighting--5.835.83
Sewerage-8.244.943.29
Sewerage treatment & garbage disposal-07.210.8
Shopping area-000
Storm Water Drainage-010.9910.99
Street Lighting--7.1857.185
UG Water tanks--2.242.24
Water Supply System-33.8920.3313.56
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres19.219.238.40
Electricity Supply System0000
Other0000
Parks and Playgrounds000.590.59
Rainwater Harvesting--6.25-
Roads & Pavements0033.48933.489
Security and Fire fighting--2.52.5
Security and Firefighting----
Sewerage-8.248.24-
Sewerage treatment & garbage disposal0060
Shopping area0000
Storm Water Drainage0010.9910.99
Street Lighting--4.794.79
UG Water tanks-3.360-
Water Supply System033.8933.890

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECERAMIC/VITRIFIED/NANO VITRIFIED TILES - RS. 50 - 60/SQ.FT.
WALL FINISHING DETAILSPLASTIC EMULSION/OBD RS. 7 - 12/SQ.FT.
KITCHEN DETAILSCERAMIC TILES. NO WOOD WORK OR ELECTRICAL ACCESSORIES. ONLY COUNTER WITH STONE. RS. 50 - 60/SQ.FT.
BATHROOM FITTINGSBRANDED CP FITTINGS AND CHINAWARE RS. 8,000/ BATHROOM
WOOD WORK ETC-
DOORS AND WINDOS FRAMESSKIN/LAMINATED INTERNAL DOORS WITH MATCHING DOOR FRAMES RS. 325/ SQ.FT.
GLASS WORK5MM TOUGHENED IN EXTERIOR DOORS AND WINDOWS RS. 80/SQ.FT.
ELECTRIC FITTINGSONLY ONE TUBE IN EACH BEDROOM AND ONE CFL/LED IN EACH BATHROOM RS. 50/ PC
CONDUCTING AND WIRING DETAILSSETIA PVC CONDUITS WITH BRANDED INDIAN WIRES
CUPBOARD DETAILSNOT PROVIDING
WATER STORAGERCC TANKS - RS. 7,000/ CUM
LIFT DETAILSSCHINDLER/KONE/OTIS/THYSSENKRUPP RS. 26 LAC/ EACH
EXTERNAL GLAZINGS-
WINDOWS/GLAZINGSALUMINIUM/UPVC EXTERIOR DOORS AND WINDOWS RS. 275/SQ.FT.
DOORS-
MAIN DOORSLAMINATED/SKIN FLUSH DOORS RS. 325/SQ.FT.
INTERNAL DOORSLAMINATED/SKIN FLUSH DOORS RS. 325/SQ.FT.
AIR CONDITIONINGPROVISION OF COPPER PIPING FOR SPLIT AIRCONDITIONING. RS. 150/RFT
ELECTRICAL FITTINGSONLY ONE TUBE IN EACH BEDROOM AND ONE CFL/LED IN EACH BATHROOM RS. 50/PC
CNG PIPE LINEWILL PROVIDE IF MANDATORY. CONNECTION WILL BE TAKEN FROM COMPETENT AUTHORITY
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE.
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT. RS. 10/SQ.FT.
INTERNAL FINISHING-

Unit-wise Specifications

TOILET
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
COUNTERSRCC WITH STONE CLADDING = RS. 150/SQ.FT.
SANITARY WARE/CP FITTINGSBRANDED INDIAN = RS. 8,000/ BATHROOM
FIXTURESNOT PROVIDING
KITCHEN
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
COUNTERSRCC WITH STONE CLADDING = RS. 150/SQ.FT.
FIXTURESNOT PROVIDING
KITCHEN APPLIANCESNOT PROVIDING
SIT-OUTS
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLS & CEILINGPLASTIC/TRACTOR EMULSION/TEXTURE PAINT/ OBD - RS. 7 - 12/SQ.FT.
RAILINGSMS = RS. 85 - 90/KG
FIXTURESNOT PROVIDING
BED ROOMS
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
WARDROBESNOT PROVIDING
MASTER TOILET
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
COUNTERSRCC WITH STONE CLADDING = RS. 150/SQ.FT.
SANITARY WARE/CP FITTINGSBRANDED INDIAN = RS. 8,000/ BATHROOM
FITTING/FIXTURES-
MASTER BEDROOM/DRESSROOM
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
MODULAR WARDROBESNOT PROVIDING
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLSPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
CEILINGTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES - RS. 50 - 60/ SQ.FT.
WALLS & CEILINGPLASTIC EMULSION/OBD - RS. 7 - 12/SQ.FT.
TOILETTRACTOR EMULSION = RS. 7 - 12/SQ.FT.
BALCONYTILES AND MS RAILINGS = RS. 85 - 90/KG

Fee Details

Payment 1
amount:255000
cheque no:211362
draft date:31-07-2017
payable to:HRERA Gurugram
payee bank:VIJAYA BANK, DEFENCE COLONY BRANCH
Payment 2
amount:433619
cheque no:523957
draft date:09-07-2019
payable to:HRERA Gurugram
payee bank:VIJAYA BANK, DEFENCE COLONY BRANCH