GODREJ NEST PHASE-2

Gautam Buddha Nagar, Uttar Pradesh
01-10-2018
Launch Date
New
Type
29-03-2025
Completion Date

Overview

Launch Date

01-10-2018

Completion Date

29-03-2025

RERA ID

UPRERAPRJ14252

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)9503
Project NameGODREJ NEST PHASE-2
Registration Fee (in Rs.)53000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)78
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-10-2018
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)17084
Proposed Completion Date29-03-2025

Location

Latitude

28.420189

Longitude

77.493981

Bank Details

Account no.252544556677
Name Of Account HolderBrick Rise Developers Pvt. Ltd.- RERA Designated A/c Phase 2
Bank NameIndusInd Bank Ltd.
Branch AddressGopal Das Bhawan, 28, Barakhamba Road, New Delhi- 110001
Branch NameGopal Das Bhawan, 28, Barakhamba Road
IFSC CodeINDB0000005

Development Works

Demarcation of Plots

As per Approved Building Plan

Boundary Wall

As per Approved Building Plan

Road Work

As per Approved Building Plan

Footpaths

As per Approved Building Plan

Water Supply Including Drinking Water Facilities

Noida Authority shall provide water supply to the entire society further water will be treated and supplied at  customer premise through piping and pumping and gravity system

Sewer System

Centralised STP  to treat the sewerage and every tower has its own down comers connected to main sewerage line

Drain

Centralised STP  to treat the sewerage and every tower has its own down comers connected to main sewerage line

Parks

As per Approved Building Plan

Tree Planting

As per Approved Building Plan

Design For Electric Supply Including Street Lighting

Single feeder shall be taken from Noida Electricity board and connected to central substation and entire project shall have street lighting with timer control

Community Buildings

Club comprises of (Swimming Pool, Kids Pool, Zen Room, Squash Court, Gym, Library, Indoor Games, Cafe/Restaurant) Amphitheater.

Treatment and Disposal System of Sewage and Sullage water

Central STP for entire project and all towers shall be connected to STP

Solid Waste Management And Disposal System

Project shall have  waste segregation area and OWC for treatment of organic waste

Water Conservation System

Adequate no of  Recharge pits made

Energy Management System Including Use of Renewable Energy

LED lights and timer control panels shall be used for efficient energy management

Fire Protection And Fire Safety System

Fire alarm system provided

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Approved Building Plan

Emergency Evacuation Services

As per Approved Building Plan

Other Miscellaneous Work

As per Approved Building Plan

Documents

Lease Deed

No: Document No. 7362 Volume No. 6993 Page No. 153 to 186 dated 20th November, 2015 | Date: 20-11-2015

Lease Deed

No: Document No. 6337 Volume No. 7881 Page No. 251 to 300 | Date: 15-06-2016

Allotment Letter issued by Competent Authority

No: Document No. 6337 Volume No. 7881 Page No. 251 to 300 | Date: 15-06-2016

Lease Deed

No: Document No. 7362, Volume No. 6993 Page No. 153 to 186 dated 20th November, 2015 | Date: 20-11-2015

Lease Deed

No: Document No. 6337, Volume No. 7881 Page No. 251 to 300 | Date: 15-06-2016

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 03-07-2018

Commencement Certificate

Uploaded: 03-07-2018

Other Plan(If Any)

Uploaded: 03-07-2018

Proforma of Application Form

Uploaded: 03-07-2018

Proforma of Allotment Letter

Uploaded: 03-07-2018

Waste Disposal Plan

Uploaded: 06-07-2018

Water Supply Plan

Uploaded: 06-07-2018

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 03-07-2018

Affidavit

Uploaded: 03-07-2018

Registry Document In Case of Own Land

Uploaded: 02-11-2017

Registry Document In Case of Own Land

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Authentic copy of Approval of Project

Uploaded: 02-11-2017

Legal Document of Agreement in Case of other Land

Uploaded: 02-11-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 02-11-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 02-11-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 02-11-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 02-11-2017

Commencement Certificate

Uploaded: 02-11-2017

Proforma of Allotment Letter

Uploaded: 02-11-2017

Proforma of Application Form

Uploaded: 02-11-2017

Affidavit

Uploaded: 03-11-2017

Legal Document of Agreement in Case of other Land

Uploaded: 13-11-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 13-11-2017

Other Plan(If Any)

Uploaded: 13-11-2017

Legal Document of Agreement in Case of other Land

Uploaded: 13-11-2017

Legal Document of Agreement in Case of other Land

Uploaded: 13-11-2017

Legal Document of Agreement in Case of other Land

Uploaded: 13-11-2017

Floor plans of all types

Uploaded: 15-11-2017

Permits

Orignal Permit Nomaster plan No. IV/1451/950 dated 17/01/2017, Building Plan No. IV-1490/929 dated 30/09/2016
Orignal Permit Date17-01-2017
Valid Upto16-01-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto15-01-2027
End Date30-09-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameArcop Associates. Pvt. Ltd.
Architect AddressPlot No-36, Jharsa Road, Sector 32, Gurugram, Haryana 122018
Architect Licence NumberCA/2001/27447
Structural Engineer NameTechnical Projects Consultants Pvt. Ltd.
Structural Engineer AddressB-74, Sector- 57, Noida 201301
Mobile number(Project Co-ordinator)9978856617

Land Details

AFS

Showing 7 blocks with 137 units

Property Summary

Total Carpet Area

18336.50

197372.25 ft²

Total Units

174

4 different types

Blocks & Floors

7

22 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:105.38
Balconies:428
Parking ratio:0.00 per unit

Block Commercial

3 units

Block Tower B1 [(3BHK+2 Store/Utility (Type-4)]

22 units

Block Tower B1 [(3BHK+S.WC(Type-3)]

23 units

Block Tower B1 [Simplex Penthouse -4BHK+4TOI+LOUNGE+P.RM

23 units

Block Tower B2 [(3BHK+2 Store/Utility (Type-4)]

22 units

Block Tower B2 [(3BHK+S.WC(Type-3)]

21 units

Block Tower B2 [Simplex Penthouse -4BHK+4TOI+LOUNGE+P.RM

23 units

Khasra Details

Total Area

72000.00

775000.80 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoSC-02, H&I, Sector-150, Noida
Area(In Sq. Mt.)72000

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameArcop Associates. Pvt. Ltd.
Architect AddressPlot No-36, Jharsa Road, Sector 32, Gurugram, Haryana 122018
Architect Licence NumberCA/2001/27447
Structural Engineer NameTechnical Projects Consultants Pvt. Ltd.
Structural Engineer AddressB-74, Sector- 57, Noida 201301
Mobile number(Project Co-ordinator)9978856617