Have queries on this Project?
Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
RERA ID
28.569407
77.481207
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupShowing 4 blocks with 172 units
Total Carpet Area
50524.57 m²
543841.42 ft²
Total Units
859
3 different types
Blocks & Floors
4
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
18380.00 m²
197840.48 ft²
Yes, Masonary Pucca and Railing Boundary Wall of 1200 mm Height with 900 mm high Railing
Yes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
Yes, Cement Concrete , Stone and Grass Pavers
Yes, Water Supply from Authority further water to be collected in Under Ground Water reservoirs Terrace Tanks, equipped with Hydro Pneumatic pumps with GI rings and risers
RCC hume pipe with Manhole ,Chambers and Collection chamber and connections with Authority Sewer System.
Yes, Saucer Drain and RCC Hume Pipe System
Yes, Beautiful Landscape with Civil Work with Masonary and Stone, Horticulture Work and various types of Plantation.
Yes, With Banquet, Gym, Indoor Games facilities
S.T.P and through Authority Sewrage System
Yes, Organic Waste Convertor, Collection Bins and Segregation Table.
Yes, Rain water Harvesting Pits , Drip Irrigation with Sprinkelrs
Solar Energy Lights in Common Areas and External Areas
Diesel Pump - 1 No 2850 lpm and 180 lpm head Electrical Pump for Hydrant - 1No 2850 lpm and 180 m head Electrical Pump for Sprinkler - 1 No 2850 lpm and 180 m head Jockey Pumps - 2 Nos 180 lpm and 180 m head Water Curtain Pumps -1 No 2240 lpm and 55 m head Basement internal & external hydrants sprinklers
Proper Water Supply and Sanitary facilities on Ground Floor of Every Tower.
Yes, Refuge area provided at Every Towers on 18th Floor in addition to Main and Fire Staircase.
Guard Room, Entrance and Exit Gates , Commercial Facilities.
Coco County is located in Greater Noida West. The project is spread across 4.54 acres.
Yes. Coco County is registered under UPRERAPRJ958386 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Coco County is 30 September 2025.
Coco County is developed by SHIRJA REAL ESTATE SOLUTIONS PVT. LTD..
Coco County offers 3 BHK configurations.