Launch Date
Completion Date
RERA ID
28.421372
77.244018
Private Free Hold Land, Demarcation was already done before starting the Project.
Boundary Wall on RCC tie-Beams, supported on RCC footings.
Cement Concrete Internal Roads.
Interlocking Pavers on PCC and compacted surface.
to be provided by Ghaziabad Development Authority and Storage will be done in under ground water tank.
Main Sewer line has been designed as per norms and partially laid in basement ceiling and will finally connect to Sewer line / STP.
Underground pipe drain with chamber.
Landscape and Park has been designed as per authority guidlines.
Tree planting has been designed as per authority guidelines.
Design has been done as per UP Electricity Board Guidelines.
Club and Banquet Hall has been designed as per authority norms. ( The community hall and Club are as an Independent area. The Inventory and carpet area related to the community hall and Club have been shown under the Other category in the Inventory Section of the Plan Details.)
Sewage will be treated for recycling (if required) otherwise, it will be connected to the sewer line of authority which is already connected to central functional STP of GDA for this locality.
Door to door collection and will be disposed up to garbage point of authority.
Recycling of treated water and rain water system to be provided.
Solar Panels has been provided as per norms at suitable place.
System will be provided as per the fire department guidelines.
Convenient shopping .
Provision of Exit sign and Emergency Lights.
N.A.
Showing 1 blocks with 187 units
Total Carpet Area
22131.63 m²
238222.65 ft²
Total Units
187
5 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6707.00 m²
72193.48 ft²