Land Area
Project Size
Density
Unit Configurations
Size
Total Floors
RERA Received
RERA Completion
Launch Price
Current Price
RERA ID
28.6480
77.4032
BSP only. GST, PLC, Parking, IFMS could be add ons.
Get Full Cost BreakupTotal Units
1,223
2 unit types
Carpet Area
10,52,710 ft²
97,800.07 m² · carpet only, excludes balcony
Blocks & Floors
6
185 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 861 ft² (79.97 m²)Balconies 1,291Parking per unit 0.0018 of 419 rows list no units (18 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 419 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| B5 | BSMNT | OTHER | — | — | — | — |
| B5 | BSMNT2 | OTHER | — | — | — | — |
| B5 | GF | OTHER | — | — | — | — |
| B5 | 1 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 1 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 2 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 2 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 3 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 3 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 4 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 4 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 5 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 5 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 6 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 6 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 7 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 7 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 8 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 8 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 9 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 9 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 10 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 10 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 11 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 11 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 12 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 12 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 13 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 13 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 14 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 14 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 15 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 15 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 16 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 16 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 17 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 17 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 18 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 18 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 19 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 19 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 20 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 20 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 21 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 21 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 22 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 22 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 23 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
| B5 | 23 | 2 BHK | 4 | 787 ft²73.09 m² | 3 | 146 ft²13.52 m² |
| B5 | 24 | 2 BHK | 4 | 627 ft²58.21 m² | 3 | 149 ft²13.82 m² |
Total Plot Area
38.28 acres
1,54,916.51 m² · plot area
Part of Plot No. 4/ BS-01 and BS-05, Siddharth Vihar, NH-24, Ghaziabad
Combination of RCC and MS Work upto 2.4 metre with peripheral tree plantation along boundary
Combination of Concrete pavers and stone work with design pattern
Footpaths are made up of stone to connect the entire project with entrance lobbies, parks
Water supply connection will be provided by UPAVP (Uttar Pradesh Avas Evam Vikas Parishad), Ghaziabad and will be connected to project under ground tank and then distributed to Over head tank and then to individual flats
Sewer water will be treated in the proposed project Sewage Treatment Plant of capacity 1860 KLD.
Storm water will be connected to Rain Harvesting System provided as per norms
Parks/ Green areas will be developed as per Sanctioned plan
Different evergreen and ornamental trees, shrubs, groundcovers, creepers will be provided with peripheral boundary plantation as proposed.
Electric supply will be provided by UPPVVNL
Community building is provided with facilities like Swimming Pool, Gymnasium, Reading room, Well equipped play areas for kids, Yoga
Sewage and sullage water will be treated in the proposed project sewage treatment plant of capacity 1860 KLD.
Solid waste management area will be provided as per norms in Basement with all required equipments
All water from Hardscape, Terraces, Internal roads will be connected to Rain Water Harvesting pit to recharge groundwater.
Solar energy system/photovoltaic will be placed at terrace level to cater the energy needs of common areas and landscape.
Fire fighting systems will be provided as per fire norms with fire hose reels, proper placement of Fire sprinklers and smoke detectors and Fire Alarm system
Multipurpose hall, GYM, TT Room, Swimming pool, Kids Play Area, Parks etc
Building premises are equipped with fire staircases, fire shafts, and fire hose reels and other necessary equipments, fire tender route is provided in entire site as per norms.
N/A
Prateek Grand Begonia (Phase Ii) is located in Ghaziabad. The project is spread across 11.76 acres.
Yes. Prateek Grand Begonia (Phase Ii) is registered under UPRERAPRJ863272/09/2024 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Prateek Grand Begonia (Phase Ii) is 10 June 2029.
Prateek Grand Begonia (Phase Ii) is developed by Prateek Group.
Prateek Grand Begonia (Phase Ii) offers 2 BHK and 3 BHK configurations.
Developed by
8 Projects
EXECUTIVE SUMMARY OF PRATEEK GROUP Prateek Group is a privately controlled Delhi NCR developer founded in 2005 by Prashant Kumar Tiwari. Headquartered operationally in Noida, it focuses on residential townships and mid-m…