NEWActive

VISTA AVENUE

GURUGRAM, MANESAR
23-09-2024
Launch Date
NEW
Type
2030-11-30
Completion Date

Overview

Launch Date

23-09-2024

Completion Date

2030-11-30

RERA ID

RERA-GRG-1394-2023

Basic Details

Project NameVISTA AVENUE
Project IDRERA-GRG-1394-2023
Project TypeNEW
Applicant TypeCompany
Submission Date23-09-2024 03:18:31 PM
Builder NamePEERAGE BUILDWELL PRIVATE LIMITED
CINU70200DL2010PTC204260
PANXXXX647Q
Emailpeeragebuildwell@gmail.com
Websitehttp://peeragebuildwell.com
Phone (Mobile)9911043014
Phone (Landline)01244301537
Registered Address801, RING ROAD MALL PLOT NO. 21, MANGALAM PLACE, SECTOR-3, ROHINI, DELHI-110085
Project AddressVILLAGE-BADHA & HAYATPUR, SECTOR-89, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameKARNATAKA BANK LIMITED, SECTOR-9, ROHINI BRANCH, DELHI-110085
Account Number5492000100110401
IFSC CodeKARB0000549
MICR Code110052012
Branch Code000549

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr. Virender Gupta R/o H.No 23, Road No. 72, West Punjabi Bagh, Delhi-110026 and Mr. Sourabh Gupta & Mr. Mukul Gupta both R/o of H. No. 6, Third Floor, Road No. 40, West Punjabi Bagh Delhi-110026
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Copy of CA certificate attached

Development Details

Land Area3.9625 (Acre)
Proposed FAR174.99
Permissible FAR175
Total Licensed Land3.9625 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS8342.330
CONSTRUCTION OF ROADS0
PAVEMENTS6251.42
PARKS AND PLAYGROUNDS0
GREEN BELTS1441.89
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total16035.64

Cost Details

Land Cost1263.27 Lakhs
Other Cost8845.50 Lakhs
Estimated Project Cost18608.77 Lakhs
Estimated Infrastructure Cost801.39 Lakhs
Estimated Apartment Construction Cost7698.61 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 15-06-2023

ZONING PLAN

Uploaded on: 15-06-2023

ARAVALLI NOC

Uploaded on: 20-10-2023

FOREST NOC

Uploaded on: 20-10-2023

AIRPORT HEIGHT CLEARANCE

Uploaded on: 20-10-2023

SEWERAGE DISPOSAL NOC

Uploaded on: 20-10-2023

ENVIRONMENT CLEARANCE APPROVAL

Uploaded on: 20-10-2023

BUILDING PLAN APPROVAL

Uploaded on: 20-10-2023

ROAD ACCESS NOC

Uploaded on: 20-10-2023

SITE PLAN

Uploaded on: 20-10-2023

ELECTRICAL LOAD APPROVAL

Uploaded on: 20-12-2023

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 15-01-2024

FIRE SCHEME APPROVAL

Uploaded on: 15-01-2024

SERVICE ESTIMATES PLAN APPROVAL

Uploaded on: 15-01-2024

SERVICE ESTIMATES

Uploaded on: 15-01-2024

ELECTRICITY & LIGHTING PLAN

Uploaded on: 15-01-2024

FIRE FIGHTING SERVICE PLAN

Uploaded on: 15-01-2024

STORM WATER

Uploaded on: 15-01-2024

DEMARCATION PLAN

Uploaded on: 26-02-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 15-02-2024

SOLID WASTE MANAGEMENT PLAN

Uploaded on: 15-02-2024

WATER SUPPLY PLAN

Uploaded on: 22-08-2024

TOTAL COST INCURRED CERTIFICATE

Uploaded on: 26-08-2024

FINANCIAL COST INCURRED CERTIFICATE

Uploaded on: 26-08-2024

BALANCE SHEET

Uploaded on: 17-09-2024

LOI

Uploaded on: 17-09-2024

LC-IV

Uploaded on: 17-09-2024

SALE DEED

Uploaded on: 17-09-2024

MUTATION

Uploaded on: 17-09-2024

FIRST FLOOR PLAN

Uploaded on: 17-09-2024

FIRE SCHEME PLANS

Uploaded on: 17-09-2024

SHAJRA

Uploaded on: 17-09-2024

MINING PERMISSION

Uploaded on: 17-09-2024

ELEVATION AND SECTION PLAN

Uploaded on: 17-09-2024

PARKING PLAN

Uploaded on: 17-09-2024

LOWER GROUND FLOOR PLAN

Uploaded on: 17-09-2024

UPPER GROUND FLOOR PLAN

Uploaded on: 17-09-2024

SECOND FLOOR PLAN

Uploaded on: 17-09-2024

THIRD, FORTH FLOOR PLAN

Uploaded on: 17-09-2024

FIRST BASEMENT PLAN

Uploaded on: 17-09-2024

SECOND BASEMENT PLAN

Uploaded on: 17-09-2024

FIRE QUESTIONER

Uploaded on: 17-09-2024

ROADS AND PAVEMENT PLAN

Uploaded on: 17-09-2024

STREET LIGHT PLAN

Uploaded on: 17-09-2024

LANDSCAPE PLAN

Uploaded on: 17-09-2024

CA CERTIFICATE INVENTORY

Uploaded on: 17-09-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 21-09-2024

AFFIDAVIT NOC- TREE CUTTING, POWER LINE ETC

Uploaded on: 21-09-2024

DEMAND DRAFT (VISTA AVENUE)

Uploaded on: 20-11-2024

SUPERIMPOSED PLAN

Uploaded on: 20-11-2024

WATER SUPPLY ASSURANCE

Uploaded on: 20-11-2024

BANK UNDERTAKING

Uploaded on: 20-11-2024

STORM WATER ASSURANCE

Uploaded on: 20-11-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 20-11-2024

SECTION PLAN AND ELEVATION

Uploaded on: 20-11-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 20-11-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-11-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 20-11-2024

AFFIDAVIT 4(2)(L)(D)

Uploaded on: 20-11-2024

AFFIDAVIT FOR NON APPLICABLE NOC

Uploaded on: 20-11-2024

AKS SIZRA

Uploaded on: 20-11-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-11-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-11-2024

COLLABORATION AGREEMENT PART 1

Uploaded on: 20-11-2024

EXECUTED ADDENDUM AGREEMENT DT. 13.08.2024

Uploaded on: 20-11-2024

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 20-11-2024

SALE DEED HAYATPUR 89

Uploaded on: 20-11-2024

SALE DEED

Uploaded on: 20-11-2024

STRUCTURAL PLAN

Uploaded on: 20-11-2024

Statutory Approvals

SERVICE ESTIMATES APPROVALDate: 27-12-2023Status: ALREADY BEEN OBTAINED
SEWERAGE CONNECTION APPROVALDate: 18-07-2022Status: ALREADY BEEN OBTAINED
STORM WATER CONNECTIONDate: 14-07-2022Status: ALREADY BEEN OBTAINED
ELECTRIFICATION LOAD APPROVALDate: 18-11-2022Status: ALREADY BEEN OBTAINED
LICENSE APPROVALDate: 18-04-2022Status: ALREADY BEEN OBTAINED
ZONING PLAN APPROVALDate: 20-04-2022Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 20-09-2023Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCEDate: 15-03-2022Status: ALREADY BEEN OBTAINED
FOREST NOC APPROVALDate: 21-01-2022Status: ALREADY BEEN OBTAINED
ARAVALLI NOC APPROVALDate: 27-06-2022Status: ALREADY BEEN OBTAINED
WATER SUPPLY NOCDate: 18-07-2022Status: ALREADY BEEN OBTAINED
ENVIRONMENT APPROVALDate: 09-02-2023Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 10-01-2024Status: ALREADY BEEN OBTAINED
LOIDate: 04-01-2022Status: ALREADY BEEN OBTAINED
ROAD ACCESSDate: 10-06-2022Status: ALREADY BEEN OBTAINED
MINING PERMISSIONDate: 22-09-2023Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
UNDERGROUND WATER TANKSUBMITTED TO HUDA
RAIN WATER HARVESTINGSUBMITTED TO HUDA
ELECTRIFICATION COSTAS PER PROJECT REPORT
STPSUBMITTED TO HUDA

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ABHISHEK GUPTA
Name
ABHISHEK GUPTA
PAN
XXXX070N
Email
abhishek.vsgroup@gmail.com
Mobile
9911043014
Landline
01244301537
Address
2333 Gali No. 6 Aggarwal Colony Bahadurgarh Jhajjar Haryana-124507

Managing Director/CEO

VIRENDER GUPTA
Name
VIRENDER GUPTA
PAN
XXXX713E
Email
virender.gupta@cprohini.com
Mobile
9911043014
Landline
01244301537
Address
H.No. 23 Road No. 72 West Punjabi Bagh Delhi-110026

Directors

SOURABH GUPTA
Name
SOURABH GUPTA
PAN
XXXX092P
Email
saurabhgupta28@yahoo.in
Mobile
9911043014
Landline
01244301537
Address
H. No. 6 Third Floor Road No. 40 West Punjabi Bagh Delhi-110026
MUKUL GUPTA
Name
MUKUL GUPTA
PAN
XXXX879H
Email
mukulgupta605@gmail.com
Mobile
9911043014
Landline
01244301537
Address
H. No. 6 Third Floor Road No. 40 West Punjabi Bagh Delhi-110026

Contact Details

Project ContactEmail: peeragebuildwell@gmail.comMobile: 9911043014Landline: 01244301537
Project Contact PersonName: ABHISHEK GUPTAEmail: peeragebuildwell@gmail.comMobile: 9911043014Landline: 01244301537

Land Details

Land Area3.9625 (Acre)
Proposed FAR174.99
Permissible FAR175
Total Licensed Land3.9625 (Acre)

Land Usage

Land Cost1263.27 Lakhs
Other Cost8845.50 Lakhs
Estimated Project Cost18608.77 Lakhs
Estimated Infrastructure Cost801.39 Lakhs
Estimated Apartment Construction Cost7698.61 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System3.273.273.273.27
Electrification Cost-000
Other0000
Parks and Playgrounds0.540.540.540.54
Rain water harvesting-000
Roads & Pavements7.077.077.077.07
STP-000
Security and Firefighting services-000
Sewerage treatment & garbage disposal3.093.093.093.09
Shopping area0000
Storm Water Drainage2.822.822.822.82
Street Light-000
Underground tank-000
Water Supply System5.885.885.885.88
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System3.273.276.536.53
Electrification Cost00010
Other0000
Parks and Playgrounds0.540.541.091.09
Rain water harvesting01.42.12.1
Roads & Pavements7.077.0714.1314.13
STP4.034.034.033.36
Security and Firefighting services16.316.316.313.59
Sewerage treatment & garbage disposal3.093.096.176.17
Shopping area0000
Storm Water Drainage2.822.825.645.64
Street Light0001.52
Underground tank5.945.945.944.95
Water Supply System5.885.8811.7611.76
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System6.536.536.536.53
Electrification Cost20202020
Other0000
Parks and Playgrounds1.091.091.091.09
Rain water harvesting2.12.12.11.4
Roads & Pavements14.1314.1314.1314.13
STP4.033.364.033.36
Security and Firefighting services16.313.5916.313.59
Sewerage treatment & garbage disposal6.176.176.176.17
Shopping area0000
Storm Water Drainage5.645.645.645.64
Street Light3.043.043.043.04
Underground tank5.944.955.944.95
Water Supply System11.7611.7611.7611.76
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System6.53---
Electrification Cost10---
Other0---
Parks and Playgrounds1.09---
Rain water harvesting0.7---
Roads & Pavements14.13---
STP3.36---
Security and Firefighting services13.59---
Sewerage treatment & garbage disposal6.17---
Shopping area0---
Storm Water Drainage5.64---
Street Light1.52---
Underground tank4.95---
Water Supply System11.76---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSECONCRETE FLOORING
WALL FINISHING DETAILSPLASTER/WHITEWASH
KITCHEN DETAILSNA
BATHROOM FITTINGSEQUIVALENT TO REPUTED BRANDS
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESALUMINUM AND GLASS
GLASS WORKNA
ELECTRIC FITTINGSREPUTED BRANDS
CONDUCTING AND WIRING DETAILSMS/PVC CONDUIT & REPUTED ALUMINIUM/COPPER WIRE
CUPBOARD DETAILSNA
WATER STORAGEPVC TANKS/CONCRETE
LIFT DETAILS8 NO. OF LIFTS
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSEXTERNAL
DOORSNA
MAIN DOORSWOODEN/ALUMINIUM GLASS/SHUTTER
INTERNAL DOORSNA
AIR CONDITIONINGNA
ELECTRICAL FITTINGSREPUTED BRAND
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEAS PER DESIGN
INTERNAL FINISHINGAS PER DESIGN

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORNA
WALLSNA
CEILINGNA
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNA
WALLSNA
CEILINGNA
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:1263000
cheque no:7418
draft date:02-09-2024
payable to:HRERA Gurugram
payee bank:KARNATAKA BANK LIMITED, SECTOR-9, ROHINI, DELHI-110085