NEWActive

URBAN HOMES-II EXTENSION

GURUGRAM, GURGAON
22-07-2020
Launch Date
NEW
Type
2023-11-15
Completion Date

Overview

Launch Date

22-07-2020

Completion Date

2023-11-15

RERA ID

RERA-GRG-713-2020

Basic Details

Project NameURBAN HOMES-II EXTENSION
Project IDRERA-GRG-713-2020
Project TypeNEW
Applicant TypeCompany
Submission Date22-07-2020 07:54:56 PM
Builder NamePYRAMID INFRATECH PRIVATE LIMITED
CINU45400HR2008PTC038509
PANXXXX801B
EmailCUSTOMERCARE@PYRAMIDINFRATECH.COM
Websitehttp://pyramidinfratech.com
Phone (Mobile)9811000240
Phone (Landline)1244274045
Registered Address217A-B, SUNCITY BUSINESS TOWER GOLF COURSE ROAD SECTOR-54
Project AddressVILLAGE BADHA, SECTOR-86
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameHDFC BANK, ONE HORIZON CENTRE GURUGRAM
Account Number50200050082812
IFSC CodeHDFC0009465
MICR Code110240520
Branch Code009465

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)DINESH KUMAR AND BRAHM AUTHORISED SEVERALLY
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)AS PER ANNEXURE ATTACHED

Development Details

Land Area1.5 (Acre)
Proposed FAR2.25
Permissible FAR2.25 FOR RESIDENTIAL 1.75 FOR COMMERCIAL
Total Licensed Land1.5 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.210
CONSTRUCTION OF ROADS0.540
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0.330
VEHICLE PARKINGS0.312
ELECTRICITY SUB-STATION0.001
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
RAIN WATER HARVESTING0.001
AREA UNDER COMMERCIAL UNITS0.106
Total1.5

Cost Details

Land Cost892.31 Lakhs
Other Cost794.06 Lakhs
Estimated Project Cost4250.23 Lakhs
Estimated Infrastructure Cost283.76 Lakhs
Estimated Apartment Construction Cost2280.11 Lakhs

Documents

CA CERTIFICATE FOR REP I

Uploaded on: 22-07-2020

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 22-07-2020

EDC II

Uploaded on: 22-07-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 22-07-2020

DEMARCATION PLAN

Uploaded on: 21-07-2020

ANNUAL REPORT 2019

Uploaded on: 22-07-2020

BR III

Uploaded on: 22-07-2020

CA CERTIFICATE OF PROMOTER

Uploaded on: 22-07-2020

TREE CUTTING AFFIDAVIT

Uploaded on: 22-07-2020

JAMABANDI

Uploaded on: 22-07-2020

MOA & AOA

Uploaded on: 22-07-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 21-07-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 21-07-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 21-07-2020

BANK UNDERTAKING

Uploaded on: 22-07-2020

DD

Uploaded on: 22-07-2020

LICENSE ENTRY IN REVENUE RECORD

Uploaded on: 22-07-2020

BANK AFFIDAVIT

Uploaded on: 22-07-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 21-07-2020

ANNUAL REPORT 2017

Uploaded on: 22-07-2020

NOC DRINKING WATER

Uploaded on: 22-07-2020

PROJECT REPORT

Uploaded on: 22-07-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 21-07-2020

LETTER DEMARCATION PLAN

Uploaded on: 22-07-2020

NOC HEIGHT CLEARANCE

Uploaded on: 22-07-2020

SERVICE ESTIMATE

Uploaded on: 22-07-2020

SUPERIMPOSED DEMARCATION

Uploaded on: 22-07-2020

FIRE ACKNOWLEDGEMENT SLIP

Uploaded on: 22-07-2020

GPA

Uploaded on: 22-07-2020

ZONING PLAN

Uploaded on: 21-07-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 22-07-2020

BOARD RESOLUTION FOR BANK

Uploaded on: 22-07-2020

ANNUAL REPORT 2018

Uploaded on: 22-07-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-07-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 22-07-2020

ENVIRONMENT ACKNOWLEDGEMENT SLIP

Uploaded on: 22-07-2020

LOI

Uploaded on: 22-07-2020

SEARCH REPORT

Uploaded on: 22-07-2020

NOC SEWERAGE CONNECTION

Uploaded on: 22-07-2020

EDC I

Uploaded on: 22-07-2020

LC IV

Uploaded on: 22-07-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 22-07-2020

NOC ARAWALI

Uploaded on: 22-07-2020

COLLABORATION AGREEMENT

Uploaded on: 22-07-2020

NOC FOREST

Uploaded on: 22-07-2020

NOC STP WATER

Uploaded on: 22-07-2020

SIJRA

Uploaded on: 22-07-2020

PERT CHART

Uploaded on: 22-07-2020

POWER ASSURANCE CERTIFICATE

Uploaded on: 22-07-2020

Statutory Approvals

ZONING PLAN APPROVAL VIDE NO. 6966Date: 22-11-2018Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATES APPROVAL VIDE MEMO NO.87402Date: 18-06-2020Status: ALREADY BEEN OBTAINED
BUILDING PLAN MEMO NO. ZP-1068/AD(RA)/2020/9927Date: 15-06-2020Status: ALREADY BEEN OBTAINED
LICENSE 78 OF 2018Date: 17-11-2018Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCE VIDE NO. PALM/NORTH/B/012419/366326Date: 19-01-2019Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCE VIDE NO. SIA/HR/MIS/156710/2020Date: 09-06-2020Status: APPLIED FOR BUT YET TO RECEIVE
FIRE SCHEME APPROVAL FS/2020/188 DATED 04.08.2020Date: 02-03-2020Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
SERVICE AND RESURFACING OF ROADYET TO BE PREPARED

NOC

ROADSProvider: NAApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

DINESH KUMAR
Name
DINESH KUMAR
PAN
XXXX710E
Email
DINESH.S@PYRAMIDINFRATECH.COM
Mobile
9811000240
Landline
1244274045
Address
B27 DLF PHASE-I GURUGRAM

Managing Director/CEO

DINESH KUMAR
Name
DINESH KUMAR
PAN
XXXX710E
Email
DINESH.S@PYRAMIDINFRATECH.COM
Mobile
9811000240
Landline
1244274045
Address
B27 DLF PHASE-I GURUGRAM

Directors

BRAHM DUTT
Name
BRAHM DUTT
PAN
XXXX543J
Email
BRAHM@PYRAMIDINFRATECH.COM
Mobile
9811000240
Landline
1244274045
Address
H.NO.556 SECTOR-52 GURUGRAM
DINESH KUMAR
Name
DINESH KUMAR
PAN
XXXX710E
Email
DINESH.S@PYRAMIDINFRATECH.COM
Mobile
9811000240
Landline
1244274045
Address
B27 DLF PHASE-I GURUGRAM

Contact Details

Project ContactEmail: CUSTOMERCARE@PYRAMIDINFRATECH.COMMobile: 9911971197Landline: 1244274045
Project Contact PersonName: RAGHUNATHA A JEmail: raghunatha@pyramidinfratech.comMobile: 9911971197Landline: 1244274045

Land Details

Land Area1.5 (Acre)
Proposed FAR2.25
Permissible FAR2.25 FOR RESIDENTIAL 1.75 FOR COMMERCIAL
Total Licensed Land1.5 (Acre)

Land Usage

Land Cost892.31 Lakhs
Other Cost794.06 Lakhs
Estimated Project Cost4250.23 Lakhs
Estimated Infrastructure Cost283.76 Lakhs
Estimated Apartment Construction Cost2280.11 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System0---
Other0---
Parks and Playgrounds0.25---
Roads & Pavements3---
SERVICE AND RESUFACING OF ROAD----
STREET LIGHTS0.25---
Sewerage treatment & garbage disposal18---
Shopping area0---
Storm Water Drainage5---
Water Supply System15---
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-00-
Electricity Supply System-00-
Other-00-
Parks and Playgrounds-0.50.86-
Roads & Pavements-545.14-
SERVICE AND RESUFACING OF ROAD--61.67-
STREET LIGHTS-0.55.01-
Sewerage treatment & garbage disposal-1525.67-
Shopping area-00-
Storm Water Drainage-510.91-
Water Supply System-2517-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEI PS FLOORING
WALL FINISHING DETAILSOBD PAINT
KITCHEN DETAILSSTONE COUNTER WITH TILE
BATHROOM FITTINGSPVC
WOOD WORK ETCDOOR FRAME AND SHUTTERS
DOORS AND WINDOS FRAMESEXTERNAL D/W M S- Z SECTION
GLASS WORKEXTERNAL DOOR WINDOW
ELECTRIC FITTINGSAS PER STANDARD
CONDUCTING AND WIRING DETAILSAS PER STANDARD
CUPBOARD DETAILSNA
WATER STORAGEOVER HEAD TANK
LIFT DETAILSAS PER STANDARD
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSGLASS PANELS
DOORSNA
MAIN DOORSSKIN DOOR
INTERNAL DOORSFLUSH DOOR
AIR CONDITIONINGNA
ELECTRICAL FITTINGSAS PER STANDARD
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORCERAMIC TILE
WALLS1200 MM HIGH CERAMIC TILE
CEILINGGRID FALSE CEILING
COUNTERSNA
SANITARY WARE/CP FITTINGSCHINAWARE ,PVC
FIXTURESWASH BASIN AND EUROPEAN WC
KITCHEN
FLOORIPS FLOORING
WALLSTILE, OBD
CEILINGOBD PAINT
COUNTERSRCC COUNTER WITH STONE SLAB
FIXTURESKITCHEN SINK
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORCERAMIC TILE
WALLS & CEILINGTEXTURE, CEILING -OBD
RAILINGS1290 MM RCC WALL
FIXTURESNA
BED ROOMS
FLOORIPS FLOORING
WALLSOBD PAINT
CEILINGOBD PAINT
WARDROBESNA
MASTER TOILET
FLOORIPS FLOORING
WALLSOBD PAINT
CEILINGOBD PAINT
COUNTERSNA
SANITARY WARE/CP FITTINGSCHINAWARE, PVC
FITTING/FIXTURESPVC
MASTER BEDROOM/DRESSROOM
FLOORIPS FLOORING
WALLSOBD PAINT
CEILINGOBD PAINT
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORIPS FLOORING
WALLSOBD PAINT
CEILINGOBD PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:309899
cheque no:672983
draft date:25-06-2020
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LIMITED
Payment 2
amount:135372
cheque no:672982
draft date:25-06-2020
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK LIMITED