Launch Date
Completion Date
RERA ID
28.69921
77.42687
Designated Plot is Demarcated as per the Sanctioned Plan issued by the Authority
1800-2100 MM high along entire periphery
Cement Concrete Internal Roads (CC Roads the 2 Corse of WBM)
Footpaths in Interlockings Pavers
Water to be Provided by the GDA and the Developers will make the UGT of Capacity as per Norms
Main Sewer Line has been designed as per norms and partially lay in basement ceiling and will finally connect to STP
Underground Systems using UPVC (SN-4) and Mesonary Chambers Sewer Pipes
Landscaping and Trees Planting has been Designed as per the Authority Guidelines
Landscaping and Trees Planting has been Designed as per the Authority Guidelines
Design has been done as per UP Electricity Board Guidelines and shall be Provided Necessary Switches gear etc. for distributing electricity as low voltage
Club has been Designed as per the Authority Norms
STP of Capacity as per Norms shall be Provided. Treated Water shall be used for Flushing, Irrigation, car wash, pathway cleaning etc., and surplus water shall be discharged into drain with due approval from competent authority
Manual Collection and Organic Waste Converter shall be Provided in the Project
Recycling of Treated Water and Rain Water Systems to be Provided
Multi Point Metering for individual apartment owners shall be there for Energy Purchased from UPPCL
Fire Tender Path shall be Provided as per NBC. Fire Fighting Systems along with pumps and Water Storage tanks shall be provided as per norms and fire NOC shall be taken from competent authority
Shall be Provided as per Building Bye Laws of GDA
Mock Drills shall be Conducted as per NBC Rules and Guidlines
All work done on time
Showing 10 blocks with 49 units
Total Carpet Area
9788.97 m²
105367.49 ft²
Total Units
87
4 different types
Blocks & Floors
10
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5852.70 m²
62997.88 ft²
Processing Time
60 days
From application to approval
03-08-2023
02-10-2023