TRG THE MALL

Ghaziabad, Uttar Pradesh
01-05-2025
Launch Date
New
Type
31-01-2030
Completion Date

Overview

Launch Date

01-05-2025

Completion Date

31-01-2030

RERA ID

UPRERAPRJ378928/05/2025

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)6378
Project NameTRG THE MALL
Registration Fee (in Rs.)74000
AddressKHASRA NO. 77 MI
Village/Locality/Sector etc.VILLAGE DUNDAHERA, GHAZIABAD
StateUttar Pradesh
Project Duration (In month)57
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-05-2025
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)4646
Proposed Completion Date31-01-2030

Location

Latitude

28.6256

Longitude

77.4256

Bank Details

Account Details
Name of the AccountTrisol Red Developers LLP Collection account for TRG THE MALL
Account Number071805005082
Bank NameICICI BANK
Branch NameINDIRAPURAM
Branch AddressPLOT NO. -03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPUAM
IFSC CodeICIC0000718
Branch DistrictGhaziabad
Branch StateUttar Pradesh
Branch Email Addresskumar.mithlesh@icicibank.com
Separate Account Details
Name of the AccountTrisol Red Developers LLP Separate Account for TRG THE MALL
Account Number071805005084
Bank NameICICI BANK
Branch NameINDIRAPURAM GHAZIABAD
Branch AddressPLOT NO. 3, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAM
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC00007148
Transaction Account Details
Name of the AccountTrisol Red Developers LLP Transaction Account for TRG THE MALL
Account Number071805005083
Bank NameICICI BANK
Branch NameINDIRAPURAM, GHAZIABAD
Branch AddressPLOT NO. 03, ADITYA CITY CENTRE, VAIBHAV KHAND, INDIRAPURAM, GHAZIABAD
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeICIC0000718

Development Works

Demarcation of Plots

SOUTH SIDE- 7.12 MTR., 6.23 , 7.96 , 1.86, 12.18, 10.77, 11.82, 10.68 MTR. WEST SIDE - 131.00, 13.68 MTR. NORTH SIDE - 6.04, 50.09 MTR. EAST SIDE - 15.90, 1.29, 29.39, 48.82, 18.63 MTR.

Boundary Wall

APPROXIMATLY 200 MT. LONG BOUNDARY WALL TO BE CONSTRUCTED IN RCC/BRICK WORK AS PER STRUCTURE DESIGN.

Road Work

INTERNAL ROAD TO BE DEVELOPED IN BITUMEN/INTERLOCKING BLOCKS/TRIMIX AS PER SPECIFICATION. TOTAL ROAD AREA WILL BE 1300 SQM.

Footpaths

FOOTPATHS TO BE CONSTRUCTED FOR PEDASTRAINS AS PER NECESSARY GUIDELINES. APPROX. AREA OF FOOTPATH WILL BE 260 SQM.

Water Supply Including Drinking Water Facilities

NECESSARY WATER SUPPLY FACILITY SHALL BE PROVIDED AS PER CALCUALATION BASD UPON THE NBC AND POLLUTION NOC OBTAINED FROM POLLUTION CONTROL BOARD.H OWEVER OVERHEAD WATER TANKS AND UNDER GROUND WATER TANKS SHALL BE DESIGNED ON THE PER PERSON WATER REQUIREMENT. i.e. 45 LTR PER PERSON. (DONMESTIC +FLUSHING)

Sewer System

SEWERAGE SYSTEM SHALL BE PROVIDED BASED UPON THE CALCULATION OF DISCHARGE OF SOIL AND WASTE PRODUCT GENERATION SHALL BE TREATED IN STP AND SURPLUS TO BE DISCHARGED IN THE MUNCIPAL SEWER. AVG .DISCHARGE 15KLD.

Drain

DRAINAGE SYSTEM WILL BE PROVIDED ON THE BASIS OF COMPLIANCE OF NBC WITH CALCULATION OF AVERAGE RAIN FALL. i.e. 45 mm/hr.

Parks

10 PERCENT GREEN AREA TO BE PROVIDED WITH OUTDOOR AMENITIES OF PLAY AREA. PROPOSED AREA FOR GRREN IS 700 SQM.

Tree Planting

TREE PLANTATION WITH EVERGREEN AND SEASONAL CATEGORY ALONG WITH THE BOUNDARY WALL AND IN THE LANDSCAPE AREA TO BE DEVELOPED.

Design For Electric Supply Including Street Lighting

ELECTRICAL SUPPLY SYSTEM WILL BE PROVIDED ACCORDING TO THE ELECTRICAL LOAD CALCULATION TOTAL LOAD IS EVALUATED APPROXIMATELY 2000 KVA., provided with TWO TRANSFOREMERS OF 1000 KVA EACH AND 2 DG OF 750KVA EACH.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

STP SHALL BE PROVIDED OF 50 KL IS PROPOSED HOW EVER SHALL BE DESIGNED ACCORDING TO THE REQUIREMENT FURTHER .

Solid Waste Management And Disposal System

ORGANIC WASTE CONVERTER SHALL BE PROVIDED IN THE BUILDING WITH TRASH SEGREGATION MECHANISM . AND FURTHER DECOMPOSE THIS INTO MICRO PARTICLE , MAY BE UTILIZED FOR FERTILIZERS.

Water Conservation System

RAIN WATER HARVESTING SYSTEM . 2 NOS. OF RECHARGE WELL ARE PROVIDED IN THE DEVELOPMENT SCHEME.

Energy Management System Including Use of Renewable Energy

VFD IN PUMP ROOM TO SAVE THE ENERGY BASED UPON AUTO STRAT STOP FUNCTION TO REDUCE THE OVERALL POWER CONSUMPTION. SOLAR CELLS ARE PROPOSED ON THE ROOF TOP TO PRODUCE THE ELECTRICITY FOR WATER HEATING AND OTHER NECCESSARY UTILIZATIONS.

Fire Protection And Fire Safety System

FIRE PROTECTION SYSTEM IS PROPOSED IN THE BUILDING WHICH COMPRISES UNDERGROUND WATER TANK WITH PUMP ROOM, FIRE SHAFT, HOSEREEL AND OTHER FIRE FIGHTING EQUIPMENTS.

Social Infrastructure And Other Public Amenities Including Public Health Services

SINCE PROPOSED BUILDING IS COMMERCIAL PROJECT, ALL THE BASIC PUBLIC AMENITIES SHALL BE PROVIDED IN THE BUILDING SUCH AS FIRST AID FACILITY, REST ROOMS, LOBBIES ETC.

Emergency Evacuation Services

ACCORDING TO THE NBC , EMERGENCY EVACUTION ROUTE ARE PLANNED IN THE BUILDING . ALSO ADEQUATE NUMBER OF STAIRCASE ARE PROVIDED KEEPING EMERGENCY SITUATION IN MIND.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 3047 | Date: 18-03-2025

Extract of Khatauni

No: 1431 | Date: -

Extract of Khatauni

No: Imposed Khasra | Date: -

Registry Document

No: 6011 | Date: 22-05-2025

Other Plan(If Any)

Proforma of Conveyance Deed

Proforma of Conveyance Deed

Waste Disposal Plan

Water Supply Plan

Other

Details of Encumbrances

Uploaded: 31-03-2025

Commencement Certificate

Uploaded: 18-03-2025

Other Plan(If Any)

Uploaded: 24-04-2025

Proforma of Application Form

Uploaded: 18-03-2025

Proforma of Allotment Letter

Uploaded: 25-04-2025

Proforma of Conveyance Deed

Uploaded: 01-05-2025

Proforma of Completion Certificate(Occupancy)

Uploaded: 18-03-2025

Waste Disposal Plan

Uploaded: 26-04-2025

Water Supply Plan

Uploaded: 26-04-2025

Electricity Supply Plan

Uploaded: 26-04-2025

Development Work Plan

Uploaded: 18-03-2025

Affidavit

Uploaded: 25-04-2025

CA CERTIFICATE

Uploaded: 31-03-2025

ARCHITECT CERTIFICATE

Uploaded: 31-03-2025

ENGINEERS CERTIFICATE

Uploaded: 18-03-2025

Other

Uploaded: 25-04-2025

Proforma of Agreement for Sale

Uploaded: 18-03-2025

Permits

Orignal Permit NoCOMMERCIAL BUILDING/08522/GDA/BP/24-25/0100/29012025
Orignal Permit Date10-02-2025
Valid Upto09-02-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-02-2033
End Date31-01-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)GAURAV HOMES
Contractor AddressD-1, SECTOR-07, NOIDA
Architect NameRAHUL GUPTA
Architect AddressD-1, SECTOR-07, NOIDA
Architect Licence NumberCA/2010/48921
Structural Engineer NameYG CONSULTING ENGINEERS
Structural Engineer AddressINDIRAPURAM, GHAZIABAD
Mobile number(Project Co-ordinator)9811815529

Land Details

AFS

Showing 1 blocks with 260 units

Property Summary

Total Carpet Area

7530.60 m²

81058.63 ft²

Total Units

631

2 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:11.93 m²
Balconies:0
Parking ratio:0.00 per unit

Block TRG THE MALL

260 units

Khasra Details

Total Area

6378.00 m²

68652.15 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No77 mi
Area(In Sq. Mt.)6378

Other Details

Contractor Name (if any)GAURAV HOMES
Contractor AddressD-1, SECTOR-07, NOIDA
Architect NameRAHUL GUPTA
Architect AddressD-1, SECTOR-07, NOIDA
Architect Licence NumberCA/2010/48921
Structural Engineer NameYG CONSULTING ENGINEERS
Structural Engineer AddressINDIRAPURAM, GHAZIABAD
Mobile number(Project Co-ordinator)9811815529