ONGOINGActive

TOWN SQUARE (BLOCK-D)

GURUGRAM, MANESAR
21-01-2020
Launch Date
ONGOING
Type
2018-12-31
Completion Date

Overview

Launch Date

21-01-2020

Completion Date

2018-12-31

RERA ID

RERA-GRG-503-2019

Basic Details

Project NameTOWN SQUARE (BLOCK-D)
Project IDRERA-GRG-503-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date21-01-2020 01:56:40 AM
Builder NameVATIKA LIMITED
CINU74899HR1998PLC054821
PANXXXX647G
Emailvatika.rera@vatikagroup.com
Websitehttp://www.vatikagroup.com
Phone (Mobile)9810566938
Phone (Landline)01244177777
Registered AddressVATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
Project AddressSECTOR 82A, VILLAGE-SHIKOHPUR, TEHSIL-MANESAR
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameHDFC BANK LTD., FIP, M.G. ROAD, GURUGRAM HARYANA-122002
Account Number50200029312292
IFSC CodeHDFC0000280
MICR Code110240037
Branch Code0280

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1.Mr. Anil Bhalla Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 2.Mr. Gautam Bhalla LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 3. Mr. K V George Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 4. Mrs Veena Bhomia C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area2.961 (Acre)
Proposed FAR172.941
Permissible FAR175
Total Licensed Land2.961 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4430.258
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS1832.906
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER5719.559
Total11982.723

Cost Details

Land Cost105.00 Lakhs
Other Cost5586.00 Lakhs
Estimated Project Cost10691.00 Lakhs
Estimated Infrastructure Cost500.00 Lakhs
Estimated Apartment Construction Cost4500.00 Lakhs

Documents

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 21-01-2020

20 DETAIL OF UNIT

Uploaded on: 21-01-2020

BLOCK D 12TH 13TH FLOOR PLAN

Uploaded on: 21-01-2020

23 ARCHITECT AND ENGINEER CERTIFICATE

Uploaded on: 21-01-2020

9 REVENUE RECORDS SALE DEED ETC

Uploaded on: 21-01-2020

12 LOCATION PLAN

Uploaded on: 21-01-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 21-01-2020

1 REP I

Uploaded on: 21-01-2020

2 REGISTRATION CERTIFICATE

Uploaded on: 21-01-2020

8 RESOLUTION

Uploaded on: 21-01-2020

10 PROJECT DESCRIPTION AND COST

Uploaded on: 21-01-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 21-01-2020

BLOCK D 8TH 9TH FLOOR PLAN

Uploaded on: 21-01-2020

TOWER D ALL FLOOR AREA CALCULATION

Uploaded on: 21-01-2020

BLOCK D GF 1ST FLOOR PLAN

Uploaded on: 21-01-2020

TOWER D ELEVATION D

Uploaded on: 21-01-2020

2 PART OCCUPATION CERTIFICATE OF TOWN SQUARE

Uploaded on: 21-01-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 21-01-2020

ZONING PLAN

Uploaded on: 21-01-2020

32 ALLOTTMENT LETTER COMMERCIAL

Uploaded on: 21-01-2020

BLOCK D 4TH 5TH FLOOR PLAN

Uploaded on: 21-01-2020

4 MOA AOA

Uploaded on: 21-01-2020

22 DEVELOPMENT WORK PLAN

Uploaded on: 21-01-2020

BLOCK D 14TH TERRACE FLOOR PLAN

Uploaded on: 21-01-2020

30 ENCUMBRANCES

Uploaded on: 21-01-2020

5 BALANCE SHEET

Uploaded on: 21-01-2020

25 TIME PERIOD COMMITED TO ALLOTTEE

Uploaded on: 21-01-2020

18 APPROVAL OF SERVICE PLAN OR ESTIMATE FOR COMM

Uploaded on: 21-01-2020

3 PAN CARD

Uploaded on: 21-01-2020

33 HRERA AFS COMMERCIAL FINAL

Uploaded on: 21-01-2020

BLOCK D 6TH 7TH FLOOR PLAN

Uploaded on: 21-01-2020

29 COLLECTION STATEMENT

Uploaded on: 21-01-2020

11 AKS SHEJRA WITH LAND DETAILS

Uploaded on: 21-01-2020

15 SITE PLAN

Uploaded on: 21-01-2020

19 PROJECT REPORT

Uploaded on: 21-01-2020

26 LIST OF ARCHITECT ENGINEER ETC

Uploaded on: 21-01-2020

33 HRERA AFS COMMERCIAL FINAL LEASE ARRANGEMENT

Uploaded on: 21-01-2020

TOWER D ELEVATION C

Uploaded on: 21-01-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-01-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 21-01-2020

18 IDW DESIGN AND COST ESTIMATES

Uploaded on: 21-01-2020

21 ANNEXURE 3 3

Uploaded on: 21-01-2020

24 CA CERTIFICATE

Uploaded on: 21-01-2020

BLOCK D 2ND 3RD FLOOR PLAN

Uploaded on: 21-01-2020

TOWER D SECTION 2 AND 5

Uploaded on: 21-01-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 21-01-2020

7 SHAREHOLDERS

Uploaded on: 21-01-2020

6 LIST OF DIRECTORS

Uploaded on: 21-01-2020

13 SECTORIAL MAP

Uploaded on: 21-01-2020

21 DETAIL OF PARKING

Uploaded on: 21-01-2020

34 CONVEYANCE DEED COMMERCIAL_FINAL

Uploaded on: 21-01-2020

31 BOOKING APPLICATION FORM COMMERCIAL_FINAL

Uploaded on: 21-01-2020

BLOCK D 10TH 11TH FLOOR PLAN

Uploaded on: 21-01-2020

TOWER D ELEVATION A AND B

Uploaded on: 21-01-2020

TOWER D SECTION 3

Uploaded on: 21-01-2020

TOWER D TOILET DETAIL

Uploaded on: 21-01-2020

Statutory Approvals

LAY OUT PLANDate: 15-03-2013Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 30-12-2010Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 15-03-2013Status: ALREADY BEEN OBTAINED
SITE PLANDate: 15-03-2013Status: ALREADY BEEN OBTAINED
FLOOR PLANDate: 15-03-2013Status: ALREADY BEEN OBTAINED
APARTMENT PLANSDate: 15-03-2013Status: ALREADY BEEN OBTAINED
ELEVATION SECTIONDate: 15-03-2013Status: ALREADY BEEN OBTAINED
SERVICE ESTIMATEDate: 30-12-2013Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: HUDA/HSVPApproval Status: Pending
WATER SUPPLYProvider: HUDA/HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA/HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HUDA/HSVPApproval Status: Pending

Project Team

Authorized Representative

MR VIRENDER DHAR
Name
MR VIRENDER DHAR
PAN
XXXX232D
Email
vatika.rera@vatikagroup.com
Mobile
9810566938
Landline
01244177777
Address
Flat No. M-113SF Blossom-2 Artemis Hospital Sector-51 Gurgaon Smaspur Gurgaon- 122003.

Managing Director/CEO

MR GAUTAM BHALLA
Name
MR GAUTAM BHALLA
PAN
XXXX807G
Email
vatika.rera@vatikagroup.com
Mobile
9958999160
Landline
01244177777
Address
Farm No 4 Hyde Park Sultanpur Farm Mehrauli Delhi 110030 India.

Directors

MR ANIL BHALLA
Name
MR ANIL BHALLA
PAN
XXXX416N
Email
vatika.rera@vatikagroup.com
Mobile
9871196506
Landline
01244177777
Address
Farm No- 4 Hyde Park Prakriti Marg Sultanpur Farms Mehrauli Delhi- 110030 India.
MR BRIJ KISHORE SINGH
Name
MR BRIJ KISHORE SINGH
PAN
XXXX890G
Email
vatika.rera@vatikagroup.com
Mobile
9928017864
Landline
01244177777
Address
Baluda Road Sohna Gurgaon Haryana-122001 India.
MR VIJENDER KUMAR
Name
MR VIJENDER KUMAR
PAN
XXXX305H
Email
vatika.rera@vatikagroup.com
Mobile
9871196504
Landline
01244177777
Address
House No. 51 Village Naharpur Kasan Galleria Gurugram - 122009.

Contact Details

Project ContactEmail: vatika.rera@vatikagroup.comMobile: 8800348703Landline: 0000000000
Project Contact PersonName: ARUP KUMAR DASEmail: vatika.rera@vatikagroup.comMobile: 8800348703Landline: 1244177777

Land Details

Land Area2.961 (Acre)
Proposed FAR172.941
Permissible FAR175
Total Licensed Land2.961 (Acre)

Land Usage

Land Cost105.00 Lakhs
Other Cost5586.00 Lakhs
Estimated Project Cost10691.00 Lakhs
Estimated Infrastructure Cost500.00 Lakhs
Estimated Apartment Construction Cost4500.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP25.56
Other0
Shopping area0
Street lighting38.34
Roads & Pavements115.02
Water Supply System34.08
Storm Water Drainage42.6
Parks and Playgrounds0
Rain Water Harvesting8.52
Electrical Sub station42.6
Electricity Supply System63.9
Security and fire fighting12.78
Clubhouse/community centres0
Sewerage treatment & garbage disposal42.6

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electrical Sub station--1.481.48
Electricity Supply System--1.221.22
Other--00
Parks and Playgrounds--00
Rain Water Harvesting--0.30.3
Roads & Pavements--33
STP--0.890.89
Security and fire fighting--0.440.44
Sewerage treatment & garbage disposal--0.481.68
Shopping area--00
Storm Water Drainage--0.680.48
Street lighting--1.331.33
Water Supply System--0.181.18
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electrical Sub station1.481.481.48-
Electricity Supply System2.222.224.22-
Other000-
Parks and Playgrounds000-
Rain Water Harvesting0.30.30.3-
Roads & Pavements4.254.8-
STP0.890.890.89-
Security and fire fighting0.440.440.44-
Sewerage treatment & garbage disposal1.481.482.28-
Shopping area000-
Storm Water Drainage1.481.683.08-
Street lighting1.331.331.33-
Water Supply System1.182.181.18-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
WALL FINISHING DETAILSPLASTER ON WALLS
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSSANITARY WARE OF STANDARD MAKE AND BRANDS FOR COMMON TOILETS.
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESNOT APPLICABLE
GLASS WORKNOT APPLICABLE
ELECTRIC FITTINGSNOT APPLICABLE
CONDUCTING AND WIRING DETAILSIS COMPLIANT WIRING IN COMMON AREAS.
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGEOHT & UG TANKS
LIFT DETAILSPASSENGER ELEVATORS DESIGNED TO CATER FOR THE EXPECTED TRAFFIC WITH HIGH QUALITY FINISHES. DEDICATED SERVICE LIFT FOR MOVEMENT OF GOODS AND MATERIALS.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSGLAZED ALUMINUM WINDOWS AND FENESTRATION ALONG WITH CURTAIN GLASS IN LOCATIONS
DOORSNA
MAIN DOORSNOT APPLICABLE
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGOFFICE SPACE SHALL BE AIR-CONDITIONED THROUGH VRV / HIGH WALL SPLITS
ELECTRICAL FITTINGSIS COMPLIANT LIGHT FITTINGS IN COMMON AREAS.
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL FACADE FINISHES IN MODERN AND CONTEMPORARY MATERIALS SUCH AS CLADDING, HIGH QUALITY PAINT ETC. GLAZED ALUMINUM WINDOWS AND FENESTRATION ALONG WITH CURTAIN GLASS IN LOCATIONS ACCORDING TO ELEVATION REQUIREMENTS
INTERNAL FINISHINGCOMBINATION OF ARCHITECTURALLY PLEASING MATERIALS SUCH AS STONE, HIGH QUALITY TILES, WALL AND CEILING FINISHES

Unit-wise Specifications

TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESNOT APPLICABLE
MASTER BEDROOM/DRESSROOM
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
TOILETNOT APPLICABLE
BALCONYNOT APPLICABLE

Fee Details

Payment 1
amount:277000.00
cheque no:56945
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK