THE ROSELIA

GURUGRAM, GURGAON
29-11-2019
Launch Date
ONGOING
Type
2021-05-17
Completion Date

Overview

Launch Date

29-11-2019

Completion Date

2021-05-17

RERA ID

RERA-GRG-384-2019

Basic Details

Project NameTHE ROSELIA
Project IDRERA-GRG-384-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date29-11-2019 06:14:46 AM
Builder NameFOREVER BUILDTECH PRIVATE LIMITED
CINU70109DL2012PTC241744
PANXXXX381L
Emailcomplaince@signatureglobal.in
Websitehttps://www.signatureglobal.in/
Phone (Mobile)9810899381
Phone (Landline)01149281700
Registered Address12TH FLOOR DR GOPAL DAS BHAWAN 28 BARAKHAMBA ROAD NEW DELHI 110001
Project AddressVILLAGE WAZIRPUR JHARSA SECTOR 95 A
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameYES BANK LIMITED, GROUND AND MEZZANINE FLOOR, , 56, JANPATH, ALPS BLDG, , NEXT TO PIZZA HUT, CONNAUGHT PLACE, DELHI-110001
Account Number013666200000393
IFSC CodeYESB0000136
MICR Code110532031
Branch Code0136

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Pradeep Kumar Aggarwal
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ATTACHED AS ANNEXURE

Development Details

Land Area8.034 (Acre)
Proposed FAR225
Permissible FAR225
Total Licensed Land8.034 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6533.19
CONSTRUCTION OF ROADS5288.4149
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS5711.692
VEHICLE PARKINGS14302.982
ELECTRICITY SUB-STATION457.3
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES218.814
ANY OTHER0
Total32512.3929

Cost Details

Land Cost6316 Lakhs
Other Cost3680 Lakhs
Estimated Project Cost23169 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost13173 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 29-11-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 29-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 29-11-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 29-11-2019

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 29-11-2019

Statutory Approvals

ENVIRONMENT CLEARANCE VIDE ENDST. NO. SEIAA/HR/2017/324Date: 18-05-2017Status: ALREADY BEEN OBTAINED
AIRPORT HEIGHT CLEARANCE VIDE NOCID NO. PALM/NORTH/B/120217/265774Date: 02-12-2017Status: ALREADY BEEN OBTAINED
LICENSE NO 13 OF 2016Date: 26-09-2016Status: ALREADY BEEN OBTAINED
FOREST NOC VIDE LETTER NO 2734.GDate: 06-12-2017Status: ALREADY BEEN OBTAINED
POWER ASSURANCE FROM DHBVN VIDE MEMO NO. CH. O4/DRG-PLCDate: 20-11-2017Status: ALREADY BEEN OBTAINED
SEWERAGE ASSURANCE VIDE MEMO NO. 214970Date: 15-11-2017Status: ALREADY BEEN OBTAINED
WATER ASSURANCE VIDE MEMO NO. 214061Date: 15-11-2017Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: Yes
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: GDMAApproval Status: Approved
WATER SUPPLYProvider: GDMAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GDMAApproval Status: Approved
STORM WATER DRAINAGEProvider: NAApproval Status: Approved

Project Team

Authorized Representative

RAVI AGGARWAL
Name
RAVI AGGARWAL
PAN
XXXX139H
Email
compliance@signatureglobal.in
Mobile
9810899381
Landline
01149281700
Address
34 Road No.61 Punjabi Bagh New Delhi 110026

Managing Director/CEO

SANJAY KUMAR VARSHNEY
Name
SANJAY KUMAR VARSHNEY
PAN
XXXX886M
Email
compliance@signatureglobal.in
Mobile
9810899381
Landline
01149281700
Address
Flat No.521 Plot No.1A DJA Apartments Phase-1 Sector -13 Dwarka New Delhi-11007

Directors

RAVI AGGARWAL
Name
RAVI AGGARWAL
PAN
XXXX139H
Email
compliance@signatureglobal.in
Mobile
9810899381
Landline
01149281700
Address
34 Road No.61 Punjabi Bagh New Delhi 110026
LALIT KUMAR AGGARWAL
Name
LALIT KUMAR AGGARWAL
PAN
XXXX835D
Email
compliance@signatureglobal.in
Mobile
9810899381
Landline
01149281700
Address
34 Road No.61 Punjabi Bagh New Delhi 110026

Contact Details

Project ContactEmail: compliance@sigantureglobal.inMobile: 9810899381Landline: 01244908200
Project Contact PersonName: SANJAY KUMAR VARSHNEYEmail: compliance@sigantureglobal.inMobile: 9810899381Landline: 01244908200

Land Details

Land Area8.034 (Acre)
Proposed FAR225
Permissible FAR225
Total Licensed Land8.034 (Acre)

Land Usage

Land Cost6316 Lakhs
Other Cost3680 Lakhs
Estimated Project Cost23169 Lakhs
Estimated Infrastructure Cost0 Lakhs
Estimated Apartment Construction Cost13173 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--0-
Electricity Supply System--0-
Other--0-
Parks and Playgrounds--0-
Roads & Pavements--0-
Sewerage treatment & garbage disposal--0-
Shopping area--0-
Storm Water Drainage--0-
Water Supply System--0-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED & CERAMIC TILES
WALL FINISHING DETAILSOBD
KITCHEN DETAILSISI MARKED
BATHROOM FITTINGSISI MARKED
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESWOODEN(DOOR FRAME), UPVC(WINDOW FRAME)
GLASS WORKNA
ELECTRIC FITTINGSISI MARKED
CONDUCTING AND WIRING DETAILSISI MARKED
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSNA
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSUPVC
DOORSNA
MAIN DOORSFLUSH DOOR
INTERNAL DOORSFLUSH DOOR
AIR CONDITIONINGNA
ELECTRICAL FITTINGSISI MARKED
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORVITRIFIED TILE
WALLSOBD
CEILINGOBD
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESISI MARKED
KITCHEN
FLOORVITRIFIED TILES
WALLSOBD
CEILINGOBD
COUNTERSBLACK GRANITE
FIXTURESISI MARKED
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILE
WALLSOBD
CEILINGOBD
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILE(ANTI-SKID)
WALLSCERAMIC TILE
CEILINGGRID CEILING
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESISI MARKED
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILE
WALLSOBD
CEILINGOBD
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILE
WALLSOBD
CEILINGOBD
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:921700
cheque no:124604
draft date:14-06-2017
payable to:HRERA Gurugram
payee bank:YES BANK LIMITED
Payment 2
amount:1273000
cheque no:93898
draft date:30-05-2017
payable to:HRERA Gurugram
payee bank:YES BANK LIMITED