NewActive

T HOMES PHASE-1

Ghaziabad, Uttar Pradesh
20-09-2018
Launch Date
New
Type
29-10-2024
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

29-10-2024

RERA ID

UPRERAPRJ17268

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8375
Project NameT HOMES PHASE-1
Registration Fee (in Rs.)47000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)74
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date20-09-2018
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)14375
Proposed Completion Date29-10-2024

Location

Latitude

28.653655

Longitude

77.400554

Bank Details

Account Details
Name of the AccountT AND T INFRAZONE PVT LTD
Account Number918020073081340
Bank NameAXIS BANK LIMITED
Branch NameSAHIBABAD GHAZIABAD
Branch AddressPLOT NO 1 SEC 5 RAJENDER NAGAR
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0001263
Transaction Account Details
Name of the AccountT AND T INFRAZONE PVT LTD
Account Number918020073830488
Bank NameAXIS BANK LIMITED
Branch NameSAHIBABAD GHAZIABAD
Branch AddressPLOT NO 1 SEC 5 RAJENDER NAGAR GHAZIABAD
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0001263

Development Works

Demarcation of Plots

Total plot area of 8375 Sqm. located in Plot no SP3/3, Sector-3, Siddhartha Vihar, Ghaziabad, U.P.

Boundary Wall

Suitable boundary shall be provided

Road Work

Interlocking Pavers/Wbm ROAD/Tirimix

Footpaths

Interlocking Pavers

Water Supply Including Drinking Water Facilities

One Under Ground Tank shll be provided

Sewer System

Underground system using uPVC /NP2(SN-4)  pipes.

Drain

Underground system using uPVC/NP2 (SN-4)  pipes.

Parks

Landscaping area is provided asper local building bye-laws

Tree Planting

42 Nos. trees are to be planted out of that 50% will be evergreen tree.

Design For Electric Supply Including Street Lighting

Electricity Transformers shall be used along with necessary switch-gear for distributing electricity at LT voltage

Community Buildings

Community space shall be provided

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer

Solid Waste Management And Disposal System

Manual collection shall be provided in the project

Water Conservation System

Rain water harvesting facilities shall be provided

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy.

Fire Protection And Fire Safety System

Fire tender path shall be provided as per NBC. Fire fighting system shall be provided.

Social Infrastructure And Other Public Amenities Including Public Health Services

STP shall be provided

Emergency Evacuation Services

Staircases shall be provided  in Basement & all the Towers for fire/ emergency exit as per norms.

Other Miscellaneous Work

N/A

Documents

Registry Document

No: 3319 | Date: 07-06-2017

Registry Document

No: Serial No. 1802 on Page No. 147 to 212 of Book No.1 Volume No. 7583 | Date: 18-03-2019

Registry Document

No: Serial No. 1802 on Page No. 147 to 212 of Book No.1 Volume No. 7583 | Date: 18-03-2019

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 04-08-2018

Commencement Certificate

Uploaded: 04-08-2018

Other Plan(If Any)

Uploaded: 16-09-2019

Proforma of Application Form

Uploaded: 04-08-2018

Proforma of Allotment Letter

Uploaded: 04-08-2018

Proforma of Conveyance Deed

Uploaded: 16-12-2022

Waste Disposal Plan

Uploaded: 04-08-2018

Water Supply Plan

Uploaded: 04-08-2018

Electricity Supply Plan

Uploaded: 04-08-2018

Development Work Plan

Uploaded: 04-08-2018

Affidavit

Uploaded: 04-08-2018

CA CERTIFICATE

Uploaded: 04-08-2018

ENGINEERS CERTIFICATE

Uploaded: 04-08-2018

Other

Uploaded: 24-11-2022

Permits

Orignal Permit No1871/NIPRA-52/2017/VANI-5
Orignal Permit Date30-06-2017
Valid Upto29-06-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto28-06-2025
End Date30-04-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)IN HOUSE - SELF
Contractor AddressH-138, SECTOR-63, NOIDA
Architect NameSPACE DESIGN INTERNATIONAL
Architect AddressB-34, SECTOT-67, NOIDA
Architect Licence NumberCA/98/23185
Structural Engineer NameOPTIMUM DESIGN PRIVATE LIMITED
Structural Engineer AddressB-24, SECTOR-67, NOIDA
Mobile number(Project Co-ordinator)9289322602

Land Details

AFS

Showing 5 blocks with 220 units

Property Summary

Total Carpet Area

56821.41

611619.98 ft²

Total Units

582

4 different types

Blocks & Floors

5

27 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:97.63
Balconies:737
Parking ratio:0.00 per unit

Block Block A

75 units

Block Block E

56 units

Block Tower- B

54 units

Block Commercial- 01

4 units

Block Block D

31 units

Khasra Details

Total Area

8375.00

90147.66 ft²

1 plot
Plot
TypePlot
Khasra/Plot No3/SP-03 Sector 3, Siddharth Vihar, Ghaziabad-20100
Area(In Sq. Mt.)8375

Other Details

Contractor Name (if any)IN HOUSE - SELF
Contractor AddressH-138, SECTOR-63, NOIDA
Architect NameSPACE DESIGN INTERNATIONAL
Architect AddressB-34, SECTOT-67, NOIDA
Architect Licence NumberCA/98/23185
Structural Engineer NameOPTIMUM DESIGN PRIVATE LIMITED
Structural Engineer AddressB-24, SECTOR-67, NOIDA
Mobile number(Project Co-ordinator)9289322602