NEWActive

STREET DRIVE-93

GURUGRAM, GURGAON
27-01-2024
Launch Date
NEW
Type
2028-12-31
Completion Date

Overview

Launch Date

27-01-2024

Completion Date

2028-12-31

RERA ID

RERA-GRG-1538-2024

Basic Details

Project NameSTREET DRIVE-93
Project IDRERA-GRG-1538-2024
Project TypeNEW
Applicant TypeCompany
Submission Date27-01-2024 08:06:55 PM
Builder NameGGANBU LAND PRIVATE LIMITED
CINU70109HR2021PTC100271
PANXXXX983G
Emailinfo@streetdrive93.com
Websitehttps://www.streetdrive93.com
Phone (Mobile)9871597440
Phone (Landline)Not specified
Registered AddressH NO C 50 3RD FLOOR SUSHANT LOK 2 GURUGRAM GURGAON HR 122011
Project AddressSECTOR-93, GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameHDFC BANK LIMITED, SECTOR-53, GURUGRAM
Account Number50200091512494
IFSC CodeHDFC0000572
MICR Code110240093
Branch Code000572

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Ankur Seth R/o C4, Sector-44, Noida, Gautam Buddha Nagar, Uttar Pradesh 201301 and Mr MUSOLANI R/o B-2, 2nd Floor, Khasara No 92, Freedom Fighter Enclave, Neb Sarai, South Delhi, Delhi 110068
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area0.618 (Acre)
Proposed FAR1.332
Permissible FAR1.75
Total Licensed Land15.7 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.3551
CONSTRUCTION OF ROADS0.2629
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total0.618

Cost Details

Land Cost1084.17 Lakhs
Other Cost692.15 Lakhs
Estimated Project Cost3621.29 Lakhs
Estimated Infrastructure Cost120 Lakhs
Estimated Apartment Construction Cost1724.97 Lakhs

Documents

ELECTRICAL LOAD

Uploaded on: 26-01-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 26-01-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 26-01-2024

WATER ASSURANCE

Uploaded on: 26-01-2024

SEWERAGE ASSURANCE

Uploaded on: 26-01-2024

SERVICE PLANS

Uploaded on: 26-01-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 26-01-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 26-01-2024

DEMARCATION PLAN

Uploaded on: 26-01-2024

ZONING PLAN

Uploaded on: 26-01-2024

FIRE SCHEME APPROVAL

Uploaded on: 26-01-2024

STROM WATER ASSURANCE

Uploaded on: 26-01-2024

BALANCE SHEET 2021-22

Uploaded on: 26-01-2024

BALANCE SHEET

Uploaded on: 26-01-2024

CONVEYANCE DEED

Uploaded on: 26-01-2024

SECTOR 93 GURUGRAM_APPROVED BUILDING PLAN

Uploaded on: 19-09-2024

LAW-LAND TITLE

Uploaded on: 19-09-2024

GGANBU JDA-18_12_2023

Uploaded on: 19-09-2024

LOI BOTH (1)

Uploaded on: 19-09-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 19-09-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 19-09-2024

FOREST NOC

Uploaded on: 19-09-2024

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 19-09-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 19-09-2024

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 19-09-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 19-09-2024

ABANDUM AGREEMENT

Uploaded on: 19-09-2024

BANK AFFIDAVIT

Uploaded on: 19-09-2024

CA COST INCURRED

Uploaded on: 19-09-2024

CA NO OF UNITS_INVENTORY

Uploaded on: 19-09-2024

FOREST NOC

Uploaded on: 19-09-2024

GGANBU NEC

Uploaded on: 19-09-2024

GGANBU NEW WORTH CERTIFICATE

Uploaded on: 19-09-2024

HDFC UNDERTAKING

Uploaded on: 19-09-2024

JAMABANDI COPYLATEST

Uploaded on: 19-09-2024

MUTATION COPY LATEST

Uploaded on: 19-09-2024

SUPER IMPOSE ON SAZRA PLAN

Uploaded on: 19-09-2024

SUPPLYMATERY CONVYANCE DEED

Uploaded on: 19-09-2024

Statutory Approvals

ZONING (DRG- DGTCP- 9499)Date: 21-08-2023Status: ALREADY BEEN OBTAINED
BUILDING PLAN (MEMO NO. 7514 DATED 23/11/2023)Date: 23-11-2023Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVAL(MEMO NO. FS/2024/116)Date: 22-01-2024Status: ALREADY BEEN OBTAINED
ELECTRICAL LOADDate: 17-07-2023Status: ALREADY BEEN OBTAINED
SEWAGE ASSURANCEDate: 12-09-2022Status: ALREADY BEEN OBTAINED
WATER ASSURANCEDate: 14-09-2022Status: ALREADY BEEN OBTAINED
STORM ASSURANCEDate: 12-09-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
ELECTRICAL CONNECTIONAS PER PROJECT REPORT

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ANKUR SETH
Name
ANKUR SETH
PAN
XXXX874E
Email
info@streetdrive93.com
Mobile
9871597440
Landline
01244993701
Address
C-4 Sector-44 Noida U. P

Managing Director/CEO

ANKUR SETH
Name
ANKUR SETH
PAN
XXXX874E
Email
ankurseth@elitestock.com
Mobile
9871597440
Landline
01244993701
Address
C-4 Sector-44 Noida U. P

Directors

ANKUR SETH
Name
ANKUR SETH
PAN
XXXX874E
Email
info@streetdrive93.com
Mobile
9871597440
Landline
01244993701
Address
C-4 Sector-44 Noida U. P
MANJEET SINGH
Name
MANJEET SINGH
PAN
XXXX051N
Email
info@streetdrive93.com
Mobile
9999228889
Landline
01244993701
Address
H NO C 50 3RD FLOOR SUSHANT LOK 2 GURUGRAM Gurgaon HR 122011
MUSOLANI
Name
MUSOLANI
PAN
XXXX258D
Email
exceedoinfy@gmail.com
Mobile
9872136072
Landline
N/A
Address
B-2 2nd Floor Khasara No 92 Freedom Fighter Enclave Neb Sarai South Delhi Delhi 110068

Contact Details

Project ContactEmail: info@streetdrive93.comMobile: 9871597440Landline: N/A
Project Contact PersonName: GOUTAM CHHIKARAEmail: goutamchhikara29@gmail.comMobile: 9588349423Landline: N/A

Land Details

Land Area0.618 (Acre)
Proposed FAR1.332
Permissible FAR1.75
Total Licensed Land15.7 (Acre)

Land Usage

Land Cost1084.17 Lakhs
Other Cost692.15 Lakhs
Estimated Project Cost3621.29 Lakhs
Estimated Infrastructure Cost120 Lakhs
Estimated Apartment Construction Cost1724.97 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Street light0
Fire Fighting0
Shopping area0
Electrification0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Renewable Energy System0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System002.52.5
Electrification0000
Fire Fighting0012.512.5
Other0000
Parks and Playgrounds0000
Renewable Energy System0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0022
Shopping area0000
Storm Water Drainage002.52.5
Street light0000
Water Supply System0022
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.52.500
Electrification6600
Fire Fighting12.512.500
Other0000
Parks and Playgrounds0000
Renewable Energy System3.53.500
Roads & Pavements5500
Sewerage treatment & garbage disposal2200
Shopping area0000
Storm Water Drainage2.52.500
Street light2.52.500
Water Supply System2200

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
WALL FINISHING DETAILSLIME FINISH
KITCHEN DETAILSNA
BATHROOM FITTINGSNA
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESNA
GLASS WORKNA
ELECTRIC FITTINGSAS PER NORMS
CONDUCTING AND WIRING DETAILSAS PER NORMS
CUPBOARD DETAILSNA
WATER STORAGERCC TANK IN BASEMENT
LIFT DETAILSNA
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSNA
DOORSNA
MAIN DOORSIRON SHUTTER
INTERNAL DOORSNA
AIR CONDITIONINGSPACE PROVISION FOR SPLIT AC
ELECTRICAL FITTINGSONE POINT FOR CONNECTING INTERNAL ELECTRICAL SYSTEM
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL AND INTERNAL GRADE POINT
INTERNAL FINISHINGINTERNAL GRADE POINT

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORNA
WALLSNA
CEILINGNA
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNA
WALLSNA
CEILINGNA
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:151000.00
cheque no:62377
draft date:19-01-2024
payable to:HRERA Gurugram
payee bank:HDFC BANK
Payment 2
amount:45848
cheque no:62462
draft date:27-02-2024
payable to:HRERA Gurugram
payee bank:HDFC BANK