ONGOINGActive

SOVEREIGN NEXT (PHASE-I)

GURUGRAM, MANESAR
27-01-2020
Launch Date
ONGOING
Type
2021-03-31
Completion Date

Overview

Launch Date

27-01-2020

Completion Date

2021-03-31

RERA ID

RERA-GRG-501-2019

Basic Details

Project NameSOVEREIGN NEXT (PHASE-I)
Project IDRERA-GRG-501-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date27-01-2020 02:47:44 AM
Builder NameVATIKA LIMITED
CINU74899HR1998PLC054821
PANXXXX647G
Emailvatika.rera@vatikagroup.com
Websitehttp://www.vatikagroup.com
Phone (Mobile)9810566938
Phone (Landline)01244177777
Registered AddressVATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
Project AddressSECTOR 82A, VILLAGE SHIKOHPUR
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameHDFC BANK LTD., FIRST INDIA PLACE, M.G. RAOD, GURUGRAM HARYANA-122002.
Account Number575000001817770
IFSC CodeHDFC0000280
MICR Code110240037
Branch Code0280

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)MR. Gautam Bhalla Add:- LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 MR. Anil Bhalla Add:- Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 MR. K.V. George Add:- Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 Mrs. Veena Bhomia Add:- C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area7.50 (Acre)
Proposed FAR115.468
Permissible FAR175
Total Licensed Land326.031 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4289.192
CONSTRUCTION OF ROADS0
PAVEMENTS0
PARKS AND PLAYGROUNDS5934.495
GREEN BELTS0
VEHICLE PARKINGS1445.949
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER18681.739
Total30351.375

Cost Details

Land Cost843.00 Lakhs
Other Cost6675.00 Lakhs
Estimated Project Cost19018.00 Lakhs
Estimated Infrastructure Cost482.48 Lakhs
Estimated Apartment Construction Cost11017.52 Lakhs

Documents

BASEMENT AREA

Uploaded on: 20-02-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 20-02-2020

ENVIRONMENT CLEARANCE

Uploaded on: 20-02-2020

SITE PLAN 1

Uploaded on: 20-02-2020

A TOWER SECTION 2

Uploaded on: 20-02-2020

AIRPORT HEIGHT CLEARANCE NOC

Uploaded on: 20-02-2020

SITE PLAN 2

Uploaded on: 20-02-2020

E TOWER ALL FLOOR AREA

Uploaded on: 20-02-2020

A TOWER ELEVATION 3

Uploaded on: 20-02-2020

BUILDING PLAN BR III

Uploaded on: 20-02-2020

SCHEMETIC DIAGRAM BLOCK ALL

Uploaded on: 20-02-2020

A TOWER 26 AND 27 FLOOR PLAN AREA CALCULATION

Uploaded on: 20-02-2020

H TOWER GF 6TH FLOOR ALL FLOOR AREA TERRACE

Uploaded on: 20-02-2020

REGISTRATION CERTIFICATE SOVEREIGN NEXT (PHASE-I)

Uploaded on: 20-02-2020

FOREST NOC

Uploaded on: 20-02-2020

TOILET DETAIL ALL BLOCK

Uploaded on: 20-02-2020

A TOWER SECTION 1

Uploaded on: 20-02-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-02-2020

G TOWER GF 6TH FLOOR ALL AREA TERRACE

Uploaded on: 20-02-2020

SERVICE PLANS

Uploaded on: 20-02-2020

E TOWER SECTION 1 2

Uploaded on: 20-02-2020

TOILET DETAIL COMMUNITY BUILDING

Uploaded on: 20-02-2020

F TOWER GF 6TH FLOOR ALL AREA TERRACE

Uploaded on: 20-02-2020

A TOWER ELEVATION 2

Uploaded on: 20-02-2020

D TOWER GROUND TO 7TH ALL AREA TERRACE PLAN

Uploaded on: 20-02-2020

COMMUNITY CENTER TOWER GROUND LOWER GROUND AREA ELEVATION SECTION AREA

Uploaded on: 20-02-2020

LICENSE NO 113 OF 2008 71 OF 2010 62 OF 2011

Uploaded on: 20-02-2020

A TOWER GROUND TO 25TH FLOOR

Uploaded on: 20-02-2020

SITE PLAN

Uploaded on: 20-02-2020

DETAILS OF AUTHORISED SIGNATORY

Uploaded on: 20-02-2020

G TOWER ELEVATION SECTION

Uploaded on: 20-02-2020

SCHEMETIC DIAGRAM BLOCK A

Uploaded on: 20-02-2020

EWS TOWER GF 3RD ELEVATION SECTION ALL FLOOR AREA

Uploaded on: 20-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-02-2020

BASEMENT 1

Uploaded on: 20-02-2020

E TOWER ELEVATION 3 4

Uploaded on: 20-02-2020

LC-IV

Uploaded on: 20-02-2020

H TOWER ELEVATION SECTION ALL

Uploaded on: 20-02-2020

FIRE FIGHTING SCHEME

Uploaded on: 20-02-2020

BASEMENT 2

Uploaded on: 20-02-2020

IDW DESIGN AND COST ESTIMATES

Uploaded on: 20-02-2020

D TOWER ELEVATION SECTION

Uploaded on: 20-02-2020

E TOWER GROUND TO 12TH FLOOR TERRACE

Uploaded on: 20-02-2020

SITE PLAN 3

Uploaded on: 20-02-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 21-12-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 21-12-2019

DETAIL OF UNITS AND CONSTRACTION STATUS

Uploaded on: 27-01-2020

RESOLUTION FOR AUTHORISED SIGNATORY

Uploaded on: 27-01-2020

DEVELOPMENT WORK PLAN

Uploaded on: 27-01-2020

COLLABORATION AGREEMENTS

Uploaded on: 27-01-2020

COLLECTION STATEMENT

Uploaded on: 27-01-2020

REGISTRATION CERTIFICATE

Uploaded on: 27-01-2020

SECTORIAL MAP

Uploaded on: 27-01-2020

PROJECT DESCRIPTION AND COST

Uploaded on: 27-01-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 27-01-2020

LIST OF DIRECTORS

Uploaded on: 27-01-2020

AKS SHEJRA WITH LAND DETAILS

Uploaded on: 27-01-2020

ZONING PLAN

Uploaded on: 27-01-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 27-01-2020

PROJECT REPORT

Uploaded on: 27-01-2020

SHAREHOLDERS

Uploaded on: 27-01-2020

CA CERTIFICATE

Uploaded on: 27-01-2020

LOCATION PLAN

Uploaded on: 27-01-2020

ARCHITECT AND ENGINEER CERTIFICATE

Uploaded on: 27-01-2020

CA CERTIFICATE -NON DEFAULT

Uploaded on: 27-01-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 27-01-2020

APPROVAL OF SERVICE ESTIMATE

Uploaded on: 27-01-2020

TIME PERIOD COMMITED TO ALLOTTEE

Uploaded on: 27-01-2020

CONVEYANCE DEED RESIDENTIAL FINAL

Uploaded on: 27-01-2020

REP I (OLD)

Uploaded on: 27-01-2020

PAN CARD

Uploaded on: 27-01-2020

MOA AND AOA

Uploaded on: 27-01-2020

BALANCE SHEET

Uploaded on: 27-01-2020

DETAIL OF PARKING

Uploaded on: 27-01-2020

REVENUE RECORDS SALE DEED ETC

Uploaded on: 27-01-2020

LICENSES

Uploaded on: 27-01-2020

ANNEXURE-3.3

Uploaded on: 27-01-2020

LIST OF ARCHITECT ENGINEER ETC

Uploaded on: 27-01-2020

CASH FLOW STATEMENT

Uploaded on: 27-01-2020

ENCUMBRANCES

Uploaded on: 27-01-2020

SANCTION LETTER AND HOME LOAN TIE UPS

Uploaded on: 27-01-2020

BOOKING APPLICATION FORM RESIDENTIAL FINAL

Uploaded on: 27-01-2020

ALLOTTMENT LETTER RESIDENTIAL

Uploaded on: 27-01-2020

HRERA AFS RESIDENTIAL APARTMENT FINAL

Uploaded on: 27-01-2020

ADVERTISEMENT

Uploaded on: 27-01-2020

A TOWER ELEVATION

Uploaded on: 20-02-2020

ZONING PLAN

Uploaded on: 20-02-2020

SITE PLAN 4

Uploaded on: 20-02-2020

TOWER C GROUND TO 7TH ALL FLOOR AREA

Uploaded on: 20-02-2020

LOI

Uploaded on: 20-02-2020

E TOWER ELEVATION 1 2

Uploaded on: 20-02-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-02-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 20-02-2020

C TOWER ELEVATION SECTION

Uploaded on: 20-02-2020

F TOWER ELEVATION SECTION

Uploaded on: 20-02-2020

Statutory Approvals

LAY OUT PLANDate: 22-12-2014Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 19-04-2012Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 22-12-2014Status: ALREADY BEEN OBTAINED
SITE PLANDate: 22-12-2014Status: ALREADY BEEN OBTAINED
FLOOR PLANDate: 22-12-2014Status: ALREADY BEEN OBTAINED
APARTMENT PLANSDate: 22-12-2014Status: ALREADY BEEN OBTAINED
ELEVATION SECTIONDate: 22-12-2014Status: ALREADY BEEN OBTAINED
SERVICE ESTIMATEDate: 09-12-2012Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: HUDA/HSVPApproval Status: Pending
WATER SUPPLYProvider: HUDA/HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA/HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HUDA/HSVPApproval Status: Pending

Project Team

Authorized Representative

MR VIRENDER DHAR
Name
MR VIRENDER DHAR
PAN
XXXX232D
Email
vatika.rera@vatikagroup.com
Mobile
9810566938
Landline
01244177777
Address
Flat No. M-113SF Blossom-2 Artemis Hospital Sector 51 Gurgaon-122003 Haryana India

Managing Director/CEO

MR GAUTAM BHALLA
Name
MR GAUTAM BHALLA
PAN
XXXX807G
Email
vatika.rera@vatikagroup.com
Mobile
9958999160
Landline
01244177777
Address
Farm No 4 Hyde Park Sultanpur Farm Mehrauli Delhi-110030 India.

Directors

MR ANIL BHALLA
Name
MR ANIL BHALLA
PAN
XXXX416N
Email
vatika.rera@vatikagroup.com
Mobile
9871196506
Landline
01244177777
Address
Farm No- 4 Hyde Park Prakriti Marg Sultanpur Farms Mehrauli Delhi- 110030 India.
MR VIJENDER KUMAR
Name
MR VIJENDER KUMAR
PAN
XXXX305H
Email
vatika.rera@vatikagroup.com
Mobile
9871196504
Landline
01244177777
Address
House No. 51 Village-Naharpur Kasan Galleria Gurugram-122009
MR BRIJ KISHORE SINGH
Name
MR BRIJ KISHORE SINGH
PAN
XXXX890G
Email
vatika.rera@vatikagroup.com
Mobile
9928017864
Landline
01244177777
Address
Baluda Road Sohna Gurgaon Haryana-122001 India.

Contact Details

Project ContactEmail: vatika.rera@vatikagroup.comMobile: 8800772626Landline: 01244177777
Project Contact PersonName: ARUP KUMAR DASEmail: vatika.rera@vatikagroup.comMobile: 8800772626Landline: 0000000000

Land Details

Land Area7.50 (Acre)
Proposed FAR115.468
Permissible FAR175
Total Licensed Land326.031 (Acre)

Land Usage

Land Cost843.00 Lakhs
Other Cost6675.00 Lakhs
Estimated Project Cost19018.00 Lakhs
Estimated Infrastructure Cost482.48 Lakhs
Estimated Apartment Construction Cost11017.52 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Street lighting0
Roads & Pavements73.64
Water Supply System11.84
Storm Water Drainage24.11
Parks and Playgrounds9.21
Rain Water Harvesting13.15
Electrical Sub station0
Electricity Supply System24.55
Security and fire fighting3.07
Clubhouse/community centres0
Sewerage treatment & garbage disposal19.73

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electrical Sub station--00
Electricity Supply System--2.52.8
Other--00
Parks and Playgrounds--0.91.36
Rain Water Harvesting--0.60.63
Roads & Pavements--55
STP--00
Security and fire fighting--01.21
Sewerage treatment & garbage disposal--22
Shopping area--00
Storm Water Drainage--22
Street lighting--00
Water Supply System--22
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station0000
Electricity Supply System3.56.2367
Other0000
Parks and Playgrounds1.120.851.84.92
Rain Water Harvesting0.80.60.60.6
Roads & Pavements77.6289.9
STP000-
Security and fire fighting0.440.211.27
Sewerage treatment & garbage disposal0334.07
Shopping area0000
Storm Water Drainage3.143.53.63.54
Street lighting0000
Water Supply System2334.07
2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station002.932.2
Electricity Supply System4.97181.150.1
Other0000
Parks and Playgrounds0.861.490.1
Rain Water Harvesting0.580.590.830.1
Roads & Pavements2.5513.292.590.1
STP----
Security and fire fighting0.431.20.330.1
Sewerage treatment & garbage disposal1.35.650.170.1
Shopping area0000
Storm Water Drainage1.453.810.60.1
Street lighting0002
Water Supply System2.4511.570.990.1
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station2.22.391.851.85
Electricity Supply System0.10.10.10.1
Other0000
Parks and Playgrounds0.10.10.10.1
Rain Water Harvesting0.10.010.050.05
Roads & Pavements0.10.10.10.1
STP----
Security and fire fighting0.10.10.10.1
Sewerage treatment & garbage disposal0.10.10.10.1
Shopping area0000
Storm Water Drainage0.10.10.10.1
Street lighting21.892.392.39
Water Supply System0.10.10.10.1
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub station2.362.362.364.33
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain Water Harvesting0000
Roads & Pavements0000
STP----
Security and fire fighting0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street lighting2.632.632.633.66
Water Supply System0000
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electrical Sub station7.327.248.81-
Electricity Supply System000-
Other000-
Parks and Playgrounds000-
Rain Water Harvesting000-
Roads & Pavements000-
STP----
Security and fire fighting000-
Sewerage treatment & garbage disposal000-
Shopping area000-
Storm Water Drainage000-
Street lighting2.672.751.26-
Water Supply System000-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEREFER SECTION BELOW
WALL FINISHING DETAILSREFER SECTION BELOW
KITCHEN DETAILSREFER SECTION BELOW
BATHROOM FITTINGSREFER SECTION BELOW
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESREFER POINT 14 BELOW.
GLASS WORKREFER POINT 13 BELOW.
ELECTRIC FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, DISTRIBUTION BOXES AND CIRCUIT BREAKERS FROM STANDARD MAKES AND BRANDS. ADEQUATE PROVISION FOR LIGHT POINTS, FAN POINTS, RECEPTACLES AND POWER POINTS IN ALL ROOMS
CONDUCTING AND WIRING DETAILSIS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS.
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGEUNDERGROUND & OVERHEAD TANKS
LIFT DETAILSSPACIOUS ELEVATORS WITH PLEASING INTERIORS.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSPOWDER COATED ALUMINUM FRAME OR UPVC FRAME WINDOWS WITH CLEAR GLASS
DOORSNA
MAIN DOORSPOLISHED HARDWOOD FRAME WITH POLISHED VENEERED DOORS.
INTERNAL DOORSPOLISHED / PAINTED HARDWOOD FRAME WITH MOLDED SKIN SHUTTERS.
AIR CONDITIONINGCENTRALIZED AIR-CONDITIONING THROUGH VRV/VRF SYSTEMS IN ALL BEDROOMS AND LIVING ROOMS.
ELECTRICAL FITTINGSREFER POINT 8 ABOVE.
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS.
INTERNAL FINISHINGREFER SECTION BELOW

Unit-wise Specifications

TOILET
FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES.
WALLSGLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL (APPROXIMATELY 2100MM). ACRYLIC EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL.
CEILINGFALSE CEILING
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF STANDARD MAKES AND BRANDS.
FIXTURESBASIN MIXER, SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF STANDARD MAKES AND BRANDS. GLASS PARTITION IN ALL TOILETS.
KITCHEN
FLOORMATT FINISHED CERAMIC TILES
WALLS2’ HIGH CERAMIC TILES DADO ABOVE COUNTER. ACRYLIC EMULSION ON PLASTER IN REMAINING AREAS.
CEILINGOBD ON PLASTER
COUNTERSPOLISHED INDIAN GRANITE OR MARBLE
FIXTURESSTAINLESS STEEL SINK AND MIXER OF STANDARD MAKES AND BRANDS.
KITCHEN APPLIANCESCHIMNEY AND HOB
SIT-OUTS
FLOORMATT FINISHED / ANTI SKID CERAMIC TILES
WALLS & CEILINGEXTERIOR GRADE PAINT ON PLASTER.
RAILINGSMS RAILING
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION ON POP OR EQUIVALENT
CEILINGOBD ON PLASTER
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES
WALLSGLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL (APPROXIMATELY 2100MM). ACRYLIC EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
CEILINGFALSE CEILING
COUNTERSGRANITE COUNTER
SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF STANDARD MAKES AND BRANDS.
FITTING/FIXTURESBASIN MIXER, SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF STANDARD MAKES AND BRANDS. GLASS PARTITION IN ALL TOILETS.
MASTER BEDROOM/DRESSROOM
FLOORHARDWOOD FLOORING IN MASTER BEDROOM
WALLSACRYLIC EMULSION ON POP OR EQUIVALENT
CEILINGOBD ON PLASTER
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORPOLISHED IMPORTED MARBLE
WALLSACRYLIC EMULSION ON POP OR EQUIVALENT
CEILINGOBD ON PLASTER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORMATT FINISHED CERAMIC TILES
WALLS & CEILINGPAINT ON PLASTER
TOILETFLOOR - MATT FINISHED CERAMIC TILES. WALL FINISHES - DADO OF GLAZED / MATT FINISHED CERAMIC WALL TILES. (PAINT ON PLASTERED SURFACES ABOVE DADO LEVEL FOR REMAINING AREAS) SANITARY WARE - WASH BASIN AND INDIAN WATER CLOSET (IWC/ EWC/ORISSA PAN) OF STANDARD MAKES. C.P. FITTINGS AND ACCESSORIES - BIB COCK, PILLAR COCK, ABLUTION TAP ALONG WITH NECESSARY ANGLE VALVES ETC. OF STANDARD MAKES AND BRANDS.
BALCONYFLOORING - MATT FINISHED CERAMIC TILES WALL FINISHES - PAINT ON PLASTER

Fee Details

Payment 1
amount:346000.00
cheque no:56946
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK LIMITED