Launch Date
Completion Date
RERA ID
28.658132
77.515490
As per approved layout
Provision as per approved layout
Provision as per approved layout .
Provision as per approved layout and infrastructure development detail .
Portable water being provided to each floor terrace tank from centralised OHT .
Separate soil drainage system, adopted and discharged into the external sewerage network , which further being treated at centralised STP.
Separate Drain system, adopted and discharged into the external sewerage network through GT, which further being treated at centralized STP.
Provision as per approved layout and local regulation
As per authority guidelines .
As per UPPCL guidelines
Provision as per approved layout and local regulation .
Centralised STP proposed at sector level,and treated water being produced from STP will be used for horticulture .
STEP 01-Collection and Storage of waste at Source STEP 02- Segregation of waste at Source . STEP 03- Primary Collection and Storage in Interim Spaces STEP 04 Transportation of waste STEP 05 Processing of waste STEP 06 Disposal.
Rain water harvesting pits have been provided in the landscape area ta different location to meet the authority guidelines.
As per EIA provisions
NA
Provision as per approved layout and local regulation
NA
N/A
Showing 2 blocks with 12 units
Total Carpet Area
37885.14 m²
407791.86 ft²
Total Units
492
2 different types
Blocks & Floors
2
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
60578.00 m²
652055.53 ft²