Total Units
492
2 unit types
Carpet Area
4,07,792 ft²
37,885.14 m² · carpet only, excludes balcony
Blocks & Floors
2
6 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 829 ft² (77.00 m²)Balconies 8Parking per unit 0.006 of 12 rows list no units (6 floors are empty), so they add nothing to these totals
All blocks
Showing 12 of 12 rows · 9 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal | Verandahs | Verandah Areatotal |
|---|---|---|---|---|---|---|---|---|
| 128 | GF | OTHER | 147 | 806 ft²74.91 m² | — | — | 1 | 60 ft²5.61 m² |
| 128 | 1 | OTHER | 147 | 804 ft²74.72 m² | 2 | 117 ft²10.90 m² | — | — |
| 128 | 2 | OTHER | 147 | 804 ft²74.72 m² | 2 | 117 ft²10.90 m² | — | — |
| 128 | BSMNT | OTHER | — | — | — | — | — | — |
| 128 | BSMNT2 | OTHER | — | — | — | — | — | — |
| 128 | BSMNT3 | OTHER | — | — | — | — | — | — |
| 162 | GF | 3 BHK | 17 | 1,060 ft²98.45 m² | — | — | 2 | 135 ft²12.50 m² |
| 162 | 1 | 3 BHK | 17 | 1,023 ft²95.06 m² | 2 | 135 ft²12.50 m² | — | — |
| 162 | 2 | 3 BHK | 17 | 1,023 ft²95.06 m² | 2 | 135 ft²12.50 m² | — | — |
| 162 | BSMNT | 3 BHK | — | — | — | — | — | — |
| 162 | BSMNT2 | 3 BHK | — | — | — | — | — | — |
| 162 | BSMNT3 | 3 BHK | — | — | — | — | — | — |
Total Plot Area
14.97 acres
60,578.00 m² · plot area
As per approved layout
Provision as per approved layout
Provision as per approved layout .
Provision as per approved layout and infrastructure development detail .
Portable water being provided to each floor terrace tank from centralised OHT .
Separate soil drainage system, adopted and discharged into the external sewerage network , which further being treated at centralised STP.
Separate Drain system, adopted and discharged into the external sewerage network through GT, which further being treated at centralized STP.
Provision as per approved layout and local regulation
As per authority guidelines .
As per UPPCL guidelines
Provision as per approved layout and local regulation .
Centralised STP proposed at sector level,and treated water being produced from STP will be used for horticulture .
STEP 01-Collection and Storage of waste at Source STEP 02- Segregation of waste at Source . STEP 03- Primary Collection and Storage in Interim Spaces STEP 04 Transportation of waste STEP 05 Processing of waste STEP 06 Disposal.
Rain water harvesting pits have been provided in the landscape area ta different location to meet the authority guidelines.
As per EIA provisions
NA
Provision as per approved layout and local regulation
NA
N/A
SHIPL-Royal Castle-Floors is located in Ghaziabad.
Yes. SHIPL-Royal Castle-Floors is registered under UPRERAPRJ282359 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for SHIPL-Royal Castle-Floors is 2 May 2022.
SHIPL-Royal Castle-Floors is developed by SUNCITY HI-TECH INFRASTRUCTURES PVT. LTD..
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.