ONGOINGActive

SHANTI VIHAR AWHO

GURUGRAM, GURGAON
30-11-2019
Launch Date
ONGOING
Type
2020-12-31
Completion Date

Overview

Launch Date

30-11-2019

Completion Date

2020-12-31

RERA ID

RERA-GRG-395-2019

Basic Details

Project NameSHANTI VIHAR AWHO
Project IDRERA-GRG-395-2019
Project TypeONGOING
Applicant TypeRegistered Society or Trust or Authority
Submission Date30-11-2019 02:54:07 AM
Builder NameNot specified
CINNot specified
PANNot specified
EmailNot specified
WebsiteNot specified
Phone (Mobile)Not specified
Phone (Landline)Not specified
Registered AddressNot specified
Project AddressWAZIRPUR SECTOR95
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameSYNDICATE BANK, KASHMIR HOUSE, RAJAJI MARG, NEW DELHI
Account Number91222160000119
IFSC CodeSYNB0009122
MICR Code110025170
Branch Code9122

Account Related Information

Annex copy of the balance sheet of last 3 yearsNo
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mrs. Vineeta Sinha, DIRECTOR FINANCE, AWHO
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)NA

Development Details

Land Area24.53 (Acre)
Proposed FAR174.15
Permissible FAR175
Total Licensed Land22.934 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS12628.77
CONSTRUCTION OF ROADS16162
PAVEMENTS4671.84
PARKS AND PLAYGROUNDS5474.576
GREEN BELTS14894.236
VEHICLE PARKINGS11658.50
ELECTRICITY SUB-STATION2500.00
CLUB HOUSE1214.189
SEWAGE AND SOLID WASTE TREATMENT FACILITY992.688
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
UTILITY48.208
SCHOOL AND SHOPPING COMPLEX29024.223
Total99269.23

Cost Details

Land Cost2943491650.00 Lakhs
Other Cost888822000.00 Lakhs
Estimated Project Cost8247313650.00 Lakhs
Estimated Infrastructure Cost1366500000.00 Lakhs
Estimated Apartment Construction Cost3048500000.00 Lakhs

Documents

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-11-2019

DEMARCATION PLAN

Uploaded on: 30-11-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-11-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 30-11-2019

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-11-2019

ZONING PLAN

Uploaded on: 30-11-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-11-2019

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 30-11-2019

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-11-2019

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 30-11-2019

Statutory Approvals

OCCUPATION CERTIFICATE TO DIRECTOR TOWN AND COUNTRY PLANNING CHANDIGARHDate: 07-01-2020Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: No
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PUMP ROOMAS PER PROJECT REPORT
SHOPPING COMPLEXAS PER PROJECT REPORT
SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: PWDApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Contact Details

Project ContactEmail: pd_gur95@awhosena.inMobile: 9717770341Landline: 01244372052
Project Contact PersonName: COL KARUNESH KUMAREmail: AWHO95@GMAIL.COMMobile: 9717770341Landline: 01244372052

Land Details

Land Area24.53 (Acre)
Proposed FAR174.15
Permissible FAR175
Total Licensed Land22.934 (Acre)

Land Usage

Land Cost2943491650.00 Lakhs
Other Cost888822000.00 Lakhs
Estimated Project Cost8247313650.00 Lakhs
Estimated Infrastructure Cost1366500000.00 Lakhs
Estimated Apartment Construction Cost3048500000.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Pump Room457
Sub Station950
Shopping area43.81
Shopping Complex130
Roads & Pavements183.61
Water Supply System155.61
Storm Water Drainage49
Parks and Playgrounds898
Electricity Supply System1508.2
Clubhouse/community centres351.96
Sewerage treatment & garbage disposal231.21

Quarterly Infrastructure Expenditure

2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electricity Supply System00--
Other00--
Parks and Playgrounds00--
Roads & Pavements00--
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Water Supply System00--
2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres15---
Electricity Supply System47---
Other0---
Parks and Playgrounds7---
Roads & Pavements170---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Water Supply System30---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES, WOODEN FOORING IN MASTER BEDROOM
WALL FINISHING DETAILSACRYLIC EULSION PAINT
KITCHEN DETAILSTILES AND GRANITE SLAB
BATHROOM FITTINGSJAQUAR
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESALUMINIUM AND FLUSH DOOR SHUTTERS
GLASS WORKWINDOWS AND VENTILATORS
ELECTRIC FITTINGSNORTHWEST AND LEGRAND SWITCHES
CONDUCTING AND WIRING DETAILSHAVELLS FRLS WIRES
CUPBOARD DETAILSNA
WATER STORAGEOHT
LIFT DETAILSKONE
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSMODIGUARD 5 MM THICK
DOORSDURO FLUSH DOORS
MAIN DOORSDURO FLUSH DOORS
INTERNAL DOORSDURO FLUSH DOORS
AIR CONDITIONINGNA
ELECTRICAL FITTINGSNA
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE ASIAN PAINT
INTERNAL FINISHINGASIAN ACRYLIC EMULSION

Unit-wise Specifications

TOILET
FLOORANTISKID TILES
WALLSWALL TILES
CEILINGFALSE CEILING CALCIUM SILICATE
COUNTERSGRANITE
SANITARY WARE/CP FITTINGSJAQUAR AND HINDWARE
FIXTURESWC AND WHB
KITCHEN
FLOORANTISKID TILES
WALLSWALL TILES
CEILINGASIAN OIL BOUND DISTEMPER
COUNTERSGRANITE SLAB
FIXTURESJAQUAR
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSASIAN ACRYLIC EMULSION
CEILINGASIAN OIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORANTISKID TILES
WALLSWALL TILES
CEILINGFALSE CEILING CALCIUM SILICATE
COUNTERSGRANITE
SANITARY WARE/CP FITTINGSJAQUAR AND HINDWARE
FITTING/FIXTURESWC AND WHB
MASTER BEDROOM/DRESSROOM
FLOORWOODEN FLOORING
WALLSASIAN ACRYLIC EMULSION
CEILINGASIAN OIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSASIAN ACRYLIC EMULSION
CEILINGASIAN OIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGASIAN OIL BOUND DISTEMPER
TOILETNA
BALCONYRCC WALL WITH MS RAILING

Fee Details

Payment 1
amount:5526161.00
cheque no:574837
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:SYNDICATE BANK