Launch Date
Completion Date
RERA ID
28 38 55
77 20 18
FRONT-185.374 M, REAR-171.721 M, RHS-98.111M, LHS-131.102 M
RCC COLUMN AND BEAM STR. WITH BRICK WORK & MS RAILING
CEMENT CONCRETE TRIMIX WITH CEMENT CONCRETE PAVERS
CEMENT CONCRETE PAVERS
Drinking water facility is provided by relevant concerning department.
Well – Laid interconnected sewer lines are available which are further connected to the municipal s.
Rain water harvesting system is provided in the entire campus. Units are designed considering the peak surface water.
Internal landscape courts and green are provided as per requirement.
Tree Plantation is provided as per Landscape Layout along with various type of trees, shrubs and hedges.
Electrical Supply – System is provided according to requirement based on the calculations.
Club Building is provided
internal sewer lines are connected to the external municipal sewer lines.
Garbage chutes are provided in all towers separately and further thrown to the nearby garbage dumping yard.
Rain Water Harvesting Systems are provided
Provision of V.F.D. ( Variable Frequency Drive) in pump room for pumping the domestic and flushing water to minimize the energy requirement.
Provision of all Fire fighting system and protection as per NBC and fire department which includes Sprinkles system, Wet Riser system, External Hydrant system water curtain system in basement and portable fire extinguisher , PA system.
NA
fire tender road and fire escape staircase are provided.
NA
Showing 3 blocks with 171 units
Total Carpet Area
25631.06 m²
275890.17 ft²
Total Units
188
4 different types
Blocks & Floors
3
17 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20000.00 m²
215278.00 ft²