Launch Date
Completion Date
RERA ID
28.652507912185616
77.34529919140459
FRONT-185.374M, REAR - 171.721M, RHS-98.111M, LHS-131.102M
RCC COLUMN AND BEAM STR. WITH BRICK WORK & MS RAILING
CEMENT CONCRETE TRIMIX WITH CEMENT CONCRETE PAVERS
CEMENT CONCRETE PAVERS
Domestic underground &overhead water tanks are provided which are to filled by the supply line provided by relevant concerning department. Drinking water facility is provided by relevant concerning department.
Well – Laid interconnected sewer lines are available which are further connected to the municipal sewer.
Rain water harvesting system is provided in the entire campus. Units are designed considering the peak surface water
internal landscape courts and green are provided as per requirement
Tree Plantation is provided as per Landscape Layout along with various type of trees, shrubs and hedges
Electrical Supply – System is provided according to requirement based on the calculations
Club Building is provided.
internal sewer lines are connected to the external municipal sewer lines.
Garbage chutes are provided in all towers separately and further thrown to the nearby garbage dumping yard
Rain Water Harvesting Systems are provided.
Provision of V.F.D. ( Variable Frequency Drive) in pump room for pumping the domestic and flushing water to minimize the energy requirement
Provision of all Fire fighting system and protection as per NBC and fire department which includes Sprinkles system, Wet Riser system, External Hydrant system water curtain system in basement and portable fire extinguisher , PA system
NA
fire tender road and fire escape staircase are provided.
NA
Showing 2 blocks with 144 units
Total Carpet Area
18228.24 m²
196206.95 ft²
Total Units
144
1 different types
Blocks & Floors
2
18 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20000.00 m²
215278.00 ft²