NEWActive

NAKSHATRA BY NOWARA

GURUGRAM, FARRUKHNAGAR
22-10-2025
Launch Date
NEW
Type
2030-06-30
Completion Date

Overview

Launch Date

22-10-2025

Completion Date

2030-06-30

RERA ID

RERA-GRG-2015-2025

Basic Details

Project NameNAKSHATRA BY NOWARA
Project IDRERA-GRG-2015-2025
Project TypeNEW
Applicant TypeFirm
Submission Date22-10-2025 03:44:25 PM
Builder NameNOWARA REALTY LLP
CINNot specified
PANAAWFN9046P
Emailfinance@nowararealty.com
WebsiteNot specified
Phone (Mobile)7303649505
Phone (Landline)012412341234
Registered AddressUNIT NO 1615, TOWER 1, DLF CORPORATE GREENS, SECTOR 74, NARSINGHPUR, GURGAON-122004
Project AddressSECTOR 3, FARUKHNAGAR
DistrictGURUGRAM
TehsilFARRUKHNAGAR

Bank Details

Bank NameAU SMALL FINANCE BANK LIMITED, GROUND FLOOR, 5,6,7 NINEX CITY MART, SECTOR 49, SOHNA ROAD, GURGAON 122101
Account Number2502240377828070
IFSC CodeAUBL0002403
MICR Code110765011
Branch Code2403

Account Related Information

Annex copy of the balance sheet of last 3 yearsNo
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Piyush Jain
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)NA

Development Details

Land Area8.84375 (Acre)
Proposed FAR240
Permissible FAR240
Total Licensed Land8.84375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5595.51
CONSTRUCTION OF ROADS11535.14
PAVEMENTS0
PARKS AND PLAYGROUNDS5531.19
GREEN BELTS860.47
VEHICLE PARKINGS9148.00
ELECTRICITY SUB-STATION315.15
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
ANGANWADI AND COMMUNITY373.01
COMMERCIAL2345.31
GUARDROOM HT ROOM LT ROOM85.55
Total35789.33

Cost Details

Land Cost9964.50 Lakhs
Other Cost6847.99 Lakhs
Estimated Project Cost33436.69 Lakhs
Estimated Infrastructure Cost1216.56 Lakhs
Estimated Apartment Construction Cost15407.64 Lakhs

Documents

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 22-10-2025

TOWER-1 TO7 SECTION

Uploaded on: 22-10-2025

PUBLIC HEALTH NOC

Uploaded on: 22-10-2025

TOWER-7 TYPICAL FLOOR PLANS

Uploaded on: 22-10-2025

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 22-10-2025

TOWER-1 TO 4 GROUND FLOOR PLAN

Uploaded on: 22-10-2025

FIRST FLOOR PLAN TOWER-4

Uploaded on: 22-10-2025

TOWER-8 GROUND AND FIRST FLOOR PLAN

Uploaded on: 22-10-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 22-10-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 22-10-2025

SITE PLAN GREEN AND PARKING

Uploaded on: 22-10-2025

FIRE NOC HT LINE

Uploaded on: 22-10-2025

TOWER-5,6&7 TYPICAL FLOOR PLANS

Uploaded on: 22-10-2025

DRINKING WATER - ASSURANCE

Uploaded on: 22-10-2025

AAI NOC

Uploaded on: 22-10-2025

ARAVALI NOC

Uploaded on: 22-10-2025

FOREST NOC

Uploaded on: 22-10-2025

DEMARCATION PLAN

Uploaded on: 22-10-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 22-10-2025

TOWER-1TO 4 TYPICAL FLOOR AND TERRACE PLAN

Uploaded on: 22-10-2025

TOWER-8 TYPICAL FLOOR PLANS AND TERRACE PLANS

Uploaded on: 22-10-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 22-10-2025

STORM DRAINAGE CONNECTION ASSURANCE

Uploaded on: 22-10-2025

UNIT DEATILS

Uploaded on: 22-10-2025

FIRE NOC

Uploaded on: 22-10-2025

COMMERCIAL -3 FLOOR PLANS

Uploaded on: 22-10-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 22-10-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 22-10-2025

SEWAGE CONNECTION ASSURANCE

Uploaded on: 22-10-2025

TOWER-,&7 GROUND AND FIRST FLOOR PLANS

Uploaded on: 22-10-2025

TITLE SEARCH REPORT

Uploaded on: 22-10-2025

SITE PLAN

Uploaded on: 22-10-2025

TOWER-6 ELEVATION SECTION

Uploaded on: 22-10-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 22-10-2025

AAGANWADI AND COMMUNITY HALL PLANS

Uploaded on: 22-10-2025

ZONING PLAN

Uploaded on: 22-10-2025

NON-ENCUMBERANCE

Uploaded on: 22-10-2025

STP WATER ASSURANCE

Uploaded on: 22-10-2025

COMMERCIAL -1 FLOOR PLANS AND SECTION ELEVATIONS

Uploaded on: 22-10-2025

COMMERCIAL -2 FLOOR PLANS AND SECTION ELEVATIONS

Uploaded on: 22-10-2025

TOWER-1 TO5 &7 ELEVATION

Uploaded on: 22-10-2025

PROJECT REPORT

Uploaded on: 08-01-2026

EC APPLICATION SS

Uploaded on: 08-01-2026

FINANCIAL STATEMENT

Uploaded on: 08-01-2026

CA CERTIFICATE FOR FINANCIAL & INVENTORY DETAILS

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR NOC FROM EXTERNAL AGENCIES

Uploaded on: 08-01-2026

CONVEYANCE DEED

Uploaded on: 08-01-2026

MUTATION

Uploaded on: 08-01-2026

NATURAL CONSERVATION

Uploaded on: 08-01-2026

PERT CHART

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR HIGH TENSION LINES

Uploaded on: 08-01-2026

PAYMENT RECEIPT

Uploaded on: 08-01-2026

BROCHURE

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR SEPERATE BANK ACCOUNT

Uploaded on: 08-01-2026

DEMAND DRAFT

Uploaded on: 08-01-2026

AGREEMENT FOR SALE

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR DEDUCTION EDC

Uploaded on: 08-01-2026

AKS SHIZRA

Uploaded on: 08-01-2026

SUPERIMPOPSED PLAN

Uploaded on: 08-01-2026

BR-III NOWARA

Uploaded on: 08-01-2026

UNDERTAKING FOR TREE CUTTING, NCZ, POWER LINE

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING NO LOAN

Uploaded on: 08-01-2026

CA CERTIFICATE FOR COST INCURRED UP TO THE DATE OF EXTENTION OF REGISTRATION AS PER BOOKS OF AC

Uploaded on: 08-01-2026

LOI

Uploaded on: 08-01-2026

LC-IV- AGREEMENT

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR ROAD ACCESS

Uploaded on: 08-01-2026

CA CERTIFICATE FOR NON-DEFAULT IN PAYMENT OF DEBTS AND LIABILITIES AS ON DATE IN THE GIVEN FORMAT

Uploaded on: 08-01-2026

BOARD RESOLUTION FOR BANK ACCOUNT

Uploaded on: 08-01-2026

FIRE SCHEME STATUS

Uploaded on: 08-01-2026

JAMABANDI

Uploaded on: 08-01-2026

AFFIDAVIT NO LITIGATION

Uploaded on: 08-01-2026

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 08-01-2026

ALLOTMENT LETTER

Uploaded on: 08-01-2026

ELECTRICITY LOAD DHBVN LETTER

Uploaded on: 08-01-2026

COLLAB WITH ADDENDUM

Uploaded on: 08-01-2026

AFFIDAVIT CUM UNDERTAKING FOR PAYMENT TO LANDOWNERS

Uploaded on: 08-01-2026

AFFIDAVIT FOR MINING

Uploaded on: 08-01-2026

Statutory Approvals

NOC - PUBLIC HEALTHDate: 16-09-2025Status: ALREADY BEEN OBTAINED
BUILDING PLANSDate: 14-10-2025Status: ALREADY BEEN OBTAINED
DEMARCATION CUM ZONING PLANDate: 22-05-2025Status: ALREADY BEEN OBTAINED
AIRPORTS AUTHORITY OF INDIA NOCDate: 01-07-2025Status: ALREADY BEEN OBTAINED
ARAVALI NOCDate: 25-07-2025Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 24-09-2024Status: ALREADY BEEN OBTAINED
FRESH WATER SUPPLY ASSURANCEDate: 29-09-2025Status: ALREADY BEEN OBTAINED
SEWARAGE CONNECTION ASSURANCEDate: 16-06-2025Status: ALREADY BEEN OBTAINED
STORM WATER ASSURANCEDate: 16-06-2025Status: ALREADY BEEN OBTAINED
STP TREATED WATER ASSURANCEDate: 16-06-2025Status: ALREADY BEEN OBTAINED
LICENSE 73 OF 2025Date: 22-05-2025Status: ALREADY BEEN OBTAINED
FIRE FIGHTING SCHEMEDate: 16-10-2025Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLSUBMITTED TO HUDA
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA
HORTICULTURESUBMITTED TO HUDA

NOC

ROADSProvider: CONNECTEDApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

PIYUSH JAIN
Name
PIYUSH JAIN
PAN
XXXX066N
Email
p@nowararealty.com
Mobile
7303649505
Landline
01245181321
Address
C-28 FF Greenwood City Sector-45 Gurugram Haryana-122003

Contact Details

Project ContactEmail: finance@nowararealty.comMobile: 7303649505Landline: 01245181321
Project Contact PersonName: RAKESH KUMAREmail: finance@nowararealty.comMobile: 7303649505Landline: 01245181321

Land Details

Land Area8.84375 (Acre)
Proposed FAR240
Permissible FAR240
Total Licensed Land8.84375 (Acre)

Land Usage

Land Cost9964.50 Lakhs
Other Cost6847.99 Lakhs
Estimated Project Cost33436.69 Lakhs
Estimated Infrastructure Cost1216.56 Lakhs
Estimated Apartment Construction Cost15407.64 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-000
Horticulture----
Other-26.9326.9326.93
Parks and Playgrounds-000
Roads & Pavements-434343
Sewerage treatment & garbage disposal-49.0949.0949.09
Shopping area-000
Storm Water Drainage-24.7424.7424.74
Street Lights-3.393.393.39
Water Supply System-153.43153.43153.43
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electricity Supply System00--
Horticulture7.117.11--
Other26.930--
Parks and Playgrounds00--
Roads & Pavements430--
Sewerage treatment & garbage disposal49.090--
Shopping area00--
Storm Water Drainage24.740--
Street Lights3.39---
Water Supply System153.430--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES(CARDILLAC GRANITO/SIGNOVA/AIRONA/EQUIVALENT
WALL FINISHING DETAILSOBD(ASIAN/BERGER/EQUIVALENT)
KITCHEN DETAILSGRANITE/KOTA
BATHROOM FITTINGSCLASSIC/GLOSSERA/HAGAR/EQUIVALENT
WOOD WORK ETCHARD WOOD/MS
DOORS AND WINDOS FRAMESALUMINIUM/UPVC/EQUIVALENT
GLASS WORKSAINT GOBAIN/MODI GUARD
ELECTRIC FITTINGSANCHOR/ROMA/EQUIVALENT MODULAR
CONDUCTING AND WIRING DETAILSPOLYPACK/AKG/ALLWIN/EQUIVALENT ISI
CUPBOARD DETAILSNA
WATER STORAGERCC/PVC
LIFT DETAILSKONE/JOHNSON/OTIS/EQUIVALENT MAKE
EXTERNAL GLAZINGSALUMINIUM/UPVC/EQUIVALENT
WINDOWS/GLAZINGSALUMINIUM /UPVC/EQUIVALENT
DOORSPAINTED HARDWOOD FRAME WITH FLUSH DOOR(BHUTAN TUFF/JYOTI/EQUIVALENT ISI)
MAIN DOORSPAINTED HARDWOOD FRAME WITH FLUSH DOOR(BHUTAN TUFF/JYOTI/EQUIVALENT ISI)
INTERNAL DOORSPAINTED HARDWOOD FRAME WITH FLUSH DOOR(BHUTAN TUFF/JYOTI/EQUIVALENT ISI)
AIR CONDITIONINGNA
ELECTRICAL FITTINGSANCHOR/ROMA/EQUIVALENT MODULAR
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
INTERNAL FINISHINGOBD

Unit-wise Specifications

TOILET
FLOORTILES
WALLSOBD
CEILINGOBD/WHITE WASH
COUNTERSNA
SANITARY WARE/CP FITTINGSCLASSIC/GLOSSERA/HAGAR/EQUIVALENT ISI
FIXTURESCLASSIC/GLOSSERA/HAGAR/EQUIVALENT ISI
KITCHEN
FLOORVITRIFIED TILES/CERAMICS
WALLS2' CERAMICS TILES
CEILINGOBD
COUNTERSMARBLE/GRANITE
FIXTURESISI MARKED
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSENAMEL PAINT
FIXTURESNA
BED ROOMS
FLOORTILES
WALLSOBD
CEILINGOBD/WHITE WASH
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES(ANTI-SKID)
WALLSOBD
CEILINGOBD/WHITE WASH
COUNTERSNA
SANITARY WARE/CP FITTINGSCLASSIC/GLOSSERA/HAGAR/EQUIVALENT ISI
FITTING/FIXTURESCLASSIC/GLOSSERA/HAGAR/EQUIVALENT ISI
MASTER BEDROOM/DRESSROOM
FLOORTILES
WALLSOBD
CEILINGOBD/WHITE WASH
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES
WALLSOBD
CEILINGOBD/WHITE WASH
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGOBD
TOILETCERAMICS TILES
BALCONYCERAMICS TILES

Fee Details

Payment 1
amount:1893000
cheque no:746
draft date:10-10-2025
payable to:HRERA Gurugram
payee bank:AU SMALL FINANCE BANK LIMITED