ONGOINGActive

M3M INTERNATIONAL FINANCIAL CENTER INCLUDING PHASE I & II

GURUGRAM, BADSHAHPUR ST
19-02-2021
Launch Date
ONGOING
Type
2024-12-31
Completion Date

Overview

Launch Date

19-02-2021

Completion Date

2024-12-31

RERA ID

RERA-GRG-809-2021

Basic Details

Project NameM3M INTERNATIONAL FINANCIAL CENTER INCLUDING PHASE I & II
Project IDRERA-GRG-809-2021
Project TypeONGOING
Applicant TypeCompany
Submission Date19-02-2021 02:59:25 PM
Builder NameGENTLE REALTORS PRIVATE LIMITED
CINU45201HR2006PTC044855
PANXXXX367P
Emailgentlerealtors@gmail.com
Websitehttp://gentlerealtors.com
Phone (Mobile)9711348349
Phone (Landline)01244732000
Registered AddressLGF-C-34, SUSHANT SHOPPING ARCADE, SUSHANT LOK,PHASE-1, GURUGRAM 122002, HARYANA
Project AddressSECTOR-66, GURUGRAM
DistrictGURUGRAM
TehsilBADSHAHPUR ST

Bank Details

Bank NameICICI BANK LIMITED , SUNCITY , SECTOR-54, GURUGRAM
Account Number039905005758
IFSC CodeICIC000399
MICR Code110229060
Branch Code000399

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Ms. Amarjot Kaur Sahni, 3/66 Subhash Nagar, West Delhi-110027, Mr. Vidya Sagar, 3G-208, Fariabad, NIT Faridabad, Haryana-121001, Mr. Pratap Singh, 10A Pocket-2,Mayur Vihar, East Delhi-110096,
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Yes

Development Details

Land Area4.843 (Acre)
Proposed FAR3.62
Permissible FAR3.62
Total Licensed Land4.843 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS1.04
PAVEMENTS0
PARKS AND PLAYGROUNDS1.421
GREEN BELTS0
VEHICLE PARKINGS0.108
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.493
AREA1.772
RAIN0.009
Total4.843

Cost Details

Land Cost12616.7 Lakhs
Other Cost8575.42 Lakhs
Estimated Project Cost53224.3 Lakhs
Estimated Infrastructure Cost3436.76 Lakhs
Estimated Apartment Construction Cost28595.40 Lakhs

Documents

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 03-02-2021

LC- IV

Uploaded on: 03-02-2021

LOI

Uploaded on: 03-02-2021

ENVIRONMENT CLEARANCE

Uploaded on: 03-02-2021

ZONING PLAN

Uploaded on: 03-02-2021

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 03-02-2021

LICENCE RENEWAL

Uploaded on: 03-02-2021

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 18-02-2021

BOARD RESOLUTIONS

Uploaded on: 18-02-2021

NEC

Uploaded on: 18-02-2021

SERVICE PLAN APPLICATION

Uploaded on: 18-02-2021

DEMARCATION PLAN

Uploaded on: 18-02-2021

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 18-02-2021

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 18-02-2021

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 18-02-2021

165 OF 2008- LC-IV

Uploaded on: 30-03-2021

REVISED ZONING UNDER TOD_FINAL

Uploaded on: 30-03-2021

BR III -REVISED GENTLE-22.03.2021

Uploaded on: 30-03-2021

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-03-2021

GENTLE_DEMARCATION SUPERIMPOSED ON SITE PLAN-MODEL

Uploaded on: 30-03-2021

SITE PLAN2 18-02-2021-MODEL_FOR PARKING

Uploaded on: 30-03-2021

12TH, 12-A FLOOR & TERRACE PLAN-TOWER-2 (PHASE-II)

Uploaded on: 30-03-2021

23RD SERVICE FLOOR CARPET AREA DIAGRAM WITH DETAIL-TOWER 1

Uploaded on: 30-03-2021

38TH TO 43RD FLOOR CARPET AREA DIAGRAM WITH DETAIL

Uploaded on: 30-03-2021

39TH FLOOR PLAN TOWER-1 (PHASE III)

Uploaded on: 30-03-2021

40TH, 41ST, 41A, 42ND & 42A FLOOR AREA DIAGRAM WITH DETAIL

Uploaded on: 30-03-2021

41A FLOOR PLAN-TOWER 1 (PHASE-III)

Uploaded on: 30-03-2021

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 08-04-2022

SERVICE PLAN ROAD

Uploaded on: 08-04-2022

SERVICE PLAN WATER

Uploaded on: 08-04-2022

SERVICE PLAN SEWER

Uploaded on: 08-04-2022

SERVICE PLAN STORM WATER

Uploaded on: 08-04-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 17-05-2022

GENTLE REVISED FIRE APPROVAL

Uploaded on: 17-05-2022

REP II IFC

Uploaded on: 17-05-2022

TOWER-1 40TH, 41ST & 42ND FLOOR CARPET AREA DIAGRAM WITH DETAIL

Uploaded on: 17-05-2022

TOWER-1 (PHASE II)TYPICAL FLOOR PLAN

Uploaded on: 17-05-2022

TOWER 1 (23RD FLOOR) 26TH, 30TH, 34TH 38TH FLOOR

Uploaded on: 17-05-2022

43RD FLOOR PLAN-TOWER 1 (PHASE-III)

Uploaded on: 17-05-2022

43 FLOOR AREA DIAGRAM WITH DETAIL

Uploaded on: 17-05-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 19-05-2022

Statutory Approvals

LICENCEDate: 08-09-2008Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 31-10-2013Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATESDate: 09-04-2021Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 04-04-2018Status: ALREADY BEEN OBTAINED
ARAVALIDate: 13-05-2014Status: ALREADY BEEN OBTAINED
NOC FOR HEIGHT CLEARANCEDate: 03-11-2017Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 22-03-2021Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO TOWN & COUNTRY PLANNING
SHOPPING AREASUBMITTED TO TOWN & COUNTRY PLANNING
RENEWABLE ENERGY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SCHOOLSUBMITTED TO TOWN & COUNTRY PLANNING
HOSPITAL/DISPENSARYSUBMITTED TO TOWN & COUNTRY PLANNING
ANY OTHERSUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICAL SUB STATIONSUBMITTED TO TOWN & COUNTRY PLANNING
PARKINGSUBMITTED TO TOWN & COUNTRY PLANNING
STPSUBMITTED TO TOWN & COUNTRY PLANNING
UNDERGROUND WATER TANKSUBMITTED TO TOWN & COUNTRY PLANNING
RAIN WATER HAREVSTINGSUBMITTED TO TOWN & COUNTRY PLANNING

NOC

ROADSProvider: HSVP/ GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNLApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MANIK SHARMA
Name
MANIK SHARMA
PAN
XXXX240L
Email
gentlerealtors@gmail.com
Mobile
8929034470
Landline
01244732000
Address
House No. 544 Sector 46 Urban Estate Aman Nagar faridabad 121003 Haryana

Managing Director/CEO

NA
Name
NA
PAN
XXXX367P
Email
gentlerealtors@gmail.com
Mobile
9711348349
Landline
01244732000
Address
NA

Directors

KAPIL DEV
Name
KAPIL DEV
PAN
XXXX401C
Email
gentlerealtors@gmail.com
Mobile
9811486979
Landline
01244732000
Address
House No. 215 Near R.C. Sharma Hospital Jacompura Gurugram-122001 Haryana
VISHNU DUTT
Name
VISHNU DUTT
PAN
XXXX315M
Email
gentlerealtors@gmail.com
Mobile
7669610540
Landline
01244732000
Address
Ganpati Plaza Phool Bhag Bhiwadi Harchandpur Alwar Bhiwadi Ind. Area Alwar Rajasthan-301019

Contact Details

Project ContactEmail: gentlerealtors@gmail.comMobile: 9711348349Landline: 01244732000
Project Contact PersonName: RAJEEV KHANNAEmail: gentlerealtors@gmail.comMobile: 9711348349Landline: 01244732000

Land Details

Land Area4.843 (Acre)
Proposed FAR3.62
Permissible FAR3.62
Total Licensed Land4.843 (Acre)

Land Usage

Land Cost12616.7 Lakhs
Other Cost8575.42 Lakhs
Estimated Project Cost53224.3 Lakhs
Estimated Infrastructure Cost3436.76 Lakhs
Estimated Apartment Construction Cost28595.40 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP45
Other0
Parking127.58
Street Light18.59
Shopping area0
Roads & Pavements243.08
Water Supply System259.72
Storm Water Drainage47.73
Electrical Substation1152.22
Parks and Playgrounds13.35
Rain water harvesting19.45
Under ground water tank28.32
Electricity Supply System37.39
Security and Fire fighting184.7
Clubhouse/community centres0
Sewerage treatment & garbage disposal84.85

Quarterly Infrastructure Expenditure

2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electrical sub station----
Electricity Supply System--00
Other--00
Parking----
Parks and Playgrounds--00
Roads & Pavements--00
Security and Firefighting----
Sewerage treatment & garbage disposal--00
Shopping area--00
Storm Water Drainage--00
Water Supply System--00
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station-177.88177.88177.88
Electricity Supply System0000
Other051.0951.0951.09
Parking-28.8849.582.5
Parks and Playgrounds0000
Roads & Pavements0000
Security and Firefighting024.3626.87.74
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station92.95000
Electricity Supply System0000
Other51.09000
Parking61.8862.17--
Parks and Playgrounds0000
Roads & Pavements0000
Security and Firefighting11.78000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station----
Electricity Supply System0000
Other0000
Parking----
Parks and Playgrounds0000
Roads & Pavements0000
Security and Firefighting----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSERETAIL (TYPICAL FLOOR)- RCC BASE SLAB OFFICE (LOBBY) FINISHED GRND FLOOR LOBBY & RCC BASE SLAB FOR TYPICL FLOOR LOBBIES. OFFICE (UNIT FLOOR FINISH) RCC BASE SLAB
WALL FINISHING DETAILSRAW WALL/ PARTITIONS
KITCHEN DETAILSN.A.
BATHROOM FITTINGSRETAIL- FINISHED COMMON TOILETS WITH MODERN FITTING & FIXTURES OFFICE : PROVISION OF SERVICES WILL BE PROVIDED AND TO BE FINISHED BY ALLOTTEE(S).
WOOD WORK ETCN.A.
DOORS AND WINDOS FRAMESALUMINIUM FRAME
GLASS WORKGLASS THICKNESS VARIES FROM 6 TO 10 MM
ELECTRIC FITTINGSCOMMON AREAS & TOILETS TO BE PROVIDED WITH LED LIGHT FIXTURES.
CONDUCTING AND WIRING DETAILSISI APPROVED CONDUITS & WIRES
CUPBOARD DETAILSN.A.
WATER STORAGERCC TANK
LIFT DETAILSSTANDARD MAKE ELEVATORS
EXTERNAL GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
WINDOWS/GLAZINGSALUMINIUM GLAZING WITH GLASS OF 5-12 MM THICK GLASS
DOORSALUMINIUM / GLASS DOORS
MAIN DOORSALUMINIUM / GLASS DOORS
INTERNAL DOORSMS/ALUMINIUM/WOODEN DOORS
AIR CONDITIONINGCHILLED WATER AC SYSTEM FOR OFFICE & PROVISION FOR WATER COOLED DX SYSTEM UPTO TAP OFF INSIDE SHOP
ELECTRICAL FITTINGSPROVISION OF CABLE UP TO DISTRIBUTION BOARD ISI /BIS APPROVED
CNG PIPE LINEN.A.
PROVISION OF WIFI AND BROADBAND FACILITYN.A.
EXTERNAL FINISHING/COLOUR SCHEMENA
INTERNAL FINISHINGPAINT/GLASS

Unit-wise Specifications

TOILET
FLOORN.A.
WALLSN.A.
CEILINGN.A.
COUNTERSN.A.
SANITARY WARE/CP FITTINGSN.A.
FIXTURESN.A.
KITCHEN
FLOORN.A.
WALLSN.A.
CEILINGN.A.
COUNTERSN.A.
FIXTURESN.A.
KITCHEN APPLIANCESN.A.
SIT-OUTS
FLOORN.A.
WALLS & CEILINGN.A.
RAILINGSN.A.
FIXTURESN.A.
BED ROOMS
FLOORN.A.
WALLSN.A.
CEILINGN.A.
WARDROBESN.A.
MASTER TOILET
FLOORN.A.
WALLSN.A.
CEILINGN.A.
COUNTERSN.A.
SANITARY WARE/CP FITTINGSN.A.
FITTING/FIXTURESN.A.
MASTER BEDROOM/DRESSROOM
FLOORN.A.
WALLSN.A.
CEILINGN.A.
MODULAR WARDROBESN.A.
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORN.A.
WALLSN.A.
CEILINGN.A.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORN.A.
WALLS & CEILINGN.A.
TOILETN.A.
BALCONYN.A.

Fee Details

Payment 1
amount:325800
cheque no:500499
draft date:09-05-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:2580700
cheque no:512339
draft date:19-02-2021
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:356500
cheque no:512340
draft date:19-02-2021
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 4
amount:1218500
cheque no:500501
draft date:09-05-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 5
amount:488800
cheque no:500500
draft date:09-05-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 6
amount:651700
cheque no:5197
draft date:30-01-2018
payable to:HRERA Gurugram
payee bank:AXIS BANK