ONGOINGActive

LIFESTYLE HOMES (BLOCK A)

GURUGRAM, MANESAR
17-01-2020
Launch Date
ONGOING
Type
2019-12-31
Completion Date

Overview

Launch Date

17-01-2020

Completion Date

2019-12-31

RERA ID

RERA-GRG-491-2019

Basic Details

Project NameLIFESTYLE HOMES (BLOCK A)
Project IDRERA-GRG-491-2019
Project TypeONGOING
Applicant TypeCompany
Submission Date17-01-2020 12:31:02 PM
Builder NameVATIKA LIMITED
CINU74899HR1998PLC054821
PANXXXX647G
Emailvatika.rera@vatikagroup.com
Websitehttp://www.vatikagroup.com
Phone (Mobile)9810566938
Phone (Landline)01244177777
Registered AddressVATIKA TRIANGLE, 4TH FLOOR, SUSHANT LOK, PHASE-I, BLOCK-A, M. G. ROAD, GURUGRAM-122 002.
Project AddressSECTOR-83, VILLAGE SIHI
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameHDFC BANK LTD. FIP, MG ROAD, GURUGRAM HARYANA-122001
Account Number57500000181626
IFSC CodeHDFC0000280
MICR Code110240037
Branch Code0280

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1.Mr. Anil Bhalla Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030 2.Mr. Gautam Bhalla LCG05 PHB, The Laburnam, Nathupur (67),Nathupur Gurgaon,Gurgaon, Haryana 122002 3. Mr. K V George Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075 4. Mrs Veena Bhomia C1/577B,Rear Block,1st Floor, Near Euro Kids School,Palam Vihar,Choma (62), Gurgaon, Haryana 122017
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area12.83 (Acre)
Proposed FAR168.331
Permissible FAR175
Total Licensed Land12.83 (Acre)

Land Usage

PLOTS TO BE SOLD809.36
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS10733.442
CONSTRUCTION OF ROADS12842
PAVEMENTS0
PARKS AND PLAYGROUNDS7964.691
GREEN BELTS0
VEHICLE PARKINGS6375
ELECTRICITY SUB-STATION0
CLUB HOUSE354.617
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER12841.975
Total51921.085

Cost Details

Land Cost296.00 Lakhs
Other Cost987.00 Lakhs
Estimated Project Cost3983.00 Lakhs
Estimated Infrastructure Cost270.00 Lakhs
Estimated Apartment Construction Cost2430.00 Lakhs

Documents

LOI

Uploaded on: 20-02-2020

SITE PLAN

Uploaded on: 20-02-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 20-02-2020

14 IDW DESIGN AND COST ESTIMATES

Uploaded on: 20-02-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 20-02-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 20-02-2020

DETAIL OF AUTHORISED SIGNATORY

Uploaded on: 20-02-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 20-02-2020

LICENSE NO 113 OF 2008 71 OF 2010 62 OF 2011

Uploaded on: 20-02-2020

LC-IV

Uploaded on: 20-02-2020

AIRPORT HEIGHT CLEARANCE NOC

Uploaded on: 20-02-2020

BUILDING PLAN (BR III)

Uploaded on: 20-02-2020

FIRE FIGHTING SCHEME

Uploaded on: 20-02-2020

FOREST NOC

Uploaded on: 20-02-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 16-12-2019

DEMARCATION PLAN

Uploaded on: 16-12-2019

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 16-12-2019

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 16-12-2019

18 CA CERTIFICATE

Uploaded on: 14-01-2020

OCCUPATON CERTIFICATE

Uploaded on: 16-01-2020

TOWER A ELEVATION

Uploaded on: 16-01-2020

28 SANCTION LETTER HOME LOAN TIE UPS

Uploaded on: 14-01-2020

6 LIST OF DIRECTORS

Uploaded on: 14-01-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 16-12-2019

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 17-01-2020

10 LOCATION PLAN

Uploaded on: 14-01-2020

20 ENCUMBRANCES

Uploaded on: 14-01-2020

4 MOA AOA

Uploaded on: 14-01-2020

1 REP I

Uploaded on: 14-01-2020

TOWER A ELEVATION

Uploaded on: 16-01-2020

2 REGISTRATION CERTIFICATE

Uploaded on: 14-01-2020

8 RESOLUTION

Uploaded on: 14-01-2020

22 DEVELOPMENT WORK PLAN

Uploaded on: 14-01-2020

25 ALLOTTMENT LETTER RESIDENTIAL

Uploaded on: 14-01-2020

3 PAN CARD

Uploaded on: 14-01-2020

10 SECTORIAL MAP

Uploaded on: 14-01-2020

TOWER-A 17 TO 18 TERRACE AND TOILET FLOOR PLAN

Uploaded on: 14-01-2020

19 PROJECT REPORT

Uploaded on: 16-01-2020

9 PROJECT DESCRIPTION AND COST

Uploaded on: 14-01-2020

26 HRERA AFS RESIDENTIAL APARTMENT FINAL

Uploaded on: 14-01-2020

11 AKS SHEJRA WITH LAND DETAILS

Uploaded on: 14-01-2020

13 APPROVAL OF SERVICE PLAN OR ESTIMATE FOR GH

Uploaded on: 14-01-2020

15 DETAIL OF UNITS

Uploaded on: 17-01-2020

17 TIME PERIOD COMMITED TO ALLOTTEE

Uploaded on: 14-01-2020

29 ADVERTISEMENT

Uploaded on: 14-01-2020

TOWER A AREA CALCULATION ALL FLOOR PLAN

Uploaded on: 16-01-2020

21 LIST OF ARCHITECT ENGINEER ETC

Uploaded on: 14-01-2020

TOWER A SECTIONS

Uploaded on: 16-01-2020

24 BOOKING APPLICATION FORM RESIDENTIAL FINAL

Uploaded on: 14-01-2020

29 CASH FLOOW STATMENT

Uploaded on: 16-01-2020

5 BALANCE SHEET

Uploaded on: 14-01-2020

16 DETAIL OF PARKING

Uploaded on: 14-01-2020

TOWER A GF TO 16 FLOOR PLAN

Uploaded on: 14-01-2020

7 SHAREHOLDERS

Uploaded on: 14-01-2020

27 CONVEYANCE DEED RESIDENTIAL FINAL

Uploaded on: 14-01-2020

21 ANNEXURE 3 3

Uploaded on: 17-01-2020

17 ARCHITECT AND ENGINEER CERTIFICATE

Uploaded on: 14-01-2020

19 COLLECTION STATEMENT

Uploaded on: 14-01-2020

12 REVENUE RECORDS SALE DEED ETC

Uploaded on: 16-01-2020

ZONING PLAN

Uploaded on: 20-02-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 20-02-2020

REGISTRATION CERTIFICATE LIFESTYLE HOMES (BLOCK-A)

Uploaded on: 20-02-2020

Statutory Approvals

LAY OUT PLANDate: 23-02-2012Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 09-09-2011Status: ALREADY BEEN OBTAINED
BUILDING PLANDate: 23-02-2012Status: ALREADY BEEN OBTAINED
FLOOR PLANDate: 23-02-2012Status: ALREADY BEEN OBTAINED
APARTMENT PLANSDate: 23-02-2012Status: ALREADY BEEN OBTAINED
ELEVATION SECTIONDate: 23-02-2012Status: ALREADY BEEN OBTAINED
SERVICE ESTIMATEDate: 04-08-2014Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
STPYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED

NOC

ROADSProvider: HUDA/HSVPApproval Status: Pending
WATER SUPPLYProvider: HUDA/HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA/HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HUDA/HSVPApproval Status: Pending

Project Team

Authorized Representative

MR VIRENDER DHAR
Name
MR VIRENDER DHAR
PAN
XXXX232D
Email
vatika.rera@vatikagroup.com
Mobile
9810566938
Landline
01244177777
Address
Flat No. M-113SF Blossom-2 Artemis Hospital Sector-51 Gurgaon Smaspur Gurgaon- 122003.

Managing Director/CEO

MR GAUTAM BHALLA
Name
MR GAUTAM BHALLA
PAN
XXXX807G
Email
vatika.rera@vatikagroup.com
Mobile
9958999160
Landline
01244177777
Address
Farm No 4 Hyde Park Sultanpur Farm Mehrauli Delhi 110030 India.

Directors

MR ANIL BHALLA
Name
MR ANIL BHALLA
PAN
XXXX416N
Email
vatika.rera@vatikagroup.com
Mobile
9871196506
Landline
01244177777
Address
Farm No- 4 Hyde Park Prakriti Marg Sultanpur Farms Mehrauli Delhi- 110030 India.
MR VIJENDER KUMAR
Name
MR VIJENDER KUMAR
PAN
XXXX305H
Email
vatika.rera@vatikagroup.com
Mobile
9871196504
Landline
01244177777
Address
House No. 51 Village Naharpur Kasan Galleria Gurugram - 122009.
MR BRIJ KISHORE SINGH
Name
MR BRIJ KISHORE SINGH
PAN
XXXX890G
Email
vatika.rera@vatikagroup.com
Mobile
9928017864
Landline
01244177777
Address
Baluda Road Sohna Gurgaon Haryana-122001 India.

Contact Details

Project ContactEmail: vatika.rera@vatikagroup.comMobile: 8800772626Landline: 0000000000
Project Contact PersonName: ARUP KUMAR DASEmail: vatika.rera@vatikagroup.comMobile: 8800772626Landline: 0000000000

Land Details

Land Area12.83 (Acre)
Proposed FAR168.331
Permissible FAR175
Total Licensed Land12.83 (Acre)

Land Usage

Land Cost296.00 Lakhs
Other Cost987.00 Lakhs
Estimated Project Cost3983.00 Lakhs
Estimated Infrastructure Cost270.00 Lakhs
Estimated Apartment Construction Cost2430.00 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP14.4
Other0
Shopping area0
Street lighting14.4
Roads & Pavements64.8
Water Supply System19.2
Storm Water Drainage24
Parks and Playgrounds12
Rain Water Harvesting4.8
Electrical Sub station24
Electricity Supply System36
Security and fire fighting4.8
Clubhouse/community centres0
Sewerage treatment & garbage disposal21.6

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electrical Sub station--01
Electricity Supply System--0.51.5
Other--00
Parks and Playgrounds--00.5
Rain Water Harvesting--0.20.2
Roads & Pavements--1.72.7
STP--0.10.6
Security and fire fighting--0.20.2
Sewerage treatment & garbage disposal--0.90.9
Shopping area--00
Storm Water Drainage--0.51
Street lighting--0.10.6
Water Supply System--0.80.8
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electrical Sub station20--
Electricity Supply System2.50--
Other00--
Parks and Playgrounds10--
Rain Water Harvesting0.20--
Roads & Pavements3.70--
STP1.10--
Security and fire fighting0.20--
Sewerage treatment & garbage disposal0.90--
Shopping area00--
Storm Water Drainage1.50--
Street lighting1.10--
Water Supply System0.80--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEREFER SECTION BELOW
WALL FINISHING DETAILSREFER SECTION BELOW
KITCHEN DETAILSREFER SECTION BELOW
BATHROOM FITTINGSREFER SECTION BELOW
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESALUMINUM OR UPVC FRAME
GLASS WORKALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
ELECTRIC FITTINGSIS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCHGEAR AND DISTRIBUTION BOXES FROM STANDARD MAKES AND BRAND
CONDUCTING AND WIRING DETAILSIS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS. ADEQUATE PROVISION FOR LIGHT POINTS, FAN POINTS, RECEPTACLES AND POWER POINTS IN ALL ROOMS
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGEOHT &UG TANKS
LIFT DETAILSSPACIOUS ELEVATORS WITH PLEASING INTERIORS
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
DOORSNA
MAIN DOORSPOLISHED VENEER DOOR WITH POLISHED HARDWOOD FRAME
INTERNAL DOORSPAINTED HARDWOOD FRAMES AND FLUSH DOORS
AIR CONDITIONINGAIR-CONDITIONING THROUGH A COMBINATION OF SPLITS AND WINDOW AC’S IN ALL BEDROOMS AND LIVING ROOMS
ELECTRICAL FITTINGSMENTIONED IN POINT NO.8 ABOVE
CNG PIPE LINEPROVISION FOR SUPPLY OF PIPED NATURAL GAS / LPG SUPPLY TO THE KITCHEN
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS
INTERNAL FINISHINGMENTIONED IN DETAIL IN SECTION BELOW.

Unit-wise Specifications

TOILET
FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES OF A REPUTED MAKE AND BRAND
WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. OIL BOUND DISTEMPER ON PLASTERED SURFACES ABOVE DADO LEVEL
CEILINGFALSE CEILING
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
KITCHEN
FLOORMATT FINISHED CERAMIC TILES
WALLS2’ HIGH PREMIUM CERAMIC TILES DADO ABOVE COUNTER. OIL BOUND DISTEMPER ON PLASTER IN REMAINING AREAS
CEILINGOBD ON PLASTER
COUNTERSGRANITE COUNTER TOP
FIXTURESA DOUBLE BOWL SINK, MIXER,
KITCHEN APPLIANCESCOOK TOP & CHIMNEY INSTALLATION
SIT-OUTS
FLOORMATT FINISHED / ANTI SKID CERAMIC TILES
WALLS & CEILINGPAINT ON PLASTER
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS
CEILINGOBD ON PLASTER
WARDROBESNOT PROVIDED
MASTER TOILET
FLOORMATT FINISHED/ANTI-SKID CERAMIC TILES OF A REPUTED MAKE AND BRAND
WALLSMATT FINISHED WALL TILES UP TO DADO LEVEL. OIL BOUND DISTEMPER ON PLASTERED SURFACES ABOVE DADO LEVEL
CEILINGFALSE CEILING
COUNTERSGRANITE COUNTER
SANITARY WARE/CP FITTINGSWASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
FITTING/FIXTURESSINGLE LEVER BASIN MIXER, CONCEALED SHOWER MIXER / DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS
CEILINGOBD ON PLASTE
MODULAR WARDROBESNOT PROVIDED
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORPOLISHED LAPATO OR MATT FINISHED VITRIFIED TILES OF REPUTED MAKE AND BRAND
WALLSEMULSION PAINT ON SMOOTH PLASTERED WALLS.
CEILINGOBD ON PLASTER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORMATT FINISHED CERAMIC TILES
WALLS & CEILINGPAINT ON PLASTER
TOILETMATT FINISHED CERAMIC TILES ON FLOOR
BALCONYMATT FINISHED / ANTI SKID CERAMIC TILES

Fee Details

Payment 1
amount:107000
cheque no:56941
draft date:28-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK LIMITED