NEWActive

HORIZON 82

GURUGRAM, MANESAR
29-04-2024
Launch Date
NEW
Type
2029-12-31
Completion Date

Overview

Launch Date

29-04-2024

Completion Date

2029-12-31

RERA ID

RERA-GRG-1558-2024

Basic Details

Project NameHORIZON 82
Project IDRERA-GRG-1558-2024
Project TypeNEW
Applicant TypeCompany
Submission Date29-04-2024 02:35:53 PM
Builder NameVATIKA LIMITED
CINU74899HR1998PLC054821
PANXXXX647G
Emailvatika.rera@vatikagroup.com
Websitehttp://www.vatikacollection.com
Phone (Mobile)9810566938
Phone (Landline)01244177777
Registered AddressUNIT NO. - A-002, INXT CITY CENTRE, GROUND FLOOR, BLOCK - A, SECTOR - 83,VATIKA INDIA NEXT, GURURAM - 122012
Project AddressSECTOR - 82A, VILLAGE SHIKOHPUR
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NameHDFC BANK, VATIKA ATRIUM, A-BLOCK, GOLF COURSE ROAD, SECTOR-53, GURUGRAM
Account Number57500001515052
IFSC CodeHDFC0000572
MICR Code110240093
Branch Code572

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Anil Bhalla, Gautam Bhalla, KV George, Abhinav Jain
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area8.0094 (Acre)
Proposed FAR100
Permissible FAR100
Total Licensed Land8.0094 (Acre)

Land Usage

PLOTS TO BE SOLD16119.85
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS9178.667
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY150
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES3241.53
ANY OTHER1289.07
ORGANISED2433.65
Total32412.767

Cost Details

Land Cost40.11 Lakhs
Other Cost7097.12 Lakhs
Estimated Project Cost7537.98 Lakhs
Estimated Infrastructure Cost379.54 Lakhs
Estimated Apartment Construction Cost21.21 Lakhs

Documents

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 18-04-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 29-04-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 29-04-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 12-11-2025

ASSETS MORTGAGEDCHARGED TO THE BANK

Uploaded on: 12-11-2025

8 SALE DEED NO 190

Uploaded on: 12-11-2025

FOREST LAND DIVERSION OR NOC

Uploaded on: 12-11-2025

AFFIDAVIT FOR LAND OWNERS

Uploaded on: 12-11-2025

3 SALE DEED NO 67

Uploaded on: 12-11-2025

ACCOUNT DETAILS

Uploaded on: 12-11-2025

FOREST NOC

Uploaded on: 12-11-2025

APP. FROM HSVP ROAD LAYOUT PLAN-8.00937 ACRES

Uploaded on: 12-11-2025

APP. FROM HSVP WATER SUPPLY LAYOUT PLAN-8.00937 ACRES

Uploaded on: 12-11-2025

NON-DEFAULT

Uploaded on: 12-11-2025

ZONING PLAN

Uploaded on: 12-11-2025

APP. FROM HSVP RECYCLE WATER LAYOUT PLAN-8.00937 ACRES

Uploaded on: 12-11-2025

COPY OF ANNUAL REPORT OF 2020-2021

Uploaded on: 12-11-2025

5 SALE DEED NO 1119

Uploaded on: 12-11-2025

REVISED DRAFT BROCHURE

Uploaded on: 12-11-2025

APP. FROM HSVP SEWER LAYOUT PLAN-8.00937 ACRES

Uploaded on: 12-11-2025

CA CERTIFICATE

Uploaded on: 12-11-2025

ASSURANCE FOR STORM WATER

Uploaded on: 12-11-2025

AFFIDAVIT 42LD

Uploaded on: 12-11-2025

REVISED COSTING

Uploaded on: 12-11-2025

CONVEYANCE DEED

Uploaded on: 12-11-2025

PAYMENT RECEIPT

Uploaded on: 12-11-2025

BUILDER BUYER AGREEMENT

Uploaded on: 12-11-2025

MUTATION

Uploaded on: 12-11-2025

JAMABANDI

Uploaded on: 12-11-2025

PRESCRIBED FORM ROC

Uploaded on: 12-11-2025

TREE CUTTING PERMISSION OR NOC

Uploaded on: 12-11-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 12-11-2025

9 SALE DEED NO 3856

Uploaded on: 12-11-2025

SERVICE PLANS ESTIMATES

Uploaded on: 12-11-2025

REVISED DRAFT BROCHURE

Uploaded on: 12-11-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 12-11-2025

AFFIDAVIT FOR AREA SHARING

Uploaded on: 12-11-2025

BR AUTHORISED SIGNATORY

Uploaded on: 12-11-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 12-11-2025

LOI

Uploaded on: 12-11-2025

LC-IV & LC-IV (A)

Uploaded on: 12-11-2025

COLLABORATION AGREEMENTS

Uploaded on: 12-11-2025

PROJECT REPORT

Uploaded on: 12-11-2025

AKS-SHEJRA

Uploaded on: 12-11-2025

LAND TITLE SEARCH REPORTS

Uploaded on: 12-11-2025

ASSURANCE OF SUPPLY OF POWER LOAD

Uploaded on: 12-11-2025

NATURAL CONSERVATION ZONE OR NOC

Uploaded on: 12-11-2025

POWER LINE SHIFTING NOC

Uploaded on: 12-11-2025

ADDENDUM TO COLLABORATION AGREEMENT

Uploaded on: 12-11-2025

AFFIDAVIT BY PROMOTER-BANK ACCOUNT ARRANGEMENT

Uploaded on: 12-11-2025

AFFIDAVIT FOR LAND

Uploaded on: 12-11-2025

AFFIDAVIT GIVEN BY PROMOTER

Uploaded on: 12-11-2025

APP. FROM HSVP STORM LAYOUT PLAN-8.00937 ACRES

Uploaded on: 12-11-2025

BANK UNDERTAKING - HORIZON

Uploaded on: 12-11-2025

DEMARCATION PLAN

Uploaded on: 12-11-2025

SUPERIMPOSED DEMARCATION

Uploaded on: 12-11-2025

PERT CHART PROJECT PROGRESS CHART

Uploaded on: 12-11-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 12-11-2025

CHARGE ON THE PROJECT

Uploaded on: 12-11-2025

BROCHURE

Uploaded on: 12-11-2025

COPY OF BR

Uploaded on: 12-11-2025

ASSURANCE FOR WATER SUPPLY

Uploaded on: 12-11-2025

ASSURANCE FOR SEWERAGE

Uploaded on: 12-11-2025

ASSURANCE OF SUPPLY OF POWER LOAD

Uploaded on: 12-11-2025

JAMABANDI

Uploaded on: 12-11-2025

NET WORTH OF PROMOTER

Uploaded on: 12-11-2025

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 12-11-2025

QUARTERLY EXPENDITURE-SOURCES OF FUND AND COST

Uploaded on: 12-11-2025

REVISED ALLOTMENT

Uploaded on: 12-11-2025

SERVICE ESTIMATE REPORT & LICENSE ALONGWITH RENEWAL

Uploaded on: 12-11-2025

SERVICE PLAN & ESTIMATES

Uploaded on: 12-11-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 12-11-2025

1 SALE DEED NO 2060

Uploaded on: 12-11-2025

2 SALE DEED NO 1236

Uploaded on: 12-11-2025

4 SALE DEED NO 1536

Uploaded on: 12-11-2025

6 SALE DEED NO 1054

Uploaded on: 12-11-2025

7 SALE DEED NO 191

Uploaded on: 12-11-2025

10 SALE DEED NO 3826

Uploaded on: 12-11-2025

11 SALE DEED NO 3825

Uploaded on: 12-11-2025

12 SALE DEED NO 3633

Uploaded on: 12-11-2025

ALLOTMENT LETTER

Uploaded on: 12-11-2025

APPLICATION FORM

Uploaded on: 12-11-2025

Statutory Approvals

LICENSE NO. 19 OF 2024Date: 08-02-2029Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: No
Site PlanApproved: No
Floor PlanApproved: No
Apartment PlansApproved: No
Elevation SectionApproved: No
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGYET TO BE PREPARED
SEWERAGEYET TO BE PREPARED
UGTYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRIFICATIONYET TO BE PREPARED
ELECTRICAL METER ROOMYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

MR VIRENDER DHAR
Name
MR VIRENDER DHAR
PAN
XXXX232D
Email
vatika.rera@vatikagroup.com
Mobile
9810566938
Landline
01244177777
Address
Flat No. M-113SF Blossom-2 Artemis Hospital Sector-51 Gurgaon Smaspur Gurgaon- 122003.

Managing Director/CEO

NIL
Name
NIL
PAN
XXXX0000
Email
vatika.rera@vatikagroup.com
Mobile
0000000000
Landline
0000000000
Address
Nil

Directors

MR ANIL BHALLA
Name
MR ANIL BHALLA
PAN
XXXX416N
Email
vatika.rera@vatikagroup.com
Mobile
0000000000
Landline
01244177777
Address
Farm No- 4 Hyde Park Prakriti Marg Sultanpur Farms Mehrauli Delhi- 110030 India.
MR BRIJ KISHORE SINGH
Name
MR BRIJ KISHORE SINGH
PAN
XXXX890G
Email
vatika.rera@vatikagroup.com
Mobile
9928017864
Landline
01244177777
Address
Baluda Road Sohna Gurgaon Haryana-122001 India.
MR VIJENDER KUMAR
Name
MR VIJENDER KUMAR
PAN
XXXX305H
Email
vatika.rera@vatikagroup.com
Mobile
9871196504
Landline
01244177777
Address
Village- Naharpur Kasan House No.- 51 Post Office- Nakhrola Gurgaon-122001
MR SURENDER SINGH
Name
MR SURENDER SINGH
PAN
XXXX793N
Email
vatika.rera@vatikagroup.com
Mobile
9818879004
Landline
01244177777
Address
95 Mangu Mohalla Gariya Lambi Gali Ghitorni Gaon Gadaipur South Delhi-110030
MS RUCHI MUNJAL
Name
MS RUCHI MUNJAL
PAN
XXXX164F
Email
vatika.rera@vatikagroup.com
Mobile
9899934242
Landline
01244177777
Address
T-75 Rajouri Garden Tagore Garden Delhi-110027

Contact Details

Project ContactEmail: vatika.rera@vatikagroup.comMobile: 9910032427Landline: 0000000000
Project Contact PersonName: NIRMAL SINGHEmail: vatika.rera@vatikagroup.comMobile: 9910032427Landline: 0000000000

Land Details

Land Area8.0094 (Acre)
Proposed FAR100
Permissible FAR100
Total Licensed Land8.0094 (Acre)

Land Usage

Land Cost40.11 Lakhs
Other Cost7097.12 Lakhs
Estimated Project Cost7537.98 Lakhs
Estimated Infrastructure Cost379.54 Lakhs
Estimated Apartment Construction Cost21.21 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Construction Cost Booth-1.61.651.7
Electricity Supply System-000
Electrification-002
Other-000
Parking-056
Parks and Playgrounds-003
Rainwater Harvesting----
Roads & Pavements-7812
STP----
Sewerage treatment & garbage disposal-022
Shopping area-000
Storm Water Drainage-022
Street Lighting-001
Sub Station----
Underground Tank-002
Water Supply System-022
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction Cost Booth1.21.31.31.2
Electricity Supply System0000
Electrification3322
Other0000
Parking6564
Parks and Playgrounds3221
Rainwater Harvesting0.80.70.80.8
Roads & Pavements1011911
STP2221.5
Sewerage treatment & garbage disposal1.51.51.51.6
Shopping area0000
Storm Water Drainage21.511
Street Lighting2221.5
Sub Station0322
Underground Tank21.50.90.8
Water Supply System21.51.751.8
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction Cost Booth1.31.31.31
Electricity Supply System0000
Electrification1.51.7511
Other0000
Parking4554
Parks and Playgrounds0.90.81.31.2
Rainwater Harvesting0.60.60.50.6
Roads & Pavements6644
STP0.90.80.81
Sewerage treatment & garbage disposal1.61.61.61.6
Shopping area0000
Storm Water Drainage0.90.80.80.6
Street Lighting1.75111
Sub Station21.521.5
Underground Tank0.8110.9
Water Supply System1.61.61.61.6
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction Cost Booth10.80.80.9
Electricity Supply System0000
Electrification1110.8
Other0000
Parking4334
Parks and Playgrounds111.21.1
Rainwater Harvesting0.40.350.30.5
Roads & Pavements4334
STP10.90.90.9
Sewerage treatment & garbage disposal1.51.511
Shopping area0000
Storm Water Drainage0.60.90.90.9
Street Lighting110.80.7
Sub Station1111
Underground Tank0.90.90.80.7
Water Supply System1.51.511
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction Cost Booth0.70.70.40.55
Electricity Supply System0000
Electrification0.70.50.80.8
Other0000
Parking320.50.4
Parks and Playgrounds0.80.90.81
Rainwater Harvesting0.450.50.50.4
Roads & Pavements3310.6
STP0.80.70.50.33
Sewerage treatment & garbage disposal10.70.50.34
Shopping area0000
Storm Water Drainage0.80.50.60.21
Street Lighting10.80.80.69
Sub Station0.80.910.8
Underground Tank0.50.40.50.43
Water Supply System0.50.50.30.28
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Construction Cost Booth0.51---
Electricity Supply System00--
Electrification0.180--
Other00--
Parking0.20--
Parks and Playgrounds0.60.43--
Rainwater Harvesting0.210--
Roads & Pavements0.560--
STP----
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Street Lighting----
Sub Station0.80.73--
Underground Tank----
Water Supply System00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
WALL FINISHING DETAILSNOT APPLICABLE
KITCHEN DETAILSNOT APPLICABLE
BATHROOM FITTINGSNOT APPLICABLE
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESNOT APPLICABLE
GLASS WORKNOT APPLICABLE
ELECTRIC FITTINGSNOT APPLICABLE
CONDUCTING AND WIRING DETAILSNOT APPLICABLE
CUPBOARD DETAILSNOT APPLICABLE
WATER STORAGENOT APPLICABLE
LIFT DETAILSNOT APPLICABLE
EXTERNAL GLAZINGSNOT APPLICABLE
WINDOWS/GLAZINGSNOT APPLICABLE
DOORSNOT APPLICABLE
MAIN DOORSNOT APPLICABLE
INTERNAL DOORSNOT APPLICABLE
AIR CONDITIONINGNOT APPLICABLE
ELECTRICAL FITTINGSNOT APPLICABLE
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
INTERNAL FINISHINGNOT APPLICABLE

Unit-wise Specifications

TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
FIXTURESNOT APPLICABLE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSNOT APPLICABLE
FITTING/FIXTURESNOT APPLICABLE
MASTER BEDROOM/DRESSROOM
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
MODULAR WARDROBESNOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNOT APPLICABLE
WALLSNOT APPLICABLE
CEILINGNOT APPLICABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
TOILETNOT APPLICABLE
BALCONYNOT APPLICABLE

Fee Details

Payment 1
amount:661000
cheque no:965608
draft date:25-04-2024
payable to:HRERA Gurugram