OngoingActive

GULMOHUR GREENS PHASE II

Ghaziabad, Uttar Pradesh
01-05-2017
Launch Date
Ongoing
Type
14-11-2019
Completion Date

Overview

Launch Date

01-05-2017

Completion Date

14-11-2019

RERA ID

UPRERAPRJ3546

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)11872
Project NameGULMOHUR GREENS PHASE II
Registration Fee (in Rs.)64500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)31
DistrictGhaziabad
Original Start Date15-11-2011
TehsilGhaziabad
Proposed Start Date01-05-2017
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)5200
Proposed Completion Date14-11-2019

Location

Latitude

28.686116

Longitude

77.374955

Bank Details

Account no.003866300000022
Name Of Account HolderFRIEND LAND DEVELOPERS GULMOHAR GREENS PHASE II
Bank NameYES BANK LIMITED
Branch AddressRDC,RAJ NAGAR, GHAZIABAD
Branch NameRDC,RAJ NAGAR, GHAZIABAD
IFSC CodeYES0000038

Development Works

Demarcation of Plots

khasra no.(955 to 960 ),1010,1011,1015 & ( 1017 to 1051 ) ,Plot area 11872 Sq.mt.

Boundary Wall

Boundary wall on all sides with gates for entry and exit.

Road Work

Cement Concrete Internal Road (CC Road Above the 2 Coarse of WBM)

Footpaths

Foothpaths in Interlocking Pavers/Tiles

Water Supply Including Drinking Water Facilities

To be Provided by Ghaziabad Nagar Nigam and Storage will be done in underground water tank

Sewer System

Main Sewer line has been designed as per norms and running in basement ceiling and connected to STP

Drain

Underground pipe drain with chamber

Parks

Parks & Landscape will be designed as per authority guidelines

Tree Planting

Tree Planting will be designed as per authority guidelines

Design For Electric Supply Including Street Lighting

Design has been done as per UP electricity board guidelines

Community Buildings

Club has been designed as per authority norms and Facilities like Party Hall,Gaming Zone, Gym etc will be provided

Treatment and Disposal System of Sewage and Sullage water

STP 400 KLD will be installed

Solid Waste Management And Disposal System

Door to Door Collection and disposal up to garbage point of authority

Water Conservation System

Recycling of treated water and rain water harvesting system will be provided

Energy Management System Including Use of Renewable Energy

Solar panel will be provided as per norms at suitable place

Fire Protection And Fire Safety System

System will be provided & functional as per fire department guidelines

Social Infrastructure And Other Public Amenities Including Public Health Services

weekly doctor visits for health check up for all the construction workers

Emergency Evacuation Services

Emergency Lighting and periodic training for emergency evacuation will be provided by the security agency

Other Miscellaneous Work

NA

Documents

Registry Document

No: 2716 | Date: 01-04-2011

Registry Document

No: 5890 | Date: 11-09-2002

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 04-07-2018

Commencement Certificate

Uploaded: 25-06-2018

Proforma of Application Form

Uploaded: 28-06-2018

Proforma of Allotment Letter

Uploaded: 30-06-2018

Proforma of Conveyance Deed

Uploaded: 27-06-2018

Waste Disposal Plan

Uploaded: 25-06-2018

Water Supply Plan

Uploaded: 25-06-2018

Electricity Supply Plan

Uploaded: 25-06-2018

Development Work Plan

Uploaded: 25-06-2018

Affidavit

Uploaded: 04-07-2018

CA CERTIFICATE

Uploaded: 04-07-2018

ARCHITECT CERTIFICATE

Uploaded: 25-06-2018

ENGINEERS CERTIFICATE

Uploaded: 25-06-2018

Other Plan(If Any)

Uploaded: 07-04-2018

Other Plan(If Any)

Uploaded: 07-04-2018

Other Plan(If Any)

Uploaded: 07-04-2018

Other Plan(If Any)

Uploaded: 07-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 09-04-2018

Registry Document In Case of Own Land

Uploaded: 09-04-2018

Registry Document In Case of Own Land

Uploaded: 09-04-2018

Registry Document In Case of Own Land

Uploaded: 09-04-2018

Registry Document In Case of Own Land

Uploaded: 09-04-2018

Electricity Supply Plan

Uploaded: 09-04-2018

Water Supply Plan

Uploaded: 09-04-2018

Waste Disposal Plan

Uploaded: 09-04-2018

Authentic copy of Approval of Project

Uploaded: 09-04-2018

Authentic copy of Approval of Project

Uploaded: 09-04-2018

Authentic copy of Approval of Project

Uploaded: 09-04-2018

Authentic copy of Approval of Project

Uploaded: 09-04-2018

Commencement Certificate

Uploaded: 09-04-2018

Affidavit

Uploaded: 09-04-2018

Permits

Orignal Permit No568/THA/GH/2006
Orignal Permit Date15-11-2011
Valid Upto14-11-2016
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto14-11-2019
End Date14-11-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No568/THA/GH/2006
Orignal Permit Date15-11-2011
Valid Upto14-11-2016
Revalidated Permit No292/Enforcement Zone-7/2025
Revalidated Permit Date14-11-2019
Revalidated Permit Valid Upto14-11-2019
Permit Extendable Upto14-11-2019
End Date14-11-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameNot specified
Architect AddressNot specified
Architect Licence NumberNot specified
Structural Engineer NameNot specified
Structural Engineer AddressNot specified
Mobile number(Project Co-ordinator)9717095553

Land Details

AFS

Showing 4 blocks with 88 units

Property Summary

Total Carpet Area

14195.72 m²

152801.31 ft²

Total Units

176

2 different types

Blocks & Floors

4

11 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:80.66 m²
Balconies:242
Parking ratio:0.00 per unit

Block T-16

22 units

Block T-17

22 units

Block T-18

22 units

Block T-19

22 units

Khasra Details

Total Area

11872.00 m²

127789.02 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No955 to 960,1010,1011,1015 & 1017 to 1051
Area(In Sq. Mt.)11872

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameNot specified
Architect AddressNot specified
Architect Licence NumberNot specified
Structural Engineer NameNot specified
Structural Engineer AddressNot specified
Mobile number(Project Co-ordinator)9717095553