Total Units
154
2 unit types
Carpet Area
55,931 ft²
5,196.18 m² · carpet only, excludes balcony
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 363 ft² (33.74 m²)Balconies 88Parking per unit 0.002 of 156 rows list no units (2 floors are empty), so they add nothing to these totals
All blocks
Showing 50 of 156 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| A (B) | LGF | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | LGF | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | LGF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | LGF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | LGF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | LGF | SHOP | 1 | 1,534 ft²142.55 m² | — | — |
| A (B) | LGF | SHOP | 1 | 1,534 ft²142.55 m² | — | — |
| A (B) | LGF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | LGF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | LGF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | LGF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | GF | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | GF | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | GF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | GF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | GF | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | GF | SHOP | 1 | 1,534 ft²142.55 m² | — | — |
| A (B) | GF | SHOP | 1 | 1,534 ft²142.55 m² | — | — |
| A (B) | GF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | GF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | GF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | GF | SHOP | 1 | 221 ft²20.53 m² | — | — |
| A (B) | 1 | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | 1 | SHOP | 1 | 297 ft²27.55 m² | — | — |
| A (B) | 1 | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | 1 | SHOP | 1 | 280 ft²25.97 m² | — | — |
| A (B) | 1 | SHOP | 1 | 279 ft²25.89 m² | — | — |
| A (B) | 1 | SHOP | 1 | 279 ft²25.89 m² | — | — |
Total Plot Area
0.993 acres
4,020.10 m² · plot area
Total Plot Area 4020.10 Sq. Mtrs. Boundaries 59.26 m(NE), 66.87 m (SE) 59.26 m (SW) , 68.10 (NW)
Consisting Height 7 FT Consisting of RCC and Brick Work.
Yes, RCC Trimix Road with Kerbstone on sides. stone paving in front.
150 MM High From Road Level with Interlocking Tiles and Curbs Stone.
For Water Supply Including Drinking Water Facility in the Project.
STP and through Authority Sewage system.
Yes, Drains is installed with slope as per guidlines.
Yes, Hard and Soft Landscape is done in Park Area with Electrical Lighting.
Yes, Different variables of Trees arePlants as per site Conditions.
Yes, Electric Supply from UPPCL, Meter room, HT Room, Transformers 1000 KVA-2 No.
Not Applicable
STP will be installed in the Basement for sullage and treatment system capacity of 75 KLD.
Yes, Organic waste converter, collection bins segregation Table.
Rain Water Harvesting PIT is Given in Open area for Terrace and Site water.
Yes, Solar Plant will be installed on the top for conservation of electricity.
Diesel pump - 1 nos. 2850 IPM and 160 m head, Electrical pump for hydrant - 1nos. 2850 lpm and 160m head Jockey pump - 2 nos. 180 lpm and 160m head Water Curtain Pumps - 1no. , 2850 lpm and 160 m head Basement Internal and External Hydrant Sprinklers.
Not Applicable
Fire staircase is design for Evacuation services in building
Guard room, Entrance Exit Gate, CCTV as per requirement on period of time
Gold Square is located in Ghaziabad.
Yes. Gold Square is registered under UPRERAPRJ334171/10/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Gold Square is 30 April 2030.
Gold Square is developed by GKY INFRATECH LLPRAJBEER TYAGISACHIN TYAGISUMIT TYAGI.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.