Launch Date
Completion Date
RERA ID
28.701034
77.342197
DEMARCATION OF PLOTS AS PER THE SANCTION LAYOUT PLAN
BOUNDARY WALL AS PER THE SANCTION LAYOUT PLAN - HEIGHT UPTO 1.8 M
INTERNAL ROAD WORK DESIGNED OF DIFFERENT RIGHT OF WAY(ROW) AS PER THE REQUIREMENT - INTERNAL ROADS 6M WIDE
FOOTPATHS AS PER THE SANCTIONED LAYOUT PLAN
MUNICIPAL WATER SUPPLY IS USED FOR DRINKING PURPOSE
SEWERAGE SYSTEM IS USED AS PER THE DESIGNED CALCULATION
SEPARATE DRAINAGE SYSTEM LINE IS USED AS PER THE DESIGN REQUIREMENT
LANDSCAPE AREA IS PROVIDED AS PER THE LOCAL BUILDING BYE LAWS
40 NUMBER OF TREES AS PER THE APPROVED DRAWING AND REQUIREMENT
ELECTRICAL SUPPLY INCLUDING STREET LIGHTING IS PROVIDED AS PER THE LAYOUT PLAN
N.A.
DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER IS BEING USED THROUGH SEWERAGE TREATMENT PLANT WHICH IS USED FOR LANDSCAPE AND FLUSHING PURPOSE - SEWERAGE TREATMENT PLANT 320 KLD APPROX.
ALL THE SOLID WASTE MANAGED AS PER THE BIO DEGRADABLE WASTE CONVERTED IN COMPOST AND NON BIO DEGRADABLE DELIVERED TO REGISTERED RECYCLABLE AGENCIES - SOLID WASTE GENERATED APPROX 1.924 TON PER DAY.
LOW FLOW WATER FIXTURES BEING USED FOR WATER CONSERVATION AND STP WATER IS USED FOR LANDSCAPE AND FLUSHING PURPOSE.
N.A.
FIRE SYSTEM AND FIRE SAFETY WILL BE INSTALLED IN BUILDING AS PER THE NBC NORMS - INCLUDING FIRE HOSE REEL AND SPRINKLER SYSTEM
N.A.
AS PER THE MANAGEMENT PLAN AND DISASTER MANAGEMENT P[LAN. ALL PROVISIONS ARE MADE INCLUDING FIRE ASSEMBLY POINT.
OTHER MISCELLANEOUS WORK IS PROVIDED AS PER THE LAYOUT PLAN
Showing 1 blocks with 16 units
Total Carpet Area
18400.00 m²
198055.76 ft²
Total Units
800
1 different types
Blocks & Floors
1
15 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7652.18 m²
82367.30 ft²