Launch Date
Completion Date
RERA ID
28.68634
77.52464
Total 99 Plots have been demarcated as per map approved by the Ghaziabad Development Authority.
Boundary Wall is not applicable here this is the first phase of project falling within the total project land.
Total 1360 Running Meters Road to be built with Pavers Blocks
Total 204 running Meter footpaths will be built up using Paver Blocks as per Design
Water to be provided by the GDA and developer will make over head tank in at each villas.
Main Sewer Line has been design under grounded as per GDA Plans and finally it will be connect to STP for treating the sewage. Sewerage Line to be connect to the Centralized STP.
Drainage System will be underground and will be connected to the main sewer.
Park Landscape has been design as per approved Plan
Tree Planting has been design as per GDA Plan.
Single Feeder shall be taken from Paschimanchal Vidut Vitran Nigam Limited (PVVNL) and connected to the central substation and the entire project shall have street Light.
Not applicable
STP facilities shall be installed centralized and all sewage will be connected to the centralized STP. The treated water shall be used for flushing, irrigation, car wash, pathways cleaning.
The Project shall have the waste segregation area which will be set up as per approved layout plan.
Using Water efficient appliances, recycling water to use on Plants
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Other Miscellaneous work if any to compile with the As per approved Project Plan.
Total Area
39431.56 m²
424437.37 ft²