Part of existing group housing at SAGA City namely Ebony Green 1 & 2
Architectural boundary walls, mix of R.C.C. and brick work finished with cement plaster and paint.
Intenal & external road bitumen asphalt finish
Cement paver
Dual water supply piping for domestic & flushing and providing soft water for drinking treatment plant
240KLD STP plant with MBBR technology
Recharge pit system with ring main system and balance to drain into nala
Organized green with low height hedge/ ground cover/ tot lots & walkways
Timber/ evergreen/ flowering & ornamental trees
33KV/ 11KV main substation & further distribution individually with 11KV/ 415V to all society & street lights & poles
Not applicable as already provided in SAGA City
STP plant with MBBR technology & reused treated water in flushing/ road washing/ car washing & gardening etc.
Home to home collection by facility management team and put into different garbage section providing into SAGA City.
To take water from borewells and collect into underground tanks. After treatment, release for consumption as drinking, bathing & cloth washing.
Govt. electricity supply distribution system with own substation.
Providing internal FHC with hydrant, external hydrant, sprinkler in basement, stilt floor and lift lobby.
Nil
Nil
Nil
Showing 1 blocks with 28 units
Total Carpet Area
7311.04 m²
78695.30 ft²
Total Units
128
2 different types
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1956.00 m²
21054.19 ft²