28.70145
77.43299
AS PER SITE PLAN
PRECAST 5FT HEIGHT BOUNDARY WALL
SHALLBE DEVELOPED AS SHOWN IN LAYOUT.HEAVY PAIVER SHALL BE LAID.THICKNESS WILL BE 300 MM
FINISHED WITH INTERLOCKING TILES
CPVC PIPES SHALL BE LAID DOWN FROM UNDERGROUND WATER TANK TO OVERHEAD WATER TANK IN EACH BLOCK.
UPVC PIPES SHALL BE LAID DOWN FROM SEWRGE TO PLUMBING SHAFT JOINT TO VERTICAL STACKS AND THEN TRANSFER TO MAIN SEWER HOLE.
UPVC PIPES SHALL BE LAID INTO BALCONY AND TERRACE CONNECTED TO DRAINAGE MANHOLE.
5 PERCENT GREEN AREA IS TO BE DEVELOPED AS PER NORMS.
TREE-SILVER OAK TREE,NEEM ETC.
WILL BE PROVIDED AS PER UPPCL GUIDELINES
CLUB IS PROVIDED.
STP IS PROVIDED. EXCESS WATER IS TO BE DISPOSED TO MAIN SEWER LINE.
ALL WASTE IS SEGRIGATE AT SITE AND DISPOSE BY AUTHORIZED VENDOR
DUAL FLUSHING WILL BE PROVIDED
NA
FIRE SAFETY WILL BE INSTALLED AS PER NBC 2016 CODE NORMS.
NA
AS NBC 2016 NORMS
IF REQUIRED THEN WILL BE DONE
Showing 1 blocks with 36 units
Total Carpet Area
5639.88 m²
60707.10 ft²
Total Units
30
2 different types
Blocks & Floors
1
21 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2671.00 m²
28750.38 ft²