AVENUE 81

GURUGRAM, MANESAR
08-02-2021
Launch Date
NEW
Type
2025-12-31
Completion Date

Overview

Launch Date

08-02-2021

Completion Date

2025-12-31

RERA ID

RERA-GRG-808-2021

Basic Details

Project NameAVENUE 81
Project IDRERA-GRG-808-2021
Project TypeNEW
Applicant TypeCompany
Submission Date08-02-2021 06:02:21 PM
Builder NameM/S GLS INFRACON PVT. LTD.
CINU70102HR2013PTC051299
PANXXXX596F
Emailcs.compliance1@gmail.com
Websitehttp://www.glsinfra.in
Phone (Mobile)9717994849
Phone (Landline)01244200577
Registered Address707, 7TH FLOOR, JMD PACIFIC SQUARE, SECTOR-15, PART-II, GURUGRAM-122001
Project AddressSECTOR 81,GURUGRAM, SITUATED IN THE REVENUE ESTATE OF VILLAGE NAWADA FATEHPUR, DISTRICT GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilMANESAR

Bank Details

Bank NamePUNJAB NATIONAL BANK AT SECTOR 32, GUUGRAM
Account Number1237102100000021
IFSC CodePUNB0123710
MICR Code110024684
Branch Code123710

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Surinder Singh 707, 7th Floor, JMD Pacific Square, Sector - 15, Part – II, Gurugram, Haryana-122001
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)No Defaulted

Development Details

Land Area5.6625 (Acre)
Proposed FAR2.37
Permissible FAR2.37(Residential), 1.87(Commercial)
Total Licensed Land5.6625 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7564.392
CONSTRUCTION OF ROADS1376.124
PAVEMENTS0
PARKS AND PLAYGROUNDS1132.461
GREEN BELTS1088.344
VEHICLE PARKINGS10917.843
ELECTRICITY SUB-STATION361.129
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER44.662
METER ROOM11.972
ELECTRIC SWITCH YARD418.362
Total22915.289

Cost Details

Land Cost4339.61 Lakhs
Other Cost3376.383 Lakhs
Estimated Project Cost18874.66 Lakhs
Estimated Infrastructure Cost273.147 Lakhs
Estimated Apartment Construction Cost10885.52 Lakhs

Documents

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 06-02-2021

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 08-02-2021

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 08-02-2021

PARKING PLAN

Uploaded on: 01-03-2021

A. TOWER B- FLOOR PLAN

Uploaded on: 01-03-2021

A.TOWER CDE- STILT LEVEL PLAN

Uploaded on: 01-03-2021

SITE PLAN 81

Uploaded on: 01-03-2021

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 01-03-2021

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 01-03-2021

DEMARCATION PLAN

Uploaded on: 01-03-2021

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 01-03-2021

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 01-03-2021

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 01-03-2021

UNDERTAKING AAI

Uploaded on: 01-03-2021

B. TOWER A- FLOOR PLAN

Uploaded on: 01-03-2021

UNDERTAKING TREES

Uploaded on: 01-03-2021

AFFIDAVIT

Uploaded on: 01-03-2021

AKS-SHAJRA-81

Uploaded on: 01-03-2021

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 01-03-2021

SEARCH REPORT

Uploaded on: 01-03-2021

COLLABORATION AGREEMENT VEENA INDUSTRIES

Uploaded on: 01-03-2021

COLLABORATION AGREEMENT WITH GEETA YADAV

Uploaded on: 01-03-2021

COLLABORATION AGREEMENT WITH MUNESH

Uploaded on: 01-03-2021

SPA(GEETA & ANITA)

Uploaded on: 01-03-2021

SPA(MUNESH & JAGWATI)

Uploaded on: 01-03-2021

SPA(VEENA INDUSTRIES)

Uploaded on: 01-03-2021

LOI DATED 14.09.20 @ SEC 81

Uploaded on: 01-03-2021

LIC. NO. 34 OF 2020 DATED 30.10.2020

Uploaded on: 01-03-2021

LC IV & IV-A

Uploaded on: 01-03-2021

EC-ACKNOWLEDGEMENT SLIP_GLS INFRACON

Uploaded on: 01-03-2021

ACKNOWLEDGEMENT SLIP_GLS INFRACON

Uploaded on: 01-03-2021

APPLICATION SERVICE ESTIMATES

Uploaded on: 01-03-2021

BR-III

Uploaded on: 01-03-2021

ELECT. LOAD ASSURANCE

Uploaded on: 01-03-2021

FIRE SCHEME-APPLICATION

Uploaded on: 01-03-2021

FOREST NOC

Uploaded on: 01-03-2021

IGBC CERTIFICATE SEC-81, GURGAON

Uploaded on: 01-03-2021

ELEVATION & SECTIONS COMMUNITY & CRECHE

Uploaded on: 01-03-2021

SEWERAGE ASSURANCE

Uploaded on: 01-03-2021

STORM WATER

Uploaded on: 01-03-2021

UNDERTAKING TREES

Uploaded on: 01-03-2021

WATER ASSURANCE

Uploaded on: 01-03-2021

WATER NOC @ BP 81

Uploaded on: 01-03-2021

SITE PLAN-SUPERIMPOSED ON DEMARCATION

Uploaded on: 01-03-2021

GREEN AREA

Uploaded on: 01-03-2021

ZONING PLAN

Uploaded on: 01-03-2021

UNIT PLAN

Uploaded on: 01-03-2021

TOWER A -FLOOR PLAN

Uploaded on: 01-03-2021

B. TOWER B- FLOOR PLAN

Uploaded on: 01-03-2021

B. TOWER D- FLOOR PLAN

Uploaded on: 01-03-2021

B. TOWER E- FLOOR PLAN

Uploaded on: 01-03-2021

B PODIUM PLAN

Uploaded on: 01-03-2021

C. TOWER C,D,E- 20TH FLOOR PLAN

Uploaded on: 01-03-2021

A. TOWER A- ELEVATION PLAN

Uploaded on: 01-03-2021

SECTION TOWER-A

Uploaded on: 01-03-2021

SEWERAGE PLAN

Uploaded on: 01-03-2021

TOWER B- ELEVATION PLAN

Uploaded on: 01-03-2021

TOWER E - ELEVATION PLAN

Uploaded on: 01-03-2021

TOWER C- ELEVATION PLAN

Uploaded on: 01-03-2021

TOWER D- ELEVATION PLAN

Uploaded on: 01-03-2021

SECTION TOWER-B

Uploaded on: 01-03-2021

SECTION TOWER-C

Uploaded on: 01-03-2021

SECTION TOWER-D

Uploaded on: 01-03-2021

SECTION TOWER-E

Uploaded on: 01-03-2021

COMMERCIAL FLOOR

Uploaded on: 01-03-2021

COMMERCIAL SECTION & ELEVATION

Uploaded on: 01-03-2021

ROAD LAYOUT PLAN

Uploaded on: 01-03-2021

STORM LAYOUT

Uploaded on: 01-03-2021

WATER SUPPLY PLAN

Uploaded on: 01-03-2021

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 01-03-2021

JAMABANDI-81

Uploaded on: 01-03-2021

MUTATION-81

Uploaded on: 01-03-2021

Statutory Approvals

BUILDING PLAN APPROVAL BR-IIIDate: 08-02-2021Status: ALREADY BEEN OBTAINED
LOI ISSUED VIDE MEMO NO. LC-3774/ASSTT(AK)/2020/16240 DATED 14.09.2020Date: 14-09-2020Status: ALREADY BEEN OBTAINED
FOREST NOC ISSUED VIDE MEMO NO. YK1-3RE-DB9K DATED 06.10.2020Date: 06-10-2020Status: ALREADY BEEN OBTAINED
ELECTRIC LOAD ASSURANCE VIDE MEMO NO. CH-80-DRG.-PLCDate: 28-12-2020Status: ALREADY BEEN OBTAINED
WATER ASSURANCE VIDE MEMO NO. 450Date: 31-12-2020Status: ALREADY BEEN OBTAINED
SEWERAGE ASSURANCEDate: 30-12-2020Status: ALREADY BEEN OBTAINED
ARAWALI NOCDate: 27-01-2021Status: ALREADY BEEN OBTAINED
LICENSE NO. 34 OF 2020 DATED 30.10.2020Date: 30-10-2020Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 28-12-2020Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGYET TO BE PREPARED
STPYET TO BE PREPARED
UNDERGROUND WATER TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED

NOC

ROADSProvider: HSVP/ CONNECTED WITH EXISTING REVENUE RASTAApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Pending

Project Team

Authorized Representative

ASHISH DRALL
Name
ASHISH DRALL
PAN
XXXX415A
Email
ashish.drall@glsho.com
Mobile
9717994849
Landline
01244200577
Address
707 7th Floor JMD Pacific Square Sector 15 Part II Gurugram Haryana 122001

Managing Director/CEO

SURINDER SINGH
Name
SURINDER SINGH
PAN
XXXX525M
Email
surinderfca@glsho.com
Mobile
9810530275
Landline
01244200577
Address
Apartment No. 10B Elite Tower-P Subhash Chowk Sector-48 Belgravia Central Park II Gurgaon-122001

Directors

RAJESH GOYAL
Name
RAJESH GOYAL
PAN
XXXX855H
Email
rajesh@glsind.com
Mobile
9810699090
Landline
01244200577
Address
263 Sector 14 Gurgaon Haryana 122001

Contact Details

Project ContactEmail: cs.compliance1@gmail.comMobile: 9711478994Landline: 01244200577
Project Contact PersonName: RAKESH KUMAREmail: errakesh.sunshine@gmail.comMobile: 9711478994Landline: 01244200577

Land Details

Land Area5.6625 (Acre)
Proposed FAR2.37
Permissible FAR2.37(Residential), 1.87(Commercial)
Total Licensed Land5.6625 (Acre)

Land Usage

Land Cost4339.61 Lakhs
Other Cost3376.383 Lakhs
Estimated Project Cost18874.66 Lakhs
Estimated Infrastructure Cost273.147 Lakhs
Estimated Apartment Construction Cost10885.52 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Roads & Pavements0---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Water Supply System0---
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System001527
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal00510
Shopping area0000
Storm Water Drainage0000
Water Supply System0058
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System30282828
Other0003
Parks and Playgrounds0000
Roads & Pavements0055
Sewerage treatment & garbage disposal1515129
Shopping area0000
Storm Water Drainage0200
Water Supply System15151515
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System287.5410
Other82028.57.5
Parks and Playgrounds0555
Roads & Pavements5101010
Sewerage treatment & garbage disposal410510
Shopping area0000
Storm Water Drainage02.52.52.5
Water Supply System155515
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electricity Supply System5.50--
Other16.50.15--
Parks and Playgrounds50.5--
Roads & Pavements200--
Sewerage treatment & garbage disposal50--
Shopping area00--
Storm Water Drainage30--
Water Supply System55--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES
WALL FINISHING DETAILSOIL BOUND DISTEMPER
KITCHEN DETAILSTILES
BATHROOM FITTINGSISI MARKED
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESDOOR WITH WOODEN FRAME. WINDOW- ALUMINIUM/UPVC.
GLASS WORK4 MM FLOAT GLASS
ELECTRIC FITTINGSISI MARKED SWITCHES & SOCKETS
CONDUCTING AND WIRING DETAILSCOPPER WIRING IN CONCEALED CONDUITS
CUPBOARD DETAILSNA
WATER STORAGEOVER HEAD TANKS
LIFT DETAILSAS PER NBCC CODE
EXTERNAL GLAZINGSALUMINIUM/UPVC SECTION WITH 4MM THICK GLASS
WINDOWS/GLAZINGSALUMINIUM/UPVC SECTION WITH 4MM THICK GLASS
DOORSFLUSH DOORS (PAINTED)
MAIN DOORSFLUSH DOORS (PAINTED)
INTERNAL DOORSFLUSH DOORS (PAINTED)
AIR CONDITIONINGNA
ELECTRICAL FITTINGSISI MARKED SWITCHES & SOCKETS
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSNA
SANITARY WARE/CP FITTINGSISI MARKED, CP FITTINGS, W.C. & WASHBASIN
FIXTURESISI MARKED
KITCHEN
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSINDIAN MARBLE
FIXTURESISI MARKED
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSNA
SANITARY WARE/CP FITTINGSISI MARKED, CP FITTINGS, W.C. & WASHBASIN
FITTING/FIXTURESISI MARKED
MASTER BEDROOM/DRESSROOM
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES
WALLSOIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:1772000
cheque no:533560
draft date:08-02-2021
payable to:HRERA Gurugram
payee bank:PUNJAB NATIONAL BANK
Payment 2
amount:66500
cheque no:498103
draft date:19-02-2021
payable to:HRERA Gurugram
payee bank:YES BANK