Launch Date
Completion Date
RERA ID
28.42193
77.25230
GROUP HOUSING AT KHASRA NO -1048, 1061( KHATA NO -01004), VILL-NOOR, RAJ NAGAR EXTTENSION, GHAZIABAD. DEMARCATION OF PLOTS WILL BE DONE AS PER THE SANCTION MAP WITHPROPER SET BACKS
230MM WIDE AND 2.1 METRE HIGH EARTHQUAKE RESISTANT BOUNDARYWALL OF RCC/ MILD STEEL/BRICK FILLED. BOUNDARY WALL AT SITE WILL BE DONE ON BOTH SIDE OF THE BOUNDARY WALL AFTER ATHAT TWO COAT OF PAINTS WILL BE COATED.
ALL ROADS IN THE COMPLEX WILL BE IN COMBINATION OF CONCRETE PAVERSOF DIFFRENT COLOURS, SHAPE , THICKNESS. ROADS WILL BE MADE AT THE SITE .THE BASE OF THE ROADWILL BE FILLED BY RED MURUM, AFTER THAT 2 LAYER OF AGGREGATE WILL BE LAID TO MAKE SURE THAT THE ROAD IS UPTO THE MARK. AFTER THIS THE TOP LAYER WILL BE COLOURED , BLACK WHITE APEX ROAD WILL BE 7.5 MTR TO 12 MTR WIDE.
FOOTHPATH IN THE COMPLEX WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFRENTCOLOURS, SHAPE , THICKNESS OF 65MM AND 80MM LAID OVER 150MM WATER BOUND MACADAM SURFACE.
PORTABLE WATER SUPPLY FROM MUNICIPAL WATER SUPPLY SHALL BE COLLECTED IN UNDERGROUND COLLECTION TANK AND PUMPED TO OVERHEAD WATER TANK. THE SUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROM THE SAID OVERHAD WATERTANKS.
THE SEWAGE WILL BE COLLECTED THROUGH A SOIL PIPELINE ARRANGEMENT BENDS AND INSPECTION CHAMBERS LEADINGTO THE SEWAGE WATER TREATMENT PLANT (STP) OF THE PROJECT AND TREATEDWATER WILL BE USED FOR IRRIGATION AND FLUSHING PURPOSE.
DRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDED FOR COLLECTION AND CHANNELIZATION OF RAIN WATER (SURFACE RUNOFF).
INTERNAL PARK WILL BE PROVIDED AND MAINTAINED. THEPARKS WILL HAVE JOGGING TRACKS, CHILDREN PLAY AREA AND SITTING AREAS.
THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PROJECT AND ALONG THE BOUNDARY WALLS. THE TREESELECTION , FLORA AND VEGETAION.
ELECTRIC SUPPLY PROVIDED THROUGH 11/0.433KV TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUPS.
NA
SEWAGE SHALL BE TREATED IN SEWAGE TREATEMENTPLANT (STP) AND THEREAFTER TREATED WATER TO BE USEDFOR FLUSHINGAND IRRIGATION.
SOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STOREDIN GARBAGE ROOM. RECYCLABLE SHALL BE PROCESSED IN THE COMPOSET MACHINE TO MAKE.
RAIN WATER HARVESTING PITS SHALL BE PROVIDEDFOR GROUND WASTE RECHARGINGAND OVERFLOW TO BE DISCHARGE IN THE MUNICIPAL DRAINS. TREATED SEWAGE.
SINGLE POINT METERING WILL BE THERE FOR ENERGY PURCHASED FROM THEGRID/POWER SUPPLY COMPANY.
SPRINKLER, FIRE DOORS, YARD HYDRANTS, SMOKE DETECTOR AND FIREALARM SYSTEM WILL BEPROVIDED AS APPLICABLE.
COMMON SOCIAL INFRASTRUCTURE SHALL BE PROVIDED FOR ALL THE TOWER COMBINED.
FIRE STAIRCASES SHALL BE PROVIDEDAS PER THE APPROVED FIR DRAWING FOR EVACULATION TO OPEN AREAS.
NA
Showing 1 blocks with 378 units
Total Carpet Area
44430.31 m²
478243.41 ft²
Total Units
375
5 different types
Blocks & Floors
1
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12674.00 m²
136421.67 ft²