NEWActive

ASHIANA ANMOL PHASE III & PLAZA PH II

GURUGRAM, SOHNA
10-09-2021
Launch Date
NEW
Type
2028-12-31
Completion Date

Overview

Launch Date

10-09-2021

Completion Date

2028-12-31

RERA ID

RERA-GRG-929-2021

Basic Details

Project NameASHIANA ANMOL PHASE III & PLAZA PH II
Project IDRERA-GRG-929-2021
Project TypeNEW
Applicant TypeCompany
Submission Date10-09-2021 03:05:02 PM
Builder NameASHIANA HOUSING LIMITED
CINL70109WB1986PLC040864
PANXXXX093P
EmailAyush.gupta@ashianahousing.com
Websitehttp://www.ashianahousing.com
Phone (Mobile)9650524421
Phone (Landline)01142654265
Registered Address5F, EVEREST, 46/C, CHOWRINGHEE ROAD, KOLKATA 70071 WEST BENGAL
Project AddressVILL. DHUNELA SEC 33 SOHNA
DistrictGURUGRAM
TehsilSOHNA

Bank Details

Bank NameHDFC BANK GK II NEW DELHI
Account Number50200056967514
IFSC CodeHFDC0000027
MICR Code11024005
Branch Code27

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)VISHAL GUPTA, W-177 GK II NEW DELHI Ankur Gupta, C8 3RD FLOOR MAHARANI BAGH DELHI Varun Gupta, N52 PANSHIL PARK DELHI
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)UPLOADED

Development Details

Land Area6.7879 (Acre)
Proposed FAR0.43
Permissible FAR1.75
Total Licensed Land13.3375 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.7135
CONSTRUCTION OF ROADS0.941
PAVEMENTS0
PARKS AND PLAYGROUNDS0.5469
GREEN BELTS0
VEHICLE PARKINGS0.4231
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER1.2555
SERVICE2.90657
Total6.78657

Cost Details

Land Cost5563.52 Lakhs
Other Cost9228.8 Lakhs
Estimated Project Cost23119.09 Lakhs
Estimated Infrastructure Cost961.08 Lakhs
Estimated Apartment Construction Cost7371.69 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 10-09-2021

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 10-06-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 10-06-2022

OC ANMOL

Uploaded on: 10-06-2022

ENIVRONMENT CLEARANCE

Uploaded on: 10-06-2022

FOREST NOC

Uploaded on: 10-06-2022

ELECTRICITY APPROVAL

Uploaded on: 10-06-2022

ASSURANCE STROM WATER AND SEWAGE DISPOSAL

Uploaded on: 10-06-2022

FRESH WATER NOC

Uploaded on: 10-06-2022

SUPERIMPOSED MAP FOR PH II & III

Uploaded on: 10-06-2022

ZONING PLAN

Uploaded on: 10-06-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 10-06-2022

LAND TITLE SEARCH REPORT

Uploaded on: 29-06-2022

BANK UNDERTAKING

Uploaded on: 29-06-2022

EQUITY CERTIFICATE

Uploaded on: 29-06-2022

FIRE SCHEME PH II

Uploaded on: 29-06-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 29-06-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 29-06-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 29-06-2022

SERVICE PLAN APPROVAL LETTER

Uploaded on: 29-06-2022

FIRE FIGHTING PLAN

Uploaded on: 30-06-2022

SEVICE ESTIMTES

Uploaded on: 30-06-2022

SEWAGE LAYOUT

Uploaded on: 30-06-2022

STROM WATER PLAN

Uploaded on: 30-06-2022

WATER SUPPLY PLAN

Uploaded on: 30-06-2022

SITE PLAN FIRE

Uploaded on: 30-06-2022

Statutory Approvals

ENVIRONMENT CLEARANCEDate: 28-12-2015Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 12-08-2014Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 16-02-2021Status: ALREADY BEEN OBTAINED
AAI HEIGHT NOCDate: 29-08-2019Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 05-03-2021Status: ALREADY BEEN OBTAINED
FIRE FIGHTING SCHEME APPROVALDate: 22-12-2021Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATE APPROVALDate: 17-12-2021Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERSUBMITTED TO HUDA
ELECTRIC SUB STATIONAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
SEWAGE SYSTEMAS PER PROJECT REPORT

NOC

ROADSProvider: HUDA -ALREADY CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDAApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Authorized Representative

ABHIJIT JOSHI
Name
ABHIJIT JOSHI
PAN
XXXX475R
Email
ABHIJIT.JOSHI@ASHIANAHOUSING.COM
Mobile
9829068251
Landline
01142654265
Address
PMC062 DLF PRIMUS SEC 82 AGURGAON

Managing Director/CEO

VISHAL GUPTA
Name
VISHAL GUPTA
PAN
XXXX377M
Email
VISHAL@ASHIANAHOUSING.COM
Mobile
9810047420
Landline
01142654265
Address
W-177 GK II NEW DELHI

Directors

VARUN GUPTA
Name
VARUN GUPTA
PAN
XXXX994P
Email
VARUN.GUPTA@ASHIANAHOUSING.COM
Mobile
9958562999
Landline
01142654265
Address
N52 PANSHIL PARK DELHI
ANKUR GUPTA
Name
ANKUR GUPTA
PAN
XXXX378E
Email
ANKUR.GUPTA@ASHIANAHOUSING.COM
Mobile
9810789884
Landline
01142654265
Address
C8 3RD FLOOR MAHARANI BAGH DELHI

Contact Details

Project ContactEmail: AYUSH.GUPTA@ASHIANAHOUSING.COMMobile: 9599052793Landline: 0124355111
Project Contact PersonName: MS CHAUHANEmail: MS.CHAUHAN@ASHIANAHOUSING.COMMobile: 9599052793Landline: 0124355111

Land Details

Land Area6.7879 (Acre)
Proposed FAR0.43
Permissible FAR1.75
Total Licensed Land13.3375 (Acre)

Land Usage

Land Cost5563.52 Lakhs
Other Cost9228.8 Lakhs
Estimated Project Cost23119.09 Lakhs
Estimated Infrastructure Cost961.08 Lakhs
Estimated Apartment Construction Cost7371.69 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electricity Supply System0005
Other0000
Parking---22
Parks and Playgrounds0000
Rain water Harvesting--14
Renewable Energy System----
Roads & Pavements19191923
Security and Fire Fighting Services15203825
Sewerage treatment & garbage disposal0142121
Shopping area0000
Storm Water Drainage0133
Street Light----
Underground Tank-123
Water Supply System072121
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station79123
Electricity Supply System14634436
Other0000
Parking332612-
Parks and Playgrounds1111
Rain water Harvesting652-
Renewable Energy System-333
Roads & Pavements3968280
Security and Fire Fighting Services19232328
Sewerage treatment & garbage disposal14400
Shopping area0000
Storm Water Drainage4430
Street Light-383
Underground Tank321-
Water Supply System2121120
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electrical Sub Station----
Electricity Supply System0---
Other0---
Parking----
Parks and Playgrounds0---
Rain water Harvesting----
Renewable Energy System2---
Roads & Pavements0---
Security and Fire Fighting Services15---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Light----
Underground Tank----
Water Supply System0---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/ DINING / LOBBY : DOUBLE CHARGED VITRIFIED TILES BEDROOM: DOUBLE CHARGED VITRIFIED TILES KITCHEN. OF HOUSE DOUBLE CHARGED VITRIFIED TILES BATHROOM & BALCONY : CERAMIC TILES
WALL FINISHING DETAILSPLASTIC EMULSION OF PLEASING SHADE OF A REPUTED BRAND
KITCHEN DETAILSDOUBLE CHARGED VITRIFIED TILES, 600MM HIGH CERAMIC TILES DADO ABOVE PLATFROM AND PLASTIC PLASTIC EMULSION OF PLEASING SHADE. KITCHEN PLATFORM IN QUALITY QUARTZIGRANITE STONE WITH STAINLESS STEEL SINK WITH STAINLESS, SHINK DRAIN AND PROVISION FOR HOT AND COLD WATER SUPPLY.
BATHROOM FITTINGSEWC & WASH BASIN OF RAK BRAND/ROCA/JAQUAR OR EQUIVALENT GLASS CURTAIN IN MASTER TOILET, WALL MIXER & BATHROOM FITTINGS BASIN MIXER OF JAQUAR/GROHE/KOHLER OR EQUIVALENT. OTHER CP FILLINGS OR JAL/CONTINENTAL/PRAYAG OR EQUIVALENT MIRROR,TOWEL ROAD & HEALTH FAUCET.
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESFOLDED STEEL SECTION
GLASS WORKNA
ELECTRIC FITTINGSCONVENIENT PROVISION AND DISTRIBUTION OF LIGHTS AND ELECTRIC FITTINGS POWER PLUGS; PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM, GAS PIPELINE AND WATER PURIFIER POINT IN KITCHEN.
CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH WIRING DETAILS
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSTWO GEARLESS HIGH SPEED AUTOMATIC LIFTS IN EACH BLOCK WITH DG BACKUP.
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSNA
DOORS35 MM LAMINATED FLUSH DOOR/SKIN DOORS WITH HANDLE
MAIN DOORS35 MM LAMINATED FLUSH DOOR/SKIN DOORS WITH NIGHT LATCH, MAGICEYE AND HANDLE.
INTERNAL DOORS35 MM LAMINATED FLUSH DOOR/SKIN DOORS WITH HANDLE.
AIR CONDITIONINGPROVISION FOR SPLIT AC IN ALL BED ROOM AND LIVING ROOM(NO AIR CONDITIONER ARE PROVIDED)
ELECTRICAL FITTINGSNA
CNG PIPE LINEPROVISION FOR PIPED LPG IN THE KITCHEN WILL BE PROVIDED
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMENA
INTERNAL FINISHINGNA

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES HEIGHT UP TO 2100 MM
CEILINGPLASTERED WITH EITHER- A) SAND CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM
COUNTERSNA
SANITARY WARE/CP FITTINGSENC & WASH BASIN OF RAK BRAND ROCA/JAQUAR OR EQUIVALENT, WALL MIXER & BASIN MIXER OF JAQUAR/GROHE/KOHLEROR EQUIVALENT OTHER CP FILLINGS OR JAL/CONTINENTAL/PRAYAG OR EQUNALENT MIRROR, TOWEL ROAD & HEALTH FAUCET
FIXTURESNA
KITCHEN
FLOORDOUBLE CHARGED VITRIFIED TILES
WALLS600MM HIGH CERAMIC TILES DADO ABOVE PLATFORM AND PLASTIC EMULSION OF PLEASING SHADE OF REPUTED BRAND
CEILINGNA
COUNTERSNA
FIXTURESKITCHEN PLATFROM IN QUARTZIGRANITE STONE WITH STAINLESS STEEL SINK WITH DRAIN BOARD & PROVISION FOR HOT AND COLD WATER SUPPLY
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORDOUBLE CHARGED VITRIFIED TILES
WALLSPLEASING SHADE EMULSION PAINT (PLASTIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
CEILINGPLASTERED WITH EITHER- A) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES
WALLSCERAMIC TILES HEIGHT UP TO 2100 MM
CEILINGPLASTERED WITH EITHER-) SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM
COUNTERSNA
SANITARY WARE/CP FITTINGSEWC & WASH BASIN OF RAK BRAND/ROCA/JAQUAR OR EQUIVALENT GLASS CURTAIN IN MASTER TOILET, WALL MIXER & BASIN MIXER OF JAQUAR/GROHE/KOHLER OR EQUIVALENT. OTHER CP FILLINGS OR JAL/CONTINENTAL/PRAYAG OR EQUIVALENT MIRROR,TOWEL ROAD & HEALTH FAUCET.
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORDOUBLE CHARGED VITRIFIED TILES
WALLSPLEASING SHADE ENULSION PAINT (PLASTICI/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
CEILINGPLASTERED WITH EITHER- A) SAND CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORDOUBLE CHARGED VITRIFIED TILES
WALLSPLEASING SHADE ENULSION PAINT (PLASTICI/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
CEILINGPLASTERED WITH EITHER- A) SAND CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR B) GYPSUM
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILES
WALLS & CEILINGACRYLIC EMULSION WITH PLEASING SHADE OF A REPUTED BRAND AS PER ARCHITECT SUGGESTION
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:926488
cheque no:177544
draft date:09-09-2021
payable to:HRERA Gurugram
payee bank:HDFC
Payment 2
amount:1787439
cheque no:178281
draft date:04-06-2022
payable to:HRERA Gurugram
payee bank:HDFC
Payment 3
amount:9800
cheque no:214317305947
draft date:23-05-2022
payable to:HRERA Gurugram
payee bank:HDFC-IMPS