NEWActive

WATERSIDE RESIDENCES THE FOREST RESERVE-II

GURUGRAM, HARSARU ST
17-03-2025
Launch Date
NEW
Type
2031-06-30
Completion Date

Overview

Launch Date

17-03-2025

Completion Date

2031-06-30

RERA ID

RERA-GRG-1901-2025

Basic Details

Project NameWATERSIDE RESIDENCES THE FOREST RESERVE-II
Project IDRERA-GRG-1901-2025
Project TypeNEW
Applicant TypeCompany
Submission Date17-03-2025 01:27:36 PM
Builder NameKRISUMI CORPORATION PVT. LTD.
CINU70200HR2012PTC064545
PANXXXX565A
Emailakash@krisumi.com
WebsiteNot specified
Phone (Mobile)7303183987
Phone (Landline)7303183987
Registered AddressUNIT 02, 11TH FLOOR, EMAAR CAPITAL TOWER - 2, MG ROAD SECTOR 26, 122002, GURUGRAM
Project AddressSECTOR- 36A
DistrictGURUGRAM
TehsilHARSARU ST

Bank Details

Bank NameSUMITOMO MITSUI BANKING CORPORATION, 2ND FLOOR, WORLDMARK 3, HOSPITALITY DISTRICT, AEROCITY, NEW DELHI
Account Number10087016
IFSC CodeSMBC0000001
MICR Code445
Branch Code9971

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Akash Khurana, Apartment No. C-PH-01, Tower T C Araya, Sector 62,Bilaspur(146), Gurugram-122004
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area1.3125 (Acre)
Proposed FAR3.5
Permissible FAR3.5
Total Licensed Land33.3812 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.5443
CONSTRUCTION OF ROADS0.4422
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS0
VEHICLE PARKINGS0.1421
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
CIRCULAR ROAD0.1839
Total1.3125

Cost Details

Land Cost199.99 Lakhs
Other Cost5514.99 Lakhs
Estimated Project Cost47382.45 Lakhs
Estimated Infrastructure Cost3826.93 Lakhs
Estimated Apartment Construction Cost37840.54 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 17-03-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 17-03-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 17-03-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 17-03-2025

C21 -SUPER IMPOSED DEMARCATION PLAN PHASE 5

Uploaded on: 07-05-2025

TREE CUTTING AFFIDAVIT

Uploaded on: 07-05-2025

C2 & C3- ZONING

Uploaded on: 07-05-2025

C5 -PHASE 5 FLOOR PLANS

Uploaded on: 07-05-2025

D21 -PHASE 6 ALLOTTMENT LETTER

Uploaded on: 07-05-2025

C9 -PHASE 5 STRUCTURAL DRAWING

Uploaded on: 07-05-2025

D22 -PHASE 6 AGREEMENT FOR SALE

Uploaded on: 07-05-2025

JAMABANDI

Uploaded on: 07-05-2025

SERVICE ESTAIMATE APPLICATION

Uploaded on: 07-05-2025

D8 -COST ESTIMATES-PH 6

Uploaded on: 07-05-2025

C8 -PHASE 5 SECTION

Uploaded on: 07-05-2025

ENTRY OF LICENSE

Uploaded on: 07-05-2025

NEC HARSARU

Uploaded on: 07-05-2025

D5 - MCA ROC DETAILS

Uploaded on: 07-05-2025

NEC FROM MANESAR

Uploaded on: 07-05-2025

3 ACRE ADDENDUM TO COLL AGREEMENT

Uploaded on: 07-05-2025

D1- NDC-PHASE 6_REVISED 01-05-2025

Uploaded on: 07-05-2025

D22 -PHASE 6 AGREEMENT FOR SALE

Uploaded on: 07-05-2025

LOI

Uploaded on: 07-05-2025

BR III

Uploaded on: 07-05-2025

ASSURANCES

Uploaded on: 07-05-2025

SALE DEED PART 1

Uploaded on: 07-05-2025

C7 -PHASE 5 ELEVATION

Uploaded on: 07-05-2025

C22 -PHASE 5 PERT CHART

Uploaded on: 07-05-2025

LOI

Uploaded on: 07-05-2025

C6 -PHASE 5 APARTMENT PLAN

Uploaded on: 07-05-2025

D4 - PRESCRIBED FORM ROC

Uploaded on: 07-05-2025

D20 -PHASE 6 APPLICATION FORM

Uploaded on: 07-05-2025

D23 -PHASE 6 CONVEYANCE DEED

Uploaded on: 07-05-2025

MUTATION

Uploaded on: 07-05-2025

D8 -COST ESTIMATES-PH 6

Uploaded on: 07-05-2025

D9 -COST INCURRED CERTIFICATE-PH-6

Uploaded on: 07-05-2025

D20 -BANK UNDERTAKING PH 6

Uploaded on: 07-05-2025

D28 -ADVERTISEMENT

Uploaded on: 07-05-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 07-05-2025

C10 -PHASE 5 PARKING PLAN

Uploaded on: 07-05-2025

PHASE 5-6 SITE PLAN GREEN

Uploaded on: 07-05-2025

A1 - LICENSE

Uploaded on: 07-05-2025

LC IV

Uploaded on: 07-05-2025

PROJECT REPORT

Uploaded on: 07-05-2025

ROC

Uploaded on: 07-05-2025

ELECTRICAL ASSURANCE

Uploaded on: 07-05-2025

FOREST

Uploaded on: 07-05-2025

Statutory Approvals

BUILDING PLANDate: 23-01-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGYET TO BE PREPARED
STPYET TO BE PREPARED
UNDERGROUN D WATER TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED
CONSTRUCTION OF CIRCULATSUCH ROADAS PER PROJECT REPORT
SEWERAGE SYSTEMYET TO BE PREPARED

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

RAMBIR
Name
RAMBIR
PAN
XXXX086J
Email
info@krisumi.com
Mobile
7303183987
Landline
7303183987
Address
Badsa Jhajjar Haryana

Managing Director/CEO

AKASH KHURANA
Name
AKASH KHURANA
PAN
XXXX512R
Email
akash@krisumi.com
Mobile
7303183987
Landline
N/A
Address
Apartment No. C-PH-01 Tower TC Araya Sector-62 Bilaspur-122413

Directors

ASHOK KAPUR
Name
ASHOK KAPUR
PAN
XXXX341H
Email
info@krisumi.com
Mobile
9311337714
Landline
N/A
Address
B-5 Chirag Enclave Delhi-110048 India
TAKAHIRO YAMAZAKI
Name
TAKAHIRO YAMAZAKI
PAN
XXXX733J
Email
info@krisumi.com
Mobile
9311337714
Landline
N/A
Address
Apartment No. 14A Tower 12 Central Park Resort Sohna Road Gurgaon
YUJI KATO
Name
YUJI KATO
PAN
XXXX341H
Email
info@krisumi.com
Mobile
7303183987
Landline
N/A
Address
W29H The Room Central Park-2 Sohna road gurugram Haryana 122001
SUNANDAN KAPUR
Name
SUNANDAN KAPUR
PAN
XXXX602J
Email
info@krisumi.com
Mobile
9311337714
Landline
N/A
Address
Asma Farm 363 Tropical Drive Ghitorni MG Road Delhi-110030
RYUHEI ONO
Name
RYUHEI ONO
PAN
XXXX602J
Email
info@krisumi.com
Mobile
9311337714
Landline
N/A
Address
4-33-3-303 Seijo Satgaya-ku Tokyo Japan

Contact Details

Project ContactEmail: info@krisumi.comMobile: 7303183987Landline: 7303183987
Project Contact PersonName: RAMBIREmail: info@krisumi.comMobile: 7303183987Landline: 7303183987

Land Details

Land Area1.3125 (Acre)
Proposed FAR3.5
Permissible FAR3.5
Total Licensed Land33.3812 (Acre)

Land Usage

Land Cost199.99 Lakhs
Other Cost5514.99 Lakhs
Estimated Project Cost47382.45 Lakhs
Estimated Infrastructure Cost3826.93 Lakhs
Estimated Apartment Construction Cost37840.54 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Community Centre----
Construction of Circulation road----
Electrical Sub Station----
Electricity Supply System0000
Other0000
Parking----
Parks and Playgrounds0000
Rain water harvesting----
Renewable energy system----
Roads & Pavements0000
STP----
Security and Fire Fighting----
Sewerage System----
Sewerage system----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage11.5814.4714.4714.47
Street Lighting----
Street lighting----
Water Supply System0000
under Ground water tank----
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Community Centre----
Construction of Circulation road15.4415.4430.8846.32
Electrical Sub Station-14.4743.4257.9
Electricity Supply System0000
Other0000
Parking---4.82
Parks and Playgrounds0000
Rain water harvesting-4.829.6514.47
Renewable energy system----
Roads & Pavements23.1632.4255.5855.58
STP---7.24
Security and Fire Fighting19.319.338.657.9
Sewerage System----
Sewerage system---21.71
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage14.4720.2620.2620.26
Street Lighting----
Street lighting---4.82
Water Supply System9.6513.5123.1623.16
under Ground water tank---4.34
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Community Centre---0
Construction of Circulation road46.3246.3261.7615.44
Electrical Sub Station57.943.4243.4228.95
Electricity Supply System000144.75
Other0000
Parking14.4719.319.319.3
Parks and Playgrounds00019.3
Rain water harvesting24.1228.9514.470
Renewable energy system---0
Roads & Pavements69.4869.4869.4846.32
STP21.7128.9528.9528.95
Security and Fire Fighting57.957.977.219.3
Sewerage System65.1486.8586.8565.14
Sewerage system----
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage28.9528.9528.9528.95
Street Lighting14.4719.319.314.47
Street lighting0---
Water Supply System28.9528.9528.9519.3
under Ground water tank14.4721.7128.9528.95
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Community Centre----
Construction of Circulation road15.4415.44--
Electrical Sub Station----
Electricity Supply System86.8557.9--
Other00--
Parking9.659.65--
Parks and Playgrounds135.138.6--
Rain water harvesting----
Renewable energy system00--
Roads & Pavements23.1618.53--
STP14.4714.47--
Security and Fire Fighting19.319.3--
Sewerage System86.8521.71--
Sewerage system----
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage28.9514.47--
Street Lighting19.34.82--
Street lighting----
Water Supply System9.657.72--
under Ground water tank28.9517.37--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOOD / ENGINEERED WOOD / VITRIFIED TILES / STONE / MARBLE / GRANITE
WALL FINISHING DETAILSOBD / SEMI ACRYLIC / ACRYLIC EMULSION / VITRIFIED TILES
KITCHEN DETAILSLAMINATED WOOD / ENGINEERED WOOD / VITRIFIED TILES / STONE / MARBLE / GRANITE / VITROMITE / QUARTZ
BATHROOM FITTINGSREPUTED MAKE OF CP FITTINGS & SANITARY WARE
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESWOOD / MS / UPVC / AL / COMPOSITE MATERIAL
GLASS WORKFROSTED / CLEAR GLASS
ELECTRIC FITTINGSMODULAR / SWITCH BOX AND FITTINGS
CONDUCTING AND WIRING DETAILSPVC CONDUITS, FR WIRING
CUPBOARD DETAILSN/A
WATER STORAGEOHT / UGT WATER TANKS
LIFT DETAILSMITSUBISHI / SCHINDLER / KONE / OTIS / EQUIVALENT
EXTERNAL GLAZINGSMS / ALUMINIUM / UPVC / GLASS
WINDOWS/GLAZINGSMS / ALUMINIUM / UPVC / GLASS
DOORSMAIN DOOR INTERNAL DOORS
MAIN DOORSFIRE RESISTANT FLUSH DOOR
INTERNAL DOORSFLUSH DOOR
AIR CONDITIONINGN/A
ELECTRICAL FITTINGSSAME AS POINT 8
CNG PIPE LINEN/A
PROVISION OF WIFI AND BROADBAND FACILITYN/A
EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR PAINT
INTERNAL FINISHINGEMULSION PAINT

Unit-wise Specifications

TOILET
FLOORTILES / MARBLE / GRANITE
WALLSTILES / MARBLE / GRANITE
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
COUNTERSGRANITE STONE / VITRONITE / QUARTZ
SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
FIXTURESEXHAUST FAN
KITCHEN
FLOORTILES / MARBLE / GRANITE
WALLSTILES / MARBLE / GRANITE, OBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
COUNTERSGRANITE STONE / VITRONITE / QUARTZ
FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN
KITCHEN APPLIANCESN/A
SIT-OUTS
FLOORTILES
WALLS & CEILINGEXTERIOR PAINT
RAILINGSMS/SS/AL/GLASS (FINISHES AS PER DESIGN)
FIXTURESCEILING / WALL LIGHT
BED ROOMS
FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
WARDROBESN/A
MASTER TOILET
FLOORTILES / MARBLE / GRANITE
WALLSTILES / MARBLE / GRANITE
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
COUNTERSGRANITE STONE / VITRONITE / QUARTZ
SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC
FITTING/FIXTURESEXHAUST FAN
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
MODULAR WARDROBESN/A
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORLAMINATED WOOD / ENGINEERED WOOD / MARBLE / TILE
WALLSOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT / VITRIFIED TILES
CEILINGOBD / SEMI ACRYLIC / ACRYLIC EMULSION PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGOBD / SEMI ACRYLIC PAINT / TILES
TOILETCP FITTINGS, WASH BASIN, WC
BALCONYTILES / EXTERIOR PAINT

Fee Details

Payment 1
amount:2036000
cheque no:25066472008
draft date:07-03-2025
payable to:HRERA Gurugram
payee bank:SUMITOMO MITSUI BANKING CORPORATION (NEFT-UTR SMBCH25066472008)