NewActive

Vasant Square

Ghaziabad, Uttar Pradesh
01-06-2023
Launch Date
New
Type
31-05-2027
Completion Date

Overview

Launch Date

01-06-2023

Completion Date

31-05-2027

RERA ID

UPRERAPRJ879513

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)4102
Project NameVasant Square
Registration Fee (in Rs.)52000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-06-2023
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)7160
Proposed Completion Date31-05-2027

Location

Latitude

28.6468313

Longitude

77.2826423

Bank Details

Account Details
Name of the AccountFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-COLLECTION ACCOUNT
Account Number251111128122
Bank NameINDUSIND BANK
Branch NameINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeINDB0000171
Separate Account Details
Name of the AccountFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-SEPARATE ACCOUNT
Account Number252222228122
Bank NameINDUSIND BANK
Branch NameINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeINDB0000171
Transaction Account Details
Name of the AccountFASTECH DEVELOPERS LLP-FOR VASANT SQUARE PROJECT-SEPRATE ACCOUNT
Account Number250000028122
Bank NameINDUSIND BANK
Branch NameINDUSIND BANK, RAJ NAGAR, GHAZIABAD
Branch AddressRAJ NAGAR, GHAZIABAD
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeINDB0000171

Development Works

Demarcation of Plots

Property no. 80, situated at Mohalla Kallupura part of khasra no. 971, 972, 973 part of khasra no. 974 and part of khasra no. 975 Village Bhonja, now known as Vasant Chitra Mandir, situated at Nehru Nagar, Ghaziabad - 201001 area admeasuring 4102 sq. mtrs. has been demarcated and in the possession of the promoter.

Boundary Wall

2100 mm high boundary wall with 450 mm high brick and plaster wall and above 1650 mm high steel grill between two R.C.C column approx 4.5 meters center to center, as per architect drawing.

Road Work

All roads in the complex will be in combination of concrete pavers of different colors, shape and thickness.

Footpaths

All footpath in the complex will be in combination of concrete pavers of different colours, shape and thickness.

Water Supply Including Drinking Water Facilities

Potable water supply from underground collection tank and pumped to overhead water tank located at the top floor terrace. The supply of water shall be from the said overhead water tank.

Sewer System

The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading directly to the sewage line provided by the municipal corporation.

Drain

Rain water shall be collected in the drains connected to the underground cement concrete pipeline. For discharge, water will be collected in main hole to be constructed in periphery of complex and these main holes shall be finally connected with the drain of Ghaziabad Nagar Nigam.

Parks

The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the service / usage in the project.

Tree Planting

The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrances in the service / usage in the project.

Design For Electric Supply Including Street Lighting

Transformers shall be used along with necessary switch-gear for distributing electricity at LT voltage. All street / landscape lightning shall be LED based.

Community Buildings

Not Applicable

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided, Treated water shall be used for flushing, irrigation, carwash, pathway cleaning and excess water shall be discharged in to the municipal sewer as per site.

Solid Waste Management And Disposal System

Solid waste collection chamber proposed in each tower. Recyclable and non-recyclable waste will be disposed through a local approved agency.

Water Conservation System

Rain water harvesting facilities shall be provided and treated sewage water shall be recycled to the extent feasible.

Energy Management System Including Use of Renewable Energy

N.A

Fire Protection And Fire Safety System

Fire NOC UID no. UPFS/2022/57770/GZB/Ghaziabad/3798/JD and fire tender path shall be provided as per NBC. Fire fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from the fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable

Emergency Evacuation Services

Fire staircase has been provided as per approved drawing for evacuation.

Other Miscellaneous Work

Not Applicable

Documents

Extract of Khatauni

No: 1420-1425 | Date: -

Registry Document

No: Civil Suit No. 542/1999 | Date: 27-07-1999

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Affidavit

General body resolution for AoA (if Authorized Entity is AoA)

Notarized Affidavit for completion of balance development work

Other

Details of Encumbrances

Uploaded: 20-06-2023

Commencement Certificate

Uploaded: 29-05-2023

Other Plan(If Any)

Uploaded: 30-05-2023

Proforma of Application Form

Uploaded: 19-06-2023

Proforma of Allotment Letter

Uploaded: 31-05-2023

Proforma of Conveyance Deed

Uploaded: 19-06-2023

Waste Disposal Plan

Uploaded: 30-05-2023

Water Supply Plan

Uploaded: 30-05-2023

Electricity Supply Plan

Uploaded: 30-05-2023

Development Work Plan

Uploaded: 30-05-2023

Affidavit

Uploaded: 30-05-2023

CA CERTIFICATE

Uploaded: 30-05-2023

ARCHITECT CERTIFICATE

Uploaded: 30-05-2023

ENGINEERS CERTIFICATE

Uploaded: 30-05-2023

Other

Uploaded: 30-05-2023

Permits

Orignal Permit NoMultiplex/03442/GDA/BP/21-22/1487/16072022
Orignal Permit Date20-03-2023
Valid Upto19-03-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto19-03-2029
End Date31-05-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Fastech Projects Pvt. Ltd.
Contractor AddressSF-08, Second Floor, Cross River Mall, Karkardooma, Delhi-110092
Architect NameGian P. Mathur
Architect AddressC-55,East of Kailash, New Delhi-110065
Architect Licence NumberCA No. 80/5769
Structural Engineer NameAbha Gupta
Structural Engineer AddressC-55, East of Kailash, New Delhi-110065
Mobile number(Project Co-ordinator)9871963737

Land Details

AFS

Showing 1 blocks with 97 units

Property Summary

Total Carpet Area

4643.85 m²

49985.94 ft²

Total Units

112

2 different types

Blocks & Floors

1

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:41.46 m²
Balconies:0
Parking ratio:0.00 per unit

Block Vasant Square

97 units

Khasra Details

Total Area

4102.00 m²

44153.52 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No971,972,973, part of 974 and 975
Area(In Sq. Mt.)4102

Other Details

Contractor Name (if any)Fastech Projects Pvt. Ltd.
Contractor AddressSF-08, Second Floor, Cross River Mall, Karkardooma, Delhi-110092
Architect NameGian P. Mathur
Architect AddressC-55,East of Kailash, New Delhi-110065
Architect Licence NumberCA No. 80/5769
Structural Engineer NameAbha Gupta
Structural Engineer AddressC-55, East of Kailash, New Delhi-110065
Mobile number(Project Co-ordinator)9871963737