NEWActive

URBAN ASCENT

GURUGRAM, GURGAON
image
image
image
image
image
image
image
01-12-2024
Launch Date
NEW
Type
2031-11-30
Completion Date

Overview

Launch Date

01-12-2024

Completion Date

2031-11-30

Configurations

3 BHK, 4 BHK

Sizes

2165 - 3150 sq.ft.

Project Size

6 Buildings - 816 units

Total Floors

32

Launch Price

16500 /sq.ft

RERA ID

RERA-GRG-1813-2024

Basic Details

Project NameURBAN ASCENT
Project IDRERA-GRG-1813-2024
Project TypeNEW
Applicant TypeCompany
Submission Date01-12-2024 04:53:03 PM
Builder NameEMAAR INDIA LIMITED
CINU45201DL2005PLC133161
PANXXXX308B
Emailcoordination.in@emaar.ae
Websitehttps://in.emaar.com/en/
Phone (Mobile)9876888338
Phone (Landline)01244421155
Registered AddressEMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
Project AddressSECTOR 112, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Location

Emaar Urban Ascent Superimpose
Emaar Urban Ascent Superimpose

Drone Shots

Premium
Loading
Emaar Urban Ascent Drone Shot

Layout

Loading
Emaar Urban Ascent Layout
Emaar Urban Ascent Layout

Payment Plans

Loading
Emaar Urban Ascent Payment Plan
Emaar Urban Ascent Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1232 sq.ft
Built Up Area
N/A
Carpet Efficiency
57%
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameHSBC JMD REGENT SQUARE, DLF PHASE IL, GURGAON MEHRAULI ROAD, GURGAON
Account Number057122129905
IFSC CodeHSBC0110005
MICR Code110039005
Branch Code4761

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Rahul Bindle, Ashish Kumar bagri, Sanjeev Sharma, Madhuri Mehta, Rajeev Choudhary, Sujeet kumar, Himanshu Jain, Cheena Bhardwaj, Tanush Khandelwal, Mohit gupta, Riaz bari, Swapnil Gupta, Rahul Agarwal, Ankush Mittal, kalyan Chakrabarti, Sumil mathur, Jamal Majed Bin Theniyah, Haroon, Saeed Siddiqui, Emaar Business Park, Sector 28, Gurugram, Haryana
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Not specified

Development Details

Land Area9.164 (Acre)
Proposed FAR3.579
Permissible FAR3.579
Total Licensed Land10.744 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.38
CONSTRUCTION OF ROADS2.13
PAVEMENTS0
PARKS AND PLAYGROUNDS3.79
GREEN BELTS0
VEHICLE PARKINGS0.67
ELECTRICITY SUB-STATION0
CLUB HOUSE0.16
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.01
CONSTRUCTION0.63
AREA UNDER COMMERCIAL UNIT0.04
AREA UNDER GATE HOUSE OR GUARD ROOM0.004
AREA UNDER TOWER DROP OFFS0.250
AREA UNDER BOUNDARY WALL0.10
Total9.164

Cost Details

Land Cost67260.13 Lakhs
Other Cost38437.74 Lakhs
Estimated Project Cost238000 Lakhs
Estimated Infrastructure Cost5176.98 Lakhs
Estimated Apartment Construction Cost127125.15 Lakhs

Documents

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-11-2024

ENVIRONMENT CLEARANCE

Uploaded on: 30-11-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 30-11-2024

LOI

Uploaded on: 30-11-2024

COPY OF LICENSE RENEWAL

Uploaded on: 30-11-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-11-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 30-11-2024

ZONING PLAN

Uploaded on: 30-11-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-11-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-11-2024

DEMARCATION PLAN

Uploaded on: 30-11-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 30-11-2024

SEWERAGE LAYOUT

Uploaded on: 09-01-2025

REGISTRATION FEES DEMAND DRAFT

Uploaded on: 09-01-2025

SITE PLAN SERVICES

Uploaded on: 09-01-2025

ZONING PLAN

Uploaded on: 09-01-2025

FOREST NOC

Uploaded on: 09-01-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 09-01-2025

BASEMENT 02 SERVICES PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB FIRST FLOOR PLAN

Uploaded on: 09-01-2025

ELEVATION 1,2 ,3 TOWER E AND F 4BHK TYPE 5

Uploaded on: 09-01-2025

FIRST FLOOR PLAN AREA CALCULATION OF EWS AND SCHOOL

Uploaded on: 09-01-2025

OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER D AND F 4 BHK TYPE 4

Uploaded on: 09-01-2025

SECTIONS B B

Uploaded on: 09-01-2025

GROUND COVERAGE AREA CALCULATION AND STILT FLOOR AREA CALCULATION TOWER B 3BHK TYPE 3

Uploaded on: 09-01-2025

RAMP SECTIONS

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER C 3 BHK TYPE 3

Uploaded on: 09-01-2025

SITE PLAN ST01

Uploaded on: 09-01-2025

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 09-01-2025

CA CERTIFICATE COST & EXPENSE

Uploaded on: 09-01-2025

BASEMENT 01 PLAN

Uploaded on: 09-01-2025

BASEMENT 02 PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB ELEVATIONS

Uploaded on: 09-01-2025

ELEVATION 1,2 ,3 TOWER D AND F 4BHK SMALL

Uploaded on: 09-01-2025

GROUND COVERAGE AREA CALCULATION STILT FLOOR AREA CALCULATION TOWER F 4 BHK TYPE 4

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER B 3 BHK TYPE 3

Uploaded on: 09-01-2025

SITE PLAN ST06

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER A 3BHK TYPE 3

Uploaded on: 09-01-2025

TYPICAL FLOOR PLAN AND FAR CALCULATION TOWER F 4 BHK TYPE 4

Uploaded on: 09-01-2025

APPROVED BUILDING PLAN BR III

Uploaded on: 09-01-2025

ASSURANCE FOR DOMESTIC WATER SUPPLY

Uploaded on: 09-01-2025

BANK UNDERTAKING

Uploaded on: 09-01-2025

CASH FLOWS STATEMENT

Uploaded on: 09-01-2025

ENVIRONMENT CLEARANCE

Uploaded on: 09-01-2025

LICENSE RENEWAL

Uploaded on: 09-01-2025

MINING PERMISSION

Uploaded on: 09-01-2025

PERMISSIONTREECUTTING

Uploaded on: 09-01-2025

BUILDING SECTION TOWER D AND F 4BHK TYPE 4

Uploaded on: 09-01-2025

TERRACE FLOOR PLAN AREA CALCULATION

Uploaded on: 09-01-2025

TYPICAL FLOOR PLAN 2ND FLOOR TO 7TH FLOOR AND AREA CALCULATION OF UNIT TYPE 1 AND 2

Uploaded on: 09-01-2025

GROUND COVERAGE AREA CALCULATION AND STILT FLOOR AREA CALCULATION TOWER D 4BHK TYPE 4

Uploaded on: 09-01-2025

GROUND COVERAGE AREA CALCULATION STILT FLOOR FAR CALCULATION TOWER A 3BHK TYPE 3

Uploaded on: 09-01-2025

OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER C 3BHK TYPE 3

Uploaded on: 09-01-2025

SITE SECTION

Uploaded on: 09-01-2025

POWER ASSURANCE THE 88 DT

Uploaded on: 09-01-2025

SUPERIMPOSED SITE PLAN WITH SHIZRA

Uploaded on: 09-01-2025

URBAN ASCENT LICENSE

Uploaded on: 09-01-2025

AFFIDAVIT BANK ACCOUNT 42LD

Uploaded on: 09-01-2025

FIRE LAYOUT

Uploaded on: 09-01-2025

IRRGIATION LAYOUT

Uploaded on: 09-01-2025

STORM WATER LAYOUT

Uploaded on: 09-01-2025

WATER SUPPLY LAYOUT

Uploaded on: 09-01-2025

AKS SIZRA

Uploaded on: 09-01-2025

JAMABANDI

Uploaded on: 09-01-2025

MUTATION

Uploaded on: 09-01-2025

BASEMENT 01 AREA LINE DIAGRAM

Uploaded on: 09-01-2025

BASEMENT 01 SERVICES PLAN

Uploaded on: 09-01-2025

BASEMENT 02 AREA LINE DIAGRAM

Uploaded on: 09-01-2025

BUILDING SECTION TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB GROUND FLOOR PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB PODIUM GROUND FLOOR PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB PODIUM PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB SECOND FLOOR PLAN

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB SECTION

Uploaded on: 09-01-2025

COMMUNITY BUILDING 2 CLUB TERRACE FLOOR PLAN

Uploaded on: 09-01-2025

EWS ELEVATION A AND B

Uploaded on: 09-01-2025

EWS ELEVATION C AND D

Uploaded on: 09-01-2025

OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER E 4 BHK TYPE 5

Uploaded on: 09-01-2025

GROUND COVERAGE AREA CALCULATION AND STILT FLOOR FAR CALCULATION TOWER C 3BHK TYPE 3

Uploaded on: 09-01-2025

OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER B 3BHK TYPE 3

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER F 4BHK TYPE 4

Uploaded on: 09-01-2025

EWS SECTIONS A A

Uploaded on: 09-01-2025

GROUND COVERAGE CALCULATION AND STILT FLOOR AREA CALCULATION TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

GROUND FLOOR PLAN AND AREA CALCULATION OF SCHOOL AND EWS

Uploaded on: 09-01-2025

GROUND FLOOR PLAN AND GROUND COVERAGE AREA CALCULATION

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

TERRACE FLOOR PLAN TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

TYP FLOOR PLAN AND FAR CALCULATION TOWER E 4BHK TYPE 5

Uploaded on: 09-01-2025

BUILDING SECTION TOWER A B C 3 BHK TYPE 3

Uploaded on: 09-01-2025

ELEVATION 1 2 AND 3 TOWER A B C 3BHK TYPE 3

Uploaded on: 09-01-2025

OHT AND MACHINE ROOM PLAN AND ROOF PLAN TOWER A 3BHK TYPE 3

Uploaded on: 09-01-2025

PHASING PLAN

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER A 3 BHK TYPE 3

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER D 4 BHK TYPE 4

Uploaded on: 09-01-2025

REFUGE FLOOR PLAN AND FAR CALCULATION TOWER F 4 BHK TYPE 4

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER B 3BHK TYPE 3

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER C 3BHK TYPE 3

Uploaded on: 09-01-2025

STILT FLOOR PLAN TOWER D 4BHK TYPE 4

Uploaded on: 09-01-2025

TERRACE FLOOR PLAN TOWER A 3BHK TYPE 3

Uploaded on: 09-01-2025

TERRACE FLOOR PLAN TOWER B 3BHK TYPE 3

Uploaded on: 09-01-2025

TYPICAL FLOOR PLAN AND FAR CALCULATION TOWER D 4 BHK TYPE 4

Uploaded on: 09-01-2025

NON ENCUMBERANCE CERTIFICATE

Uploaded on: 10-02-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 24-01-2025

AAI NOC

Uploaded on: 10-02-2025

COLLABORATION AGREEMENTS

Uploaded on: 10-02-2025

CONSTRUCTION WATER NOC

Uploaded on: 10-02-2025

SITE PLAN GREEN AND SITE PLAN

Uploaded on: 10-02-2025

Statutory Approvals

LICENCE NO. 04 OF 2013Date: 18-02-2013Status: ALREADY BEEN OBTAINED
APPROVAL OF BUILDING PLAN BR-IIIDate: 29-11-2024Status: ALREADY BEEN OBTAINED
FOREST NOCDate: 23-07-2021Status: ALREADY BEEN OBTAINED
ENVIRONMENTAL CLEARANCEDate: 24-12-2013Status: ALREADY BEEN OBTAINED
AAI NOCDate: 02-08-2023Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUBSTATIONAS PER PROJECT REPORT
ELECTRIFICATION COSTAS PER PROJECT REPORT
GST LC ESCALATION CONTINGENCYAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT

NOC

ROADSProvider: CONNECTEDApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: GMDAApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

KUL BHUSHAN
Name
KUL BHUSHAN
PAN
XXXX308B
Email
coordination.IN@emaar.ae
Mobile
9876888338
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001

Managing Director/CEO

KALYAN CHAKRABARTI YANMENDRA
Name
KALYAN CHAKRABARTI YANMENDRA
PAN
XXXX883D
Email
Coordination.in@emaar.ae
Mobile
0124442115
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector 28 Gurugram Haryana

Directors

HAROON SAEED SIDDIQUI
Name
HAROON SAEED SIDDIQUI
PAN
XXXX308B
Email
coordination.in@emaar.ae
Mobile
9876888338
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001
JASON ASHOK KOTHARI
Name
JASON ASHOK KOTHARI
PAN
XXXX308B
Email
coordination.in@emaar.ae
Mobile
0124442115
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001
SHIVANI BHASIN
Name
SHIVANI BHASIN
PAN
XXXX308B
Email
coordination.in@emaar.ae
Mobile
0124442115
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001
ANIL HARISH
Name
ANIL HARISH
PAN
XXXX308B
Email
coordination.in@emaar.ae
Mobile
0124442115
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001
DR AHMED ABDUL RAHMAN ABDUL RAHMAN ALBANNA
Name
DR AHMED ABDUL RAHMAN ABDUL RAHMAN ALBANNA
PAN
XXXX308B
Email
coordination.in@emaar.ae
Mobile
0124442115
Landline
01244421155
Address
Emaar Business Park MG Road Sikanderpur Sector -28 Gurugram-122001

Contact Details

Project ContactEmail: coordination.in@emaar.aeMobile: 9876888338Landline: 01244421155
Project Contact PersonName: MANOJ SHARMAEmail: coordination.in@emaar.aeMobile: 9717776439Landline: 01244421155

Land Details

Land Area9.164 (Acre)
Proposed FAR3.579
Permissible FAR3.579
Total Licensed Land10.744 (Acre)

Land Usage

Land Cost67260.13 Lakhs
Other Cost38437.74 Lakhs
Estimated Project Cost238000 Lakhs
Estimated Infrastructure Cost5176.98 Lakhs
Estimated Apartment Construction Cost127125.15 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electrical sub station-28.5257.0517.11
Electricity Supply System-000
Electrification Cost-16.3332.679.8
Other-000
Parking-0--
Parks and Playgrounds-000
Rain water harvesting-4.689.352.81
Roads & Pavements-000
STP MEP PART-14.6929.388.82
Security and fire fighting-0--
Sewerage treatment & garbage disposal-000
Shopping area-000
Storm Water Drainage-000
Street Lighting-0--
Underground water tank-7.6915.384.61
Water Supply System-000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station28.5228.5228.5228.52
Electricity Supply System00035.21
Electrification Cost16.3316.3316.3316.33
Other0000
Parking---110.18
Parks and Playgrounds00035.73
Rain water harvesting6.559.354.684.68
Roads & Pavements30.5661.1218.3442.79
STP MEP PART20.5729.3814.6914.69
Security and fire fighting---27.52
Sewerage treatment & garbage disposal017.663.538.24
Shopping area0000
Storm Water Drainage010.962.195.11
Street Lighting---32.85
Underground water tank10.7615.387.697.69
Water Supply System095.6719.1344.65
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station28.5228.5228.5228.52
Electricity Supply System14.087.047.047.04
Electrification Cost16.3316.3316.3316.33
Other0000
Parking44.0722.0422.0422.04
Parks and Playgrounds14.297.157.157.15
Rain water harvesting4.684.684.684.68
Roads & Pavements61.1230.5630.5630.56
STP MEP PART14.6914.6914.6914.69
Security and fire fighting11.015.55.55.5
Sewerage treatment & garbage disposal11.785.895.895.89
Shopping area0000
Storm Water Drainage7.33.653.653.65
Street Lighting13.146.576.576.57
Underground water tank7.697.697.697.69
Water Supply System63.7831.8931.8931.89
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station28.5228.5228.5228.52
Electricity Supply System7.047.047.0418.31
Electrification Cost16.3316.3316.3316.33
Other0000
Parking22.0422.0422.0457.29
Parks and Playgrounds7.157.157.1518.58
Rain water harvesting12.169.353.742.81
Roads & Pavements30.5630.5630.5679.46
STP MEP PART38.229.3811.758.82
Security and fire fighting5.55.55.514.31
Sewerage treatment & garbage disposal5.895.895.8915.31
Shopping area0000
Storm Water Drainage3.653.653.659.5
Street Lighting6.576.576.5717.08
Underground water tank19.9915.386.154.61
Water Supply System31.8931.8931.8982.92
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station28.5228.5228.5239.93
Electricity Supply System14.085.634.227.04
Electrification Cost16.3316.3316.3322.87
Other0000
Parking44.0717.6313.2222.04
Parks and Playgrounds14.295.724.297.15
Rain water harvesting4.68000
Roads & Pavements61.1224.4518.3430.56
STP MEP PART14.69000
Security and fire fighting11.014.43.35.5
Sewerage treatment & garbage disposal11.784.713.535.89
Shopping area0000
Storm Water Drainage7.32.922.193.65
Street Lighting13.145.263.946.57
Underground water tank7.69000
Water Supply System63.7825.5119.1331.89

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES/MARBLE/WOODEN FLOORING
WALL FINISHING DETAILSTEXTURE PAINT / WHEATERSHIELD / OBD / SNOWSHEM OR EQUIVALENT
KITCHEN DETAILSSS OR INDIAN STANDARD
BATHROOM FITTINGSSS, INDIAN STANDARD
WOOD WORK ETCGOOD QUALITY, STANDARD MAKE
DOORS AND WINDOS FRAMESFLUSH DOOR, STANDARD MAKE
GLASS WORKGOOD QUALITY, STANDARD MAKE
ELECTRIC FITTINGSMODULAR SWITCHES
CONDUCTING AND WIRING DETAILSPVC CONDUIT,
CUPBOARD DETAILSMODULAR, STANDARD MAKE
WATER STORAGENA
LIFT DETAILS2/3/4 FLATS & LIFTS -3 NOS
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSALUMINIUM / UPVC
DOORSFLUSH DOOR
MAIN DOORSFLUSH DOOR
INTERNAL DOORSFLUSH DOOR
AIR CONDITIONINGSPLIT/VRV OR EQUIVALENT SYSTEM
ELECTRICAL FITTINGSLEGRAND / NORTHWEST/SCHNEIDER/HONEYWELL. ( MODELS WILL BE APPROVED IN CONSULTATION WITH ARCHITECT)
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYFTTH
EXTERNAL FINISHING/COLOUR SCHEMEGOOD QUALITY, STANDARD MAKE
INTERNAL FINISHINGGOOD QUALITY, STANDARD MAKE

Unit-wise Specifications

TOILET
FLOORTILES
WALLSTILES/ PAINT
CEILINGPAINT/FALSE CEILING
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESSS INDIAN STANDARD
KITCHEN
FLOORTILES
WALLSPAINT/TILES
CEILINGPAINT
COUNTERSNA
FIXTURESSS / INDIAN STANDARD
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORTILES
WALLS & CEILINGPAINT
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORTILES/WOODEN FLOORING
WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
WARDROBESNA
MASTER TOILET
FLOORTILES
WALLSTILES/ PAINT
CEILINGPAINT/FALSE CEILING
COUNTERSNA
SANITARY WARE/CP FITTINGSSS INDIAN STANDARD
FITTING/FIXTURESINDIAN STANDARD
MASTER BEDROOM/DRESSROOM
FLOORTILES/WOODEN FLOORING
WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
MODULAR WARDROBESE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES/MARBLE/WOODEN FLOORING
WALLSACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
CEILINGACRYLIC EMULSION/PLASTIC EMULSION/OBD/WHITE WASH OR EQUIVALENT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGPAINT
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:6686500
cheque no:824485
draft date:30-11-2024
payable to:HRERA Gurugram
payee bank:HSBC BANK
Payment 2
amount:7552500
cheque no:864275
draft date:18-12-2024
payable to:HRERA Gurugram
payee bank:HSBC BANK