NewActive

UNINAV UTOPIA

Ghaziabad, Uttar Pradesh
01-04-2023
Launch Date
New
Type
31-03-2027
Completion Date

Overview

Launch Date

01-04-2023

Completion Date

31-03-2027

RERA ID

UPRERAPRJ869140

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12554.10
Project NameUNINAV UTOPIA
Registration Fee (in Rs.)68000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-04-2023
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)9997
Proposed Completion Date31-03-2027

Location

Latitude

28.42418

Longitude

77.25317

Bank Details

Account no.50200078803154
Name Of Account HolderUNINAV DEVELOPERS PVT LTD SEPARATE A/C FOR UNINAV UTOPIA
Bank NameHDFC BANK LTD
Branch AddressRAJ NAGAR EXTENSION GHAZIABAD
Branch NameRAJ NAGAR EXTENSION
IFSC CodeHDFC0009481

Development Works

Demarcation of Plots

Covered by temporary sheets on the point given by the patwari

Boundary Wall

7ft height boundary wall of RCC wall/column and brick work as per drawings

Road Work

Cement Concrete Road over the subbase 200mm thick GSB+2 layer of WBM

Footpaths

75mm high from the road level with cc interlocking tiles over the subbase of 100mm thick P.C.C. and 50mm thick bed of fine sand.

Water Supply Including Drinking Water Facilities

water connection for the domestic uses will be provided be the concerned authority and storage will be done in under ground water tank of the capacity as per the norms

Sewer System

main sewer line has been designed as per norms and pvc pipe of 10kg pressure will be used in the vertical stags in the shafts, partially sewer line will be lay in basement ceiling and sill finally connect to STP.

Drain

underground pipeline drain will be lay in slops as per norms and collecting chambers as per the norms will be provide to collect the surface rain water.

Parks

Soft Landscape will be done in the park with sufficient electrical lightning

Tree Planting

tree plantation of the different variable of trees as per the site conditions are planned by follows the authority guidelines

Design For Electric Supply Including Street Lighting

M.S. street light designer poles with energy saving LED lightning fixtures will be used. partially light will be operated from the solar panel will installed on the terrace.

Community Buildings

Framed RCC Structure

Treatment and Disposal System of Sewage and Sullage water

STP will be installed as basement for treated the sewer and treated water will be recycled for use in flushing and gardening

Solid Waste Management And Disposal System

will be done be the external vendors by collecting the garbage from the dustbin/shops and segreggate the same for the recycling the dry waste and prepare the compost from the wet waste

Water Conservation System

rain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area

Energy Management System Including Use of Renewable Energy

solar panel will be installed on the terrace for the conservation if the electricity as per the norms of MOE

Fire Protection And Fire Safety System

system will be provide as per the fire department guidelines by fulfill the fire norms as per the NBCC

Social Infrastructure And Other Public Amenities Including Public Health Services

shall be provided as per building bye laws of Ghaziabad development authority

Emergency Evacuation Services

separate fire stair case is designed for evacuation service in the building

Other Miscellaneous Work

as per the requirement on period of time

Documents

Sale Deed

No: 8837 | Date: 04-08-2021

Extract of Khatauni

No: 1409-1432 | Date: -

Proforma of Completion Certificate(Occupancy)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 17-05-2023

Commencement Certificate

Uploaded: 01-06-2023

Other Plan(If Any)

Uploaded: 28-04-2023

Proforma of Application Form

Uploaded: 28-04-2023

Proforma of Allotment Letter

Uploaded: 28-04-2023

Proforma of Conveyance Deed

Uploaded: 28-04-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 01-06-2023

Waste Disposal Plan

Uploaded: 28-04-2023

Water Supply Plan

Uploaded: 28-04-2023

Electricity Supply Plan

Uploaded: 28-04-2023

Development Work Plan

Uploaded: 28-04-2023

Affidavit

Uploaded: 28-04-2023

CA CERTIFICATE

Uploaded: 02-05-2023

ARCHITECT CERTIFICATE

Uploaded: 02-05-2023

ENGINEERS CERTIFICATE

Uploaded: 02-05-2023

Other

Uploaded: 28-04-2023

Permits

Orignal Permit NoGroup Housing/03936/GDA/BP/21-22/1313/19102022
Orignal Permit Date17-11-2022
Valid Upto16-11-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto16-11-2027
End Date31-03-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)MAVI CONSTRUCTION-PRATAP MAVI
Contractor AddressPLOT NO. 1465, GROUND FLOOR, SECTOR-5, VASUNDHARA, GHAZIABAD, U.P.
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-244, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH
Architect Licence NumberCA/96/19503
Structural Engineer NameDR. GYAN SINGH- Y G CONSULTING AND ENGINEERS LLP
Structural Engineer AddressPLOT NO. 1088, FIRST FLOOR, NITIKHAND-1, INDIRAPURAM, GHAZIABAD-201014
Mobile number(Project Co-ordinator)9650099588

Land Details

AFS

Showing 23 blocks with 89 units

Property Summary

Total Carpet Area

20939.54 m²

225391.11 ft²

Total Units

160

4 different types

Blocks & Floors

23

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:130.87 m²
Balconies:214
Parking ratio:0.00 per unit

Block Commercial

6 units

Block Club/Community

5 units

Block Type-1/Tower-A/5 Nos.

1 units

Block Type-1/Tower-A-1

5 units

Block Type-1/Tower-A-2

5 units

Block Type-1/Tower-A-3

5 units

Block Type-1/Tower-A-4

5 units

Block Type-1/Tower-A-5

5 units

Block Type-1/Tower-B/2 Nos.

1 units

Block Type-1/Tower-B-1

1 units

Block Type-1A/Tower-B-1

4 units

Block Type-1/Tower-B-2

1 units

Block Type-1A/Tower-B-2

4 units

Block Type-1/Tower-C/5 Nos.

1 units

Block Type-1A/Tower-C1

4 units

Block Type-1/Tower-C2

5 units

Block Type-1/Tower-C3

5 units

Block Type-1/Tower-C4

5 units

Block Type-1/Tower-C5

5 units

Block Type-2/Tower-D/3 Nos

1 units

Block Type-2/Tower-D-1

5 units

Block Type-2/Tower-D-2

5 units

Block Type-2/Tower-D-3

5 units

Khasra Details

Total Area

12570.00 m²

135302.22 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No112
Area(In Sq. Mt.)12570

Other Details

Contractor Name (if any)MAVI CONSTRUCTION-PRATAP MAVI
Contractor AddressPLOT NO. 1465, GROUND FLOOR, SECTOR-5, VASUNDHARA, GHAZIABAD, U.P.
Architect NameANUJ AGARWAL ARCHITECTS
Architect AddressA-244, KAUSHAMBI, GHAZIABAD, UTTAR PRADESH
Architect Licence NumberCA/96/19503
Structural Engineer NameDR. GYAN SINGH- Y G CONSULTING AND ENGINEERS LLP
Structural Engineer AddressPLOT NO. 1088, FIRST FLOOR, NITIKHAND-1, INDIRAPURAM, GHAZIABAD-201014
Mobile number(Project Co-ordinator)9650099588