Launch Date
Completion Date
RERA ID
28.41570
77.24202
Khasra No. 254, 259, 260, 261, 262, 263, 264, 265, 266, 306, 307, 354, 355, 356, 357, 358, 373, 374, 377 Village Noor Nagar, Raj Nagar Extension, Ghaziabad, U.P. Total Plot Area 27262.45 Sq.Mtr. Demarcation points given by patwari.
Well Defined Plot Boundaries proposed to ensure the security and privacy of the project. development of the boundary wall (230 mm thick concrete wall with minimum height of 2.1 mtr
All roads in the complex will be in M25 grade concrete. roads will be laid over 225 mm water bound macadam
Development of pathways for smooth pedestrian movement use of 60 mm to 80 mm thick brick type concrete/grass pavers ad per design.
installation of water supply system to ensure a steady and safe domestic water supply, including provisions for landscape water requirements. the supply of water to individual flat shall be from the said overhead water tanks. underground and overhead water tanks with automatic pumps for 24 hours water supply
sewer system to collect waste water generated with the project premises including treatment and dispose of waste water/sewage. use of pipe having dia 110 mm to 150 mm with adequate numbers of inspection chambers and man-holes based upon the design and site requirements.
Drainage System within the site to manage surface water and storm water flow . in the drainage system of the project, use of pipe having dia of 110 mm to 200 mm and open drains with adequate numbers of inspection chambers and man-holes based the design and site requirements.
Development of landscape areas including green/open spaces/recreational areas/tot-lots plantation of shrubs besides planting natural grass, landscape features etc., use of electrical poles having height upto 4 mtr in landscape areas
one tree for every 80 sq.mtr of land needs to be planted within construction sites for residential building, ensuring 10 percent green cover for total area. the tree will be planted at all suitable locations of the project and along the boundary walls
Electric supply provided through 33/0.415 KV transformers and by DG Set supply for backup. use of electrical poles, as per design and site requirements with LED Lights.
Community building of the project has been proposed in the society having various activities halls, meeting rooms, gym, games, kids play area, yoga etc., details of the same are given in approved plans
STP will be installed at basement for treated the sewer and treated water will be recycled for use in flushing and gardening
Solid wastes to be collected form individual flats and stored in garbage room in the complex. recyclable shall be processed in the compost machine to make compost. non recyclable waste shall be disposed of through approved agents
rain water harvesting pits has been plan in the open area for recharge the ground water by collect the rain water from terrace and road surface area
The main power supply will be through HT power connection, stepped down by transformer and then distributed. DG backup of suitable rating will be provided. the campus light will be a combination of solar lights and grid supplied power. the light fittings will be power saving LED fittings.
fire fighting system shall be provided for buildings as per the prevailing requirements of NBC. sprinkler shall be provided in common areas. water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
Not Applicable
Fire Stair Case shall be provided as per the approvals fire drawing for evacuation to open areas.
as per the requirement on period of time
Showing 9 blocks with 292 units
Total Carpet Area
73039.46 m²
786189.44 ft²
Total Units
680
6 different types
Blocks & Floors
9
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
27575.09 m²
296815.51 ft²