Khasra No. 375, 376, Village Sikri Khurd, main Road, Umesh Park, Modinagar, Ghaziabad, U.P. Total Plot Area = 7610.86 square meters.
2.1 m high boundary wall with 1.8m high brick work and 0.60m highmild steel grill between two R.C.C. columns approx. 4.5m center to center. The boundary wall shall be earthquake resistant.
All roads in the complex will be in M25 grade concrete. Roads will be laid over 225 mm water bound macadam.
All footpaths in the complex will in combination of concrete pavers of difference colors, shape and thickness of 60mm and 90 mm laid over 150 mm water bound macadam surface.
Potable water supply from GDA shall be collected in underground collection tank and pumped to overhead water tank located at the terrace. The supply of water to individual flats shall be from the said overhead water tanks. Underground and overhead water tank with automatic pumps for 24 hours water supply.
The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plan (STP) of the project, from where the sewage will be used for irrigation and flushing purpose.
Rain water shall be collected in drains having a minimum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in periphery of complex, and these manholes shall be finally connected with drain of GDA.
Lush green landscaped internal park will be provided and maintained. The landscaped parks will have jogging tracks, Pavilion, children play area and sitting area. The total area in the project will be 1143 sqm. (15 percent of the total plot area)
One tree for every 80 sqm of land needs to be planted within construction sites for both residential buildings, ensuring 10 percent green cover for every plot. The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Electric supply provided through 33/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
Not Applicable
Sewage shall be treated in sewage Treatment plan (STP) and thereafter treated water to be used for flushing and irrigation
Solid waster to be collected from individual flats and stored in garbage room in the basement. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents of GDA.
Rain water harvesting pits shall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
The main power supply will be through HT power connection, stepped down by transformer and then distributed. DG backup of suitable rating will be provided. The campus lighting will be a combination of solar lights and grid supplied power. The light fittings will be power saving LED fittings.
Fire fighting system will be provided for all buildings as per the prevailing requirement of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartments. Smoke detecters, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
Not Applicable
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Not applicable
Showing 2 blocks with 114 units
Total Carpet Area
8061.92 m²
86777.70 ft²
Total Units
114
2 different types
Blocks & Floors
2
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7611.00 m²
81924.04 ft²