Launch Date
Completion Date
RERA ID
28.6603
77.4962
Plots demarcated as per Approved Layout and Boundary Wall shall be built around the plot.
Boundary Wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m.
Width (m) Carriage way (m) footpath (m) GSB (mm) WMM (mm) 7.5 7.5 - 150 100 9.0 9.0 - 150 100 18 9.0 9.0 150 100
Width (m) Width of footpath (m) GSB (mm) 7.5 - 2.5 9 - 75 18 3.0 75
The Water supply system planned to provide 24 x 7 Water Supply. HDPE pipe PN-8, PE-80 for Water Supply network. 75 KL RCC storage tanks (75KL UGT and 150KL OHT). 1 Tube-wells.
RCC pipe class NP2 has been proposed. Manholes /Chambers made with Brick Masonry in Conical shape ranging from dia 900mm to 1500mm.
RCC pipe class NP2 has been used Manholes / Chambers made with Brick Masonry in Conical shape with dia 900mm.
Wire fencing along Boundary, Grassing and Tree Plantation.
One tree on one side of 9m road. Both side trees on 12m and 18m road.
Compact substation 2000 KVA - 1nos. 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street light poles with 75 watt cast iron LED fixture. Feeder panels -6 way, 8 way and 12 way.
NA.
130 KLD STP with MBBR Technology is planned within the premise.
Door to Door Collection shall be ensured from each household. Segregation waste treatment facility at Sec-6. Organic waste is composted with the help of Automatic organic waste converter machine.
1Nos. Modular type rain water harvesting pits planned in green areas of the proposed development.
Use of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. Installation of Solar Hot water system to meet hot water requirement in kitchen. Energy Metering to regulate the usage of electricity. Efficient equipments like Motors, Pumps, Air Conditions, Lifts, etc. Zero use of Hydro-chloroflurocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s). Use of halon free fire suppression equipment.
Fire staircase and FHC , is planned at each floor as per NBC requirement.
NA.
Fire staircase Planned as per NBC requirement.
NA.
Showing 2 blocks with 10 units
Total Carpet Area
36939.76 m²
397615.88 ft²
Total Units
220
2 different types
Blocks & Floors
2
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
26010.00 m²
279969.04 ft²