Launch Date
Completion Date
RERA ID
28.6603
77.4962
Plots demarcated as per Approved layout of building plan.
Boundary wall shall be made with standard Fly Ash Brick and MS Grill with Thickness of 230mm and height 1.8m
Width (m) Width of Carriage way(m) Width of footpath (m) GSB (mm) WMM (mm) Interlocking tiles over sand bed (mm) 9.0 9.0 - 150 100 65 12.0 12.0 - 150 100 65 Note -Cross sections are enclosed as Annexure
Width (m) Width of footpath (m) GSB(mm) Interlocking tiles over sand bed (mm) 9.0 - 2.5 60 12.0 - 75 60
1.) The Water supply System planned to provide 24 X 7 Water supply. 2.) HDPE pipe PN-8, PE-80 for water supply network. 3.) 4 X 105 KL RCC storage tanks ( 4 X 105 KL UGT) 4.) 1Tube-Wells
1.) RCC pipe class NP2 has been proposed. 2.) Manholes/Chambers made with Brick Masonry in Conical Shape ranging from dia 900mm to 1500 mm
1.) RCC pipe class NP2 has been used 2.) Manholes/Chambers made with Brick Masonry in Conical Shape with dia 900mm
NA
1.) One tree on side of 9m Road and 7.5 road. 2.) Both side trees on 12m and 18 m road
1.) Compact Substation 2000 KVA -1Nos 2.) 5m cast Iron pole with GI Ribbed/Grooved extrusion and single arm bracket street poles with 55watt cast Iron LED Fixture. 3.) Feeder panels-6 way, 8way and 12way.
NA
550KLD STP with MBBR Technology is planned within the premise.
1.) Door to Door Collection shall be ensured from each household. 2.) Segregation waste treatment Facility at Sector-6 3.) Organic Waste is Composted with the help of Automatic organic waste converter machine.
1 Nos. Modular type rain water harvesting pits planned in green areas of the proposed development.
1.)Use LED lights with Solar LPD"s (Light Power Density) when Compared to baseline set by ECBC 2.)Installation Solar PV cells as required capacity synched with power supply Internal grid are being Proposed to meet requirements of EIA authorities. 3.) Energy Metering to regulate the usage of electricity 4.)Efficient equipments like Motors, Pumps, Ac, LIfts etc. 5.)Zero use of Hydro-chlorofluorocarbon (HCFC) refrigents in (HVAC) equipments and Unitary Air -Conditioner Installed in the buildings 6.) Use of halon free fire Suppression equipment
Fire Stair cases and FHC, is planned at each floor as per NBC Requirement.
NA
Fire Staircases Planned as per NBC requirement
NA
Showing 1 blocks with 5 units
Total Carpet Area
23499.56 m²
252946.91 ft²
Total Units
140
2 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
14490.00 m²
155968.91 ft²