NewActive

UCHDPL-VERIDIA-6-OAKWOOD ENCLAVE

Ghaziabad, Uttar Pradesh
01-10-2023
Launch Date
New
Type
28-12-2025
Completion Date

Overview

Launch Date

01-10-2023

Completion Date

28-12-2025

RERA ID

UPRERAPRJ196239

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)15827
Project NameUCHDPL-VERIDIA-6-OAKWOOD ENCLAVE
Registration Fee (in Rs.)84500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)27
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-10-2023
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)14591
Proposed Completion Date28-12-2025

Location

Latitude

28.6603

Longitude

77.4962

Bank Details

Account Details
Name of the AccountUCHDPL COLLECTION ACCOUNT FOR VERIDIA 6 OAKWOOD ENCLAVE
Account Number923020044725237
Bank NameAXIS BANK LTD.
Branch NameAXIS BANK LTD, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD
Branch AddressPLOT NO. 3, N-30, AMBEDKAR ROAD, NEHRU NAGAR,GHAZIABAD-201001-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095
Separate Account Details
Name of the AccountUCHDPL SEPARATE BANK ACCOUNT FOR VERIDIA 6 OAKWOOD ENCLAVE
Account Number923020044734749
Bank NameAXIS BANK LTD.
Branch NameAXIS BANK LTD, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD
Branch AddressPLOT NO.-3, N-30,AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD-201001-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095
Transaction Account Details
Name of the AccountUCHDPL TRANSACTION AACOUNT VERIDIA 6 OAKWOOD ENCLAVE
Account Number923020044774954
Bank NameAXIS BANK LTD.
Branch NameAXIS BANK LTD, AMBEDKAR ROAD NEHRU NAGAR, GHAZIABAD
Branch AddressPLOT NO.- 3, N-30, AMBEDKAR ROAD, NEHRU NAGAR, GHAZIABAD-201001-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095

Development Works

Demarcation of Plots

Plots Demarcated as per Approved layout of Building Plan.

Boundary Wall

Boundary wall shall be made with standard Fly ash Brick and MS Grill with thickness of 230mm and height 1.8m

Road Work

Width (M) Width of Carriage way (M) GSB(MM) WMM(MM) Interlocking Tiles over sand Bed(MM) 9.0 9.0 150 100 65 12.0 12.0 150 100 65 Note - Cross sections are enclosed as Annexure

Footpaths

Width(M) GSB(MM) Interlocking tiles Over sand Bed (MM) 9.0 2.5 60 12.0 75 60

Water Supply Including Drinking Water Facilities

1.) The Water Supply system planned to provide 24 X 7 Water Supply. 2.) HDPE Pipe PN-8, PE-80, For Water Supply network 3.) 4 X 105KL RCC Storage Tanks ( 4 X 105 KL UGT) 4.) 1 Tube- Wells

Sewer System

1.) RCC Pipe Class NP2 has been Proposed 2.) Manholes / Chambers made with Masonry in Conical Shape ranging from dia 900 to 1500 mm

Drain

1.) RCC Pipe class NP2 has been used 2.) Manholes/ Chambers made with Masonry in Conical Shape with dia 900 mm

Parks

Not applicable

Tree Planting

1.) One tree On One side of 9 m road and 7.5 road 2.) Both side Trees on 12m and 18m road

Design For Electric Supply Including Street Lighting

1.) Compact Substation 2000 KVA -1 Nos 2.) 5m Cast Iron Pole with GI ribbed/Grooved extrusion and single arm bracket street light poles with 50 watt cast Iron LED Fixtures 3.) Feeder Panels-6 way, 8 way ,and 12 way

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

550 KLD STP with MBBR Technology is planned within the premise.

Solid Waste Management And Disposal System

1.) Door to Door collection shall be ensured from each household. 2.) Segregation waste treatment facility at sector -6 3.) Organic Waste is composted with the help of automatic organic waste converter machine.

Water Conservation System

1 nos. Modular Type rain water harvesting pits planned in green areas of the proposed development

Energy Management System Including Use of Renewable Energy

1.) Use of LED Lights with Lower LPD"s (Lighting Power Density) when compared to baseline set by ECBC 2.) Installation Sloar PV Cells as required capacity Synched with power supply Internal Grid are being Proposed To meet requirements of EIA Authorities. 3.)Energy Metering To Regulate the usage of electricity 4.)Efficient Equipment like Motors, Pumps, Ac"s, Lifts etc. 5.)Zero use of Hydro-Chlorofluorocarbon(HCFC) refrigerants in (HVAC) equipment and Unitary Air- conditioner Installed in the Buildings. 6.) Use of Halon Free fire suppression equipment

Fire Protection And Fire Safety System

Fire Staircases and FHC, is planned at each floor as per NBC requirements

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircase planned as per NBC Requiremnets

Other Miscellaneous Work

NA

Documents

Lease Deed

No: AT780410 | Date: 03-10-2011

Extract of Khatauni

No: 1426-1431(01/07/2018 -30/06/2024) | Date: -

Allotment Letter issued by Competent Authority

No: GDA/BP/20-21/0441 | Date: 29-12-2020

Allotment Letter issued by Competent Authority

No: GDA/BP/20-21/0441 | Date: 29-12-2020

Allotment Letter issued by Competent Authority

No: GDA/BP/20-21/0441 | Date: 29-12-2020

Allotment Letter issued by Competent Authority

No: GDA/BP/20-21/0441 | Date: 29-12-2020

Allotment Letter issued by Competent Authority

No: GDA/BP/20-21/0441 | Date: 29-12-2020

Other

Details of Encumbrances

Uploaded: 24-08-2023

Commencement Certificate

Uploaded: 24-08-2023

Other Plan(If Any)

Uploaded: 24-08-2023

Proforma of Application Form

Uploaded: 24-08-2023

Proforma of Allotment Letter

Uploaded: 24-08-2023

Proforma of Conveyance Deed

Uploaded: 24-08-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 24-08-2023

Waste Disposal Plan

Uploaded: 24-08-2023

Water Supply Plan

Uploaded: 24-08-2023

Electricity Supply Plan

Uploaded: 24-08-2023

Development Work Plan

Uploaded: 24-08-2023

Affidavit

Uploaded: 03-11-2023

CA CERTIFICATE

Uploaded: 01-11-2023

ARCHITECT CERTIFICATE

Uploaded: 24-08-2023

ENGINEERS CERTIFICATE

Uploaded: 29-08-2023

Other

Uploaded: 20-09-2023

Permits

Orignal Permit NoGDA/BP/20-21/0441
Orignal Permit Date29-12-2020
Valid Upto28-12-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto27-12-2028
End Date28-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Modern Construction Co. India
Contractor AddressFirst Floor F-2,C 103/F2, DLF Dilshad Extension 2, Sahibabad, Uttar Pardesh-201005
Architect NameNiraj Kumar Nanda
Architect AddressC-1, Sector-3, Noida-201301
Architect Licence NumberCA/2009/46122
Structural Engineer NameDr. Rajeev Dua
Structural Engineer Address202 and 203 Himland House, Commercial Complex, Karampura, New Delhi -110015
Mobile number(Project Co-ordinator)9873098408

Land Details

AFS

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

23499.56

252946.91 ft²

Total Units

140

2 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:167.85
Balconies:16
Parking ratio:0.00 per unit

Block TOWER-6

5 units

Khasra Details

Total Area

15827.00

170360.25 ft²

16 plots
Khasra
TypeKhasra
Khasra/Plot No256
Area(In Sq. Mt.)1154.11
Khasra
TypeKhasra
Khasra/Plot No247
Area(In Sq. Mt.)921.78
Khasra
TypeKhasra
Khasra/Plot No250
Area(In Sq. Mt.)520
Khasra
TypeKhasra
Khasra/Plot No249
Area(In Sq. Mt.)317
Khasra
TypeKhasra
Khasra/Plot No258
Area(In Sq. Mt.)801.88
Khasra
TypeKhasra
Khasra/Plot No259
Area(In Sq. Mt.)786
Khasra
TypeKhasra
Khasra/Plot No260
Area(In Sq. Mt.)1333.67
Khasra
TypeKhasra
Khasra/Plot No243
Area(In Sq. Mt.)117.90
Khasra
TypeKhasra
Khasra/Plot No242
Area(In Sq. Mt.)23.78
Khasra
TypeKhasra
Khasra/Plot No251
Area(In Sq. Mt.)1463.14
Khasra
TypeKhasra
Khasra/Plot No252
Area(In Sq. Mt.)1548.37
Khasra
TypeKhasra
Khasra/Plot No246
Area(In Sq. Mt.)1647.51
Khasra
TypeKhasra
Khasra/Plot No254
Area(In Sq. Mt.)836.88
Khasra
TypeKhasra
Khasra/Plot No263
Area(In Sq. Mt.)143.68
Khasra
TypeKhasra
Khasra/Plot No265
Area(In Sq. Mt.)2761.99
Khasra
TypeKhasra
Khasra/Plot No253
Area(In Sq. Mt.)1449.31

Other Details

Contractor Name (if any)Modern Construction Co. India
Contractor AddressFirst Floor F-2,C 103/F2, DLF Dilshad Extension 2, Sahibabad, Uttar Pardesh-201005
Architect NameNiraj Kumar Nanda
Architect AddressC-1, Sector-3, Noida-201301
Architect Licence NumberCA/2009/46122
Structural Engineer NameDr. Rajeev Dua
Structural Engineer Address202 and 203 Himland House, Commercial Complex, Karampura, New Delhi -110015
Mobile number(Project Co-ordinator)9873098408