Launch Date
Completion Date
RERA ID
28.6603
77.4962
Plots Demarcated as per Approved layout of Building Plan.
Boundary wall shall be made with standard Fly ash Brick and MS Grill with thickness of 230mm and height 1.8m
Width (M) Width of Carriage way (M) GSB(MM) WMM(MM) Interlocking Tiles over sand Bed(MM) 9.0 9.0 150 100 65 12.0 12.0 150 100 65 Note - Cross sections are enclosed as Annexure
Width(M) GSB(MM) Interlocking tiles Over sand Bed (MM) 9.0 2.5 60 12.0 75 60
1.) The Water Supply system planned to provide 24 X 7 Water Supply. 2.) HDPE Pipe PN-8, PE-80, For Water Supply network 3.) 4 X 105KL RCC Storage Tanks ( 4 X 105 KL UGT) 4.) 1 Tube- Wells
1.) RCC Pipe Class NP2 has been Proposed 2.) Manholes / Chambers made with Masonry in Conical Shape ranging from dia 900 to 1500 mm
1.) RCC Pipe class NP2 has been used 2.) Manholes/ Chambers made with Masonry in Conical Shape with dia 900 mm
Not applicable
1.) One tree On One side of 9 m road and 7.5 road 2.) Both side Trees on 12m and 18m road
1.) Compact Substation 2000 KVA -1 Nos 2.) 5m Cast Iron Pole with GI ribbed/Grooved extrusion and single arm bracket street light poles with 50 watt cast Iron LED Fixtures 3.) Feeder Panels-6 way, 8 way ,and 12 way
NA
550 KLD STP with MBBR Technology is planned within the premise.
1.) Door to Door collection shall be ensured from each household. 2.) Segregation waste treatment facility at sector -6 3.) Organic Waste is composted with the help of automatic organic waste converter machine.
1 nos. Modular Type rain water harvesting pits planned in green areas of the proposed development
1.) Use of LED Lights with Lower LPD"s (Lighting Power Density) when compared to baseline set by ECBC 2.) Installation Sloar PV Cells as required capacity Synched with power supply Internal Grid are being Proposed To meet requirements of EIA Authorities. 3.)Energy Metering To Regulate the usage of electricity 4.)Efficient Equipment like Motors, Pumps, Ac"s, Lifts etc. 5.)Zero use of Hydro-Chlorofluorocarbon(HCFC) refrigerants in (HVAC) equipment and Unitary Air- conditioner Installed in the Buildings. 6.) Use of Halon Free fire suppression equipment
Fire Staircases and FHC, is planned at each floor as per NBC requirements
NA
Fire Staircase planned as per NBC Requiremnets
NA
Showing 1 blocks with 5 units
Total Carpet Area
23499.56 m²
252946.91 ft²
Total Units
140
2 different types
Blocks & Floors
1
5 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15827.00 m²
170360.25 ft²