UCHDPL-VERIDIA-4-OAKWOOD ENCLAVE

Ghaziabad, Uttar Pradesh
16-08-2022
Launch Date
New
Type
28-12-2025
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

28-12-2025

RERA ID

UPRERAPRJ865343

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)15768
Project NameUCHDPL-VERIDIA-4-OAKWOOD ENCLAVE
Registration Fee (in Rs.)84000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)41
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date16-08-2022
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)16634
Proposed Completion Date28-12-2025

Location

Latitude

28.6603

Longitude

77.4962

Bank Details

Account Details
Name of the AccountUCHDPL COLLECTION ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVE
Account Number922020036743608
Bank NameAXIS BANK LTD.
Branch NameNEHRU NAGAR, GHAZIABAD
Branch AddressPLOT-3, N, N30 AMBEDKAR ROAD NEHRU NAGAR, GHAZIABAD-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095
Separate Account Details
Name of the AccountUCHDPL SEPARATE BANK ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVE
Account Number922020036763259
Bank NameAXIS BANK LTD.
Branch NameNEHRU GANAR, GHAZIABAD
Branch AddressPLOT NO-3, N, N-30 AMBEDKAR ROAD NEHRU NAGAR GHAZIABAD-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095
Transaction Account Details
Name of the AccountUCHDPL TRANSACTION ACCOUNT FOR VERIDIA 4 OAKWOOD ENCLAVE
Account Number922020038514556
Bank NameAXIS BANK LTD.
Branch NameNEHRU NAGAR, GHAZIABAD
Branch AddressPLOT NO-3 N, N-30 AMBEDKAR ROAD NEHRU NAGAR GHAZIABAD-UP
Branch StateUttar Pradesh
Branch DistrictGhaziabad
IFSC CodeUTIB0000095

Development Works

Demarcation of Plots

Plots demarcated as per Approved Layout of Building Plan.

Boundary Wall

Boundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m.

Road Work

Width (m) Width of Carriage way (m) GSB (mm) WMM (mm) interlocking tiles over sand bed (mm) 9.0 9.0 150 100 65 12.0 12.0 150 100 65

Footpaths

Width (m) Width of footpath (m) GSB (mm) Interlocking tiles over sand bed (mm) 9.0 - 2.5 60 12.0 - 75 60

Water Supply Including Drinking Water Facilities

1) The Water Supply system planned to provide 24 X7 Water Supply 2) HDPE pipe PN-8, PE-80 for Water Supply networks 3) 4x105 KL RCC storage tanks (4x105 KL UGT) 4, 1 Tube-wells

Sewer System

1) RCC pipe class NP2 has been proposed 2) Manhole/Chambers made with Brick Masonry in Conical Shape ranging from dia 900 to 1500mm

Drain

1) RCC pipe class NP2 has been used 2) Manhole/Chambers made with Brick Masonry in Conical shape with dia 900mm

Parks

Not Applicable

Tree Planting

1) One Tree on one side of 9m road and 7.5m road

Design For Electric Supply Including Street Lighting

1) Compact substation 2000 KVA - 1Nos 2) 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street Light Poles with 55 watt cast iron LED fixture. 3) Feeder panels-6 way 8 way and 12 way.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

550 KLD STP with MBBR Technology is planned within the premise.

Solid Waste Management And Disposal System

1) Door to Door Collection shall be ensured from each household. 2) Segregation waste treatment facility at Sec-6. 3) Organic waste is composted with the help of Automatic organic waste Converter Machine.

Water Conservation System

1Nos. Modular type rain water harvesting pits planned in Green areas of the proposed development.

Energy Management System Including Use of Renewable Energy

1) Use LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. 2) Installation solar PV cells as required capacity synched with power supply internal grid are being proposed to meet requirement of EIA Authorities. 3) Energy Metering to regulate the usage of Electricity. 4) Efficient Equipment like Motors, Pump, ACs, Lifts, etc. 5) Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC equipment unitary air-conditioners installed in the buildings. 6) Use of halon free fire suppression equipment.

Fire Protection And Fire Safety System

Fire Staircases and FHC is planned at each floor as per NBC requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircases Planned as per NBC requirement.

Other Miscellaneous Work

NA

Documents

Extract of Khatauni

No: 1426-1431 | Date: -

Lease Deed

No: P174003 | Date: 18-06-2010

Details of Encumbrances

Details of Encumbrances

Uploaded: 16-09-2022

Commencement Certificate

Uploaded: 26-08-2022

Other Plan(If Any)

Uploaded: 26-08-2022

Proforma of Application Form

Uploaded: 26-08-2022

Proforma of Allotment Letter

Uploaded: 26-08-2022

Proforma of Conveyance Deed

Uploaded: 26-08-2022

Proforma of Completion Certificate(Occupancy)

Uploaded: 26-08-2022

Waste Disposal Plan

Uploaded: 23-09-2022

Water Supply Plan

Uploaded: 23-09-2022

Electricity Supply Plan

Uploaded: 23-09-2022

Development Work Plan

Uploaded: 26-08-2022

Affidavit

Uploaded: 26-08-2022

CA CERTIFICATE

Uploaded: 16-09-2022

ARCHITECT CERTIFICATE

Uploaded: 26-08-2022

ENGINEERS CERTIFICATE

Uploaded: 26-08-2022

Other

Uploaded: 16-09-2022

Permits

Orignal Permit NoGDA/BP/20-21/0441
Orignal Permit Date29-12-2020
Valid Upto28-12-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto27-12-2028
End Date28-12-2025
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Modern Construction Co. India
Contractor AddressFirst Floor F-2, C 103/F2, DLF Dilshad Extension 2, Sahibabad, Uttar Pradesh-201005, India
Architect NameNiraj Kumar Nanda
Architect AddressCosmos Sector-134, Noida
Architect Licence NumberCA/2009/46122
Structural Engineer NameDr. Rajeev Dua
Structural Engineer Address202 and 203 Himland House, Commercial Complex, Karampura, New Delhi-110015
Mobile number(Project Co-ordinator)9871295972

Land Details

AFS

Showing 1 blocks with 5 units

Property Summary

Total Carpet Area

26856.64

289082.19 ft²

Total Units

160

2 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:167.85
Balconies:16
Parking ratio:0.00 per unit

Block Tower-4

5 units

Khasra Details

Total Area

15767.85

169723.56 ft²

6 plots
Khasra
TypeKhasra
Khasra/Plot No234
Area(In Sq. Mt.)9331.72
Khasra
TypeKhasra
Khasra/Plot No235
Area(In Sq. Mt.)3859.59
Khasra
TypeKhasra
Khasra/Plot No237
Area(In Sq. Mt.)1298.06
Khasra
TypeKhasra
Khasra/Plot No238
Area(In Sq. Mt.)102.6
Khasra
TypeKhasra
Khasra/Plot No239
Area(In Sq. Mt.)1107.13
Khasra
TypeKhasra
Khasra/Plot No241
Area(In Sq. Mt.)68.75

Other Details

Contractor Name (if any)Modern Construction Co. India
Contractor AddressFirst Floor F-2, C 103/F2, DLF Dilshad Extension 2, Sahibabad, Uttar Pradesh-201005, India
Architect NameNiraj Kumar Nanda
Architect AddressCosmos Sector-134, Noida
Architect Licence NumberCA/2009/46122
Structural Engineer NameDr. Rajeev Dua
Structural Engineer Address202 and 203 Himland House, Commercial Complex, Karampura, New Delhi-110015
Mobile number(Project Co-ordinator)9871295972