Size, shape and orientation is demarcated as per Layout approved by Ghaziabad Development Authority vide its letter 258/MP/Z-5/19 dated 29/05/2019. A concrete pillar of size 100x100x600mm at four corners of each plot is installed
Boundary wall shall be constructed with following criteria Width 230mm, Length 765m, height 1.8m made with standard brick with MS Grill
Roads as per IRC Norms with following Details Width(m)Length(m)Carriageway(m)footpah(m)GSB(mm)WMM (mm)SDBC (mm) 9 m 341 5 4 150 100 30 12 m 2800 6 6 150 100 30 15 m 74 7.5 7 150 100 30
Footpaths as per following Details Footpath Width(m) Length (m) footpah (m)GSB (mm) Interlocking tiles over sand bed 9 m 682 4 75 60 12 m 5600 6 75 60 15 m 148 7 75 60
4825 m long distribution pipe network has been laid for 24 x 7 water supply. HDPE pipe PN-6, PE-80 has been used. 1600 KL storage (800KL UGT and 800 KL OHT) has been provided. 3 tub-wells (with total 45HP pump) used with piped network of HDPE PN-10, PE 100 pipes are used
3424 m long piped network has been laid at site to collect the sewage from each household with the help of 237 manholes and chambers and dispose off the same in trunk sewer line of Wave City RCC pipe class NP2 has been used Dia Length 150 573 200 2851 Total 3424 Manholes/CHambers Dia No. Chamber 450x450 66 900 131 1200 15 1500 25 Total 237
3069 m long piped network has been laid at site to collect the storm water run off generating from roads, open areas and green areas with the help of 106 manholes and gully pits and dispose off the same in trunk storm water drainage line of Wave City RCC pipe class NP2 has been used Pipe Dia Length 200 2059 250 273 300 258 350 124 400 55 450 68 500 145 700 87 Total 3069 Manholes Manhole Dia No. 900 106
As per the Approved layout, Green area and Open spaces is 8532.62 SQM (8.61 %). There are four parks with respective areas 4450 SQM, 1044 SQM , 1248 SQM , 904 SQM. All parks are Wire fencing along boundary, Grassing and tree Plantation
One tree on one side of 9m road Both side trees on 12m and 15m road
Total 3 no’s of Compact substation detail as 1000 KVA – 2nos and 1600 KVA -1 no. of make Ambit Switchgear. 7.5 meter long decorative street light poles with 90 watt LED light fixtures. Feeder panels of 6 way, 8 –way and 12way.
There is no community building in this project.
The scheme sewage shall be disposed in trunk sewer line which goes to Township level STP proposed in Sec-4, Wave City. Township level STP shall be installed later when the sufficient sewage is available and pipe network is through upto STP. In order to treat sewage till the township level STP comes up a modular type 200 KLD STP has been installed at site.
Solid waste shall be collected from each household and segregated a solid waste treatment facility developed at Sec-6 where organic waste is composted with the help of Automatic organic waste converter machine.
A separate network comprising 4344 m long piped network has been developed to collect the rooftop rain water from each plot less than 300sqm and carry the same to RWH recharge structures developed in the nearby park. Pipe Dia Length 150 4011 200 43 250 135 300 96 350 9 400 21 450 29 Total 4344 Chamber Dia No. 600x600 271 Total 271 Two RWH recharge structures of approx. 144 cum have been developed at site. Modular type RWH pits have been developed with Rain Max recharge Tanks technology.
NA
NA
NA
NA
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
99019.64 m²
1065837.50 ft²