Plots demarcated as per Approved layout of building plan.
Boundary wall shall be made with standard Fly Ash Brick and MS Grill with thickness of 230mm and height 1.8m
Width (m) Width of Carriage way (m) Width of Footpath (m) GSB (mm) WMM (mm) Interlocking tiles over sand bed (mm) 11.5 6 - 150 100 65 12.0 12 - 150 100 65 13.0 7.5 - 150 100 65 14.5 9.0 - 150 100 65
Width (m) Width of Footpath (m) GSB (mm) Interlocking and tiles over sand bed (mm) 11.5 - - - 12.0 - - - 13.0 - - - 14.5 - - -
The water supply system planned to provide 24 x 7 water supply. HDPE pipe PN-8, PE-80 for water supply network RCC storage tank s (4x65 KL UGT) 2 Nos. Tube-wells
RCC pipe class NP2 has been proposed Manhole/Chambers made with Brick Masonry in Conical shape ranging from dia 900 to 1500mm
RCC pipe class NP2 has been used Manhole/Chambers made with Brick Masonry in Conical shape with dia 900mm
Wire fencing along boundary, Grassing and tree Plantation
One Tree on one side of 9m road and 7.5m road Both side trees on 12m and 18m road
Compact substation 1 x 2000 KVA and 1 x 630 KVA 5m Cast Iron Pole with GI Ribbed/Grooved extrusion and single arm bracket Street light poles with 55 watt Cast Iron LED fixture. Feeder panels-6 way, 8 way and 12 way.
NA
250 KLD STP with MBBR Technology is planned within the premise.
Door to Door Collection shall be ensured from each household. Segregation waste treatment facility at Sec-6. Organic waste in composed with the help of Automatic organic waste converter machine.
2 Nos. Modular type rain water harvesting pits panned in green areas of the proposed development.
Use of LED lights with lower LPDs (Lighting Power Density) when compared to baseline set by ECBC. Installation solar PV cells as required capacity synched with power supply grid are being proposed to meet requirements of EIA Authorities. Energy Metering to regulate the usage of electricity. Efficient equipments like motors, pumps ACs Lifts, etc. Zero use of Hydro-chlorofluorocarbon (HCFC) refrigerants in (HVAC) equipment and Unitary Air-Conditioners installed in the building(s). Use of halon free fire suppression equipment.
Fire staircase and FHC, is planned at each tower and floor as per NBC requirement.
NA.
Fire staircase Planned as per NBC requirement.
NA.
Showing 3 blocks with 51 units
Total Carpet Area
35904.00 m²
386467.07 ft²
Total Units
384
2 different types
Blocks & Floors
3
9 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17089.75 m²
183952.36 ft²