ONGOINGActive

TULIP MONSELLA AND TULIP ATTILA

GURUGRAM, GURGAON
09-11-2021
Launch Date
ONGOING
Type
2030-12-31
Completion Date

Overview

Launch Date

09-11-2021

Completion Date

2030-12-31

RERA ID

RERA-GRG-966-2021

Basic Details

Project NameTULIP MONSELLA AND TULIP ATTILA
Project IDRERA-GRG-966-2021
Project TypeONGOING
Applicant TypeCompany
Submission Date09-11-2021 06:49:24 PM
Builder NameTULIP INFRATECH PVT. LTD.
CINU7010DL2005PTC144086
PANXXXX755E
EmailINFO@TULIPGROUP.IN
WebsiteHTTP://WWW.TULIPGROUP.IN
Phone (Mobile)9891293997
Phone (Landline)01244417777
Registered AddressPLOT NO. 76-G, SECTOR 18, GURUGRAM
Project AddressSECTOR 53 GURUGRAM
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameICICI BANK , BARAKHAMBA ROAD, NEW DELHI
Account Number777705678020
IFSC CodeICIC0001359
MICR Code110229143
Branch Code001359

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)ATUL KUMAR RAI, 26/3B, P and TKali Bari Marg, Udhyan Marg New Delhi- 110001
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)ANNEXED

Development Details

Land Area19.244 (Acre)
Proposed FAR350
Permissible FAR350 AND 250
Total Licensed Land19.244 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7514.78
CONSTRUCTION OF ROADS39572.624
PAVEMENTS0
PARKS AND PLAYGROUNDS23671.766
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION417.184
CLUB HOUSE981.258
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER857.982
AREA UNDER COMMERCIAL4862.176
Total77877.77

Cost Details

Land Cost37317.00 Lakhs
Other Cost45613.994 Lakhs
Estimated Project Cost302077.02 Lakhs
Estimated Infrastructure Cost9850.075 Lakhs
Estimated Apartment Construction Cost209294.47 Lakhs

Documents

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 09-11-2021

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 09-11-2021

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 09-11-2021

DEMARCATION PLAN

Uploaded on: 17-05-2022

ZONING PLAN

Uploaded on: 17-05-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 17-05-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 17-05-2022

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 17-05-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 17-05-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 17-05-2022

BIP FINAL APPROVAL

Uploaded on: 17-05-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 17-05-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 17-05-2022

Statutory Approvals

LICENSE APPROVALDate: 17-09-2021Status: ALREADY BEEN OBTAINED
ZONING PLAN APPROVALDate: 06-08-2014Status: ALREADY BEEN OBTAINED
BUILDING PLAN / SITE PLAN APPROVALDate: 13-04-2022Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLANDate: 30-04-2019Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: No
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREASUBMITTED TO HUDA
RENEWABLE ENERGY SYSTEMSUBMITTED TO HUDA
SCHOOLSUBMITTED TO HUDA
HOSPITAL/DISPENSARYSUBMITTED TO HUDA
ANY OTHERSUBMITTED TO HUDA
STPSUBMITTED TO HUDA
UNDERGROUND WATER TANKSUBMITTED TO HUDA
ELECTRIC SUBSTATIONSUBMITTED TO HUDA
RAIN WATER HARVESTINGSUBMITTED TO HUDA
ELECTRIFICATION COST UPTO PROJECT SITESUBMITTED TO HUDA

NOC

ROADSProvider: ALREADY CONNECTEDApproval Status: Pending
WATER SUPPLYProvider: HUDA, GURUGRAMApproval Status: Approved
ELECTRICITYProvider: DHBVN, HARYANAApproval Status: Approved
SEWAGE DISPOSALProvider: HUDA, GURUGRAMApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDA, GURUGRAMApproval Status: Approved

Project Team

Authorized Representative

MR CHIRAG NAGPAL
Name
MR CHIRAG NAGPAL
PAN
XXXX536C
Email
INFO@TULIPGROUP.IN
Mobile
9891293997
Landline
01244417777
Address
PLOT NO. 76-G SECTOR 18 GURUGRAM

Managing Director/CEO

MR PARVEEN JAIN
Name
MR PARVEEN JAIN
PAN
XXXX176L
Email
INFO@TULIPGROUP.IN
Mobile
9891293997
Landline
01244417777
Address
PLOT NO. 76-G SECTOR 18 GURUGRAM

Directors

MR VIPIN JAIN
Name
MR VIPIN JAIN
PAN
XXXX043K
Email
INFO@TULIPGROUP.IN
Mobile
9891293997
Landline
01244417777
Address
PLOT NO. 76-G SECTOR 18 GURUGRAM
MR VIKAS JAIN
Name
MR VIKAS JAIN
PAN
XXXX788Q
Email
INFO@TULIPGROUP.IN
Mobile
9891293997
Landline
01244417777
Address
PLOT NO. 76-G SECTOR 18 GURUGRAM

Contact Details

Project ContactEmail: INFO@TULIPGROUP.INMobile: 9891293997Landline: 01244417777
Project Contact PersonName: MR CHIRAG NAGPALEmail: MCC@TULIPINFRATECH.COMMobile: 9891293997Landline: 01244417777

Land Details

Land Area19.244 (Acre)
Proposed FAR350
Permissible FAR350 AND 250
Total Licensed Land19.244 (Acre)

Land Usage

Land Cost37317.00 Lakhs
Other Cost45613.994 Lakhs
Estimated Project Cost302077.02 Lakhs
Estimated Infrastructure Cost9850.075 Lakhs
Estimated Apartment Construction Cost209294.47 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres---0
Electrical sub station---16
Electricity Supply System---40.7973
Electrification cost up to project site---40
Other---0
Parking---0
Parks and Playgrounds---38.488
Rain water harvesting---0.8
Renewable energy system---2
Roads & Pavements---38.488
STP---16
Security and fire fighting on built up area---120
Sewerage treatment & garbage disposal---15.3952
Shopping area---0
Storm Water Drainage---7.6976
Street lighting---3.8488
Underground water tank---16
Water Supply System---38.488
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station16161616
Electricity Supply System40.797340.797340.797340.7973
Electrification cost up to project site40404040
Other0000
Parking0000
Parks and Playgrounds38.48838.48838.48838.488
Rain water harvesting0.80.80.80.8
Renewable energy system2222
Roads & Pavements38.48838.48838.48838.488
STP16161616
Security and fire fighting on built up area120120120120
Sewerage treatment & garbage disposal15.395215.395215.395215.3952
Shopping area0000
Storm Water Drainage7.69767.69767.69767.6976
Street lighting3.84883.84883.84883.8488
Underground water tank16161616
Water Supply System38.48838.48838.48838.488
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station16161616
Electricity Supply System40.797340.797340.797340.7973
Electrification cost up to project site40404040
Other0000
Parking0020
Parks and Playgrounds38.48838.488038.488
Rain water harvesting0.80.80.80.8
Renewable energy system2238.4882
Roads & Pavements38.48838.48838.48838.488
STP16161616
Security and fire fighting on built up area120120120120
Sewerage treatment & garbage disposal15.395215.395215.395215.3952
Shopping area0000
Storm Water Drainage7.69767.69767.69767.6976
Street lighting3.84883.84883.84883.8488
Underground water tank16161616
Water Supply System38.48838.48838.48838.488
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station16161616
Electricity Supply System40.797340.797340.797340.7973
Electrification cost up to project site40404040
Other0000
Parking0000
Parks and Playgrounds38.48838.48838.48838.488
Rain water harvesting0.80.80.80.8
Renewable energy system2222
Roads & Pavements38.48838.48838.48838.488
STP16161616
Security and fire fighting on built up area120120120120
Sewerage treatment & garbage disposal15.395215.395215.395215.3952
Shopping area0000
Storm Water Drainage7.69767.69767.69767.6976
Street lighting3.84883.84883.84883.8488
Underground water tank16161616
Water Supply System38.48838.48838.48838.488
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station0.8161616
Electricity Supply System40.797340.797340.797340.7973
Electrification cost up to project site40404040
Other0000
Parking0000
Parks and Playgrounds38.48838.48838.4880
Rain water harvesting160.80.80.8
Renewable energy system2222
Roads & Pavements38.48838.48838.48838.488
STP16161616
Security and fire fighting on built up area120120120120
Sewerage treatment & garbage disposal15.395215.395215.395215.3952
Shopping area0000
Storm Water Drainage7.69767.69767.69767.6976
Street lighting3.84883.84883.84883.8488
Underground water tank16161616
Water Supply System38.48838.48838.48838.488
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical sub station16161616
Electricity Supply System40.797340.797340.797340.7973
Electrification cost up to project site40404040
Other0000
Parking0000
Parks and Playgrounds38.48838.48838.48838.488
Rain water harvesting0.80.80.80.8
Renewable energy system2222
Roads & Pavements38.48838.48838.48838.488
STP16161616
Security and fire fighting on built up area120120120120
Sewerage treatment & garbage disposal15.395215.395215.395215.3952
Shopping area0000
Storm Water Drainage7.69767.69767.69767.6976
Street lighting3.84883.84883.84883.8488
Underground water tank16161616
Water Supply System38.48838.48838.48838.488

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEI) LIVING/DINING: TILES /IMPORTED MARBLE II) MASTER BED ROOM/DRESS ROOM AND BEDROOM : LAMINATED WOODEN FLOORING III) KITCHEN: ANTI SKID TILES / EQUIVALENT IV) ALL TOILETS: PREMIUM QUALITY TILES. V) SIT OUTS/BALCONY: ANTI SKID CERAMIC TILES VI) UTILITY ROOM: VITRIFIED TILES VII) UTILITY TOILET & BALCONY: ANTI SKID CERAMIC FLOOR TILES.
WALL FINISHING DETAILSI) LIVING/DINING, MASTER BEDROOM, BEDROOMS: ACRYLIC EMULSION PAINT FINISH II) MASTER TOILET/DRESS ROOM, TOILETS: PREMIUM QUALITY TILES/MIRROR III) KITCHEN: 2’-0” DADO ABOVE COUNTERS AND ACRYLIC EMULSION PAINT. IV) UTILITY ROOMS/ UTILITY BALCONY/UTILITY TOILET: OIL BOUND PAINT FINISH V) SIT OUTS/BALCONY: PERMANENT TEXTURE/PAINT FINISH.
KITCHEN DETAILSMARBLE/GRANITE COUNTER WITH STAINLESS STEEL SINK, CP FITTINGS AND MODULAR KITCHEN.
BATHROOM FITTINGSI) MASTER TOILET/DRESS ROOM: SANITARY WARE INCLUDES WASH BASIN AND EWC CP FITTINGS: HOT AND COLD WATER WALL AND BASIN MIXTURE OF PREMIUM BRANDS, HAND SHOWER, HEALTH FAUSET& ANGLE VALVE.
WOOD WORK ETCNOT APPLICABLE
DOORS AND WINDOS FRAMESHARD WOOD DOOR FRAMES WITH MOULDED SKIN DOOR / PANEL DOOR SHUTTERS.
GLASS WORKNA
ELECTRIC FITTINGSSWITCHES ONLY (NO LIGHTS& FIXTURES)
CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRING.
CUPBOARD DETAILSNA
WATER STORAGEUNDER GROUND / OVER HEAD TANKS
LIFT DETAILSCAPACITY OF 10 / 13 PERSONS, KONE OR EQUIVALENT
EXTERNAL GLAZINGSENERGY EFFICIENT DOUBLE GLASS ALUMINIUM / UPVCGLAZINGS WITH FLY MESH SHUTTER IN ALL HABITABLE AREAS & ALUMINIUM / UPVC FRAMES WITH SINGLE GLASS IN ALL TOILETS & UTILITY ROOMS.
WINDOWS/GLAZINGSENERGY EFFICIENT DOUBLE GLASS ALUMINIUM / UPVCGLAZINGS WITH FLY MESH SHUTTER IN ALL HABITABLE AREAS & ALUMINIUM / UPVC FRAMES WITH SINGLE GLASS IN ALL TOILETS & UTILITY ROOMS.
DOORSMOULDED SKIN DOOR / PANEL DOOR SHUTTERS.
MAIN DOORSMOULDED SKIN DOOR / PANEL DOOR SHUTTERS.
INTERNAL DOORSPOLISHED MOULDED SKIN DOOR/FLUSH DOORS
AIR CONDITIONINGNA
ELECTRICAL FITTINGSSWITCHES ONLY (NO LIGHTS & FIXTURES)
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEPAINT FINISHES
INTERNAL FINISHINGPAINT FINISHES

Unit-wise Specifications

TOILET
FLOORPREMIUM QUALITY TILES
WALLSPREMIUM QUALITY TILES/MIRROR
CEILINGGRID FALSE CEILLINGOREQUIVLAENT
COUNTERSNA
SANITARY WARE/CP FITTINGSWASH BASIN &EWC, CP FITTINGS: HOT AND COLD WATER WALL AND BASIN MIXTURE OF PREMIUM BRANDS, HAND SHOWER, HEALTH FAUSET& ANGLE VALVE.
FIXTURESEXHAUST FAN
KITCHEN
FLOORANTI SKID TILES OR EQUIVALENT
WALLS2'-0” DADO ABOVE COUNTERS & ACRYLIC EMULSION PAINT
CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
COUNTERSMARBLE / GRANITE WITH STAINLESS STEEL SINK, CP FITTINGS
FIXTURESMODULER KITCHEN
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORANTI SKID CERAMIC TILES
WALLS & CEILINGPERMANENT TAXTURE/ PAINT FINISH
RAILINGS4'-0” HIGH WALL/TOUGHENED GLASS RAILINGS
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT FINISH
CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
WARDROBESNA
MASTER TOILET
FLOORPREMIUM QUALITY TILES
WALLSPREMIUM QUALITY TILES/MIRROR
CEILINGGRID FALSE CEILINGOR EQUIVALENT
COUNTERSNA
SANITARY WARE/CP FITTINGSWASH BASIN & EWC, CP FITTINGS: HOT AND COLD WATER WALL AND BASIN MIXTURE OF PREMIUM BRANDS, HAND SHOWER, HEALTH FAUSET& ANGLE VALVE.
FITTING/FIXTURESBATH TUB, SHOWER PARTITION, EXHAUST FAN.
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT FINISH
CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORTILES /IMPORTED MARBLE
WALLSACRYLIC EMULSION PAINT FINISH
CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGOIL BOUND PAINT FINISH
TOILETANTI SKID CERAMIC FLOOR TILES & CERAMIC TILES ON THE WALLS WITH CP FITTINGS, SANITARY WARE, EXHAUST FAN
BALCONYANTI SKID CERAMIC TILES

Fee Details

Payment 1
amount:2625000
cheque no:436236
draft date:11-11-2021
payable to:HRERA Gurugram
payee bank:PNB
Payment 2
amount:3075000
cheque no:436237
draft date:11-11-2021
payable to:HRERA Gurugram
payee bank:PNB
Payment 3
amount:2000
cheque no:436238
draft date:11-11-2021
payable to:HRERA Gurugram
payee bank:PNB
Payment 4
amount:8460000
cheque no:437012
draft date:16-04-2022
payable to:HRERA Gurugram
payee bank:PNB
Payment 5
amount:84000
cheque no:5082252515
draft date:26-04-2022
payable to:HRERA Gurugram
payee bank:PNB- NEFT