NewActive

TRECENTO RESIDENCES-A

Gautam Buddha Nagar, Uttar Pradesh
01-10-2023
Launch Date
New
Type
17-07-2028
Completion Date

Overview

Launch Date

01-10-2023

Completion Date

17-07-2028

RERA ID

UPRERAPRJ283531

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)5128
Project NameTRECENTO RESIDENCES-A
Registration Fee (in Rs.)31000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)58
DistrictGautam Buddha Nagar
Original Start Date-
TehsilDadri
Proposed Start Date01-10-2023
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)20374
Proposed Completion Date17-07-2028

Location

Latitude

28.27

Longitude

77.31

Brochures

Loading

Bank Details

Account Details
Name of the AccountGOLF LAKE LLP-COLLECTION ACCOUNT FOR TRECENTO RESIDENCES-A
Account Number739105000716
Bank NameICICI BANK
Branch NameGAUR CITY-2
Branch AddressGAUR CITY-2, SECTOR-16C, GREATER NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0007391
Separate Account Details
Name of the AccountGOLF LAKE LLP-SEPERATE ACCOUNT FOR TRECENTO RESIDENCES-A
Account Number739105000715
Bank NameICICI BANK
Branch NameGAUR CITY-2
Branch AddressGAUR CITY-2, SECTOR-16C, GREATER NOIDA
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0007391
Transaction Account Details
Name of the AccountGOLF LAKE LLP-TRANSACTION ACCOUNT FOR TRECENTO RESIDENCES-A
Account Number739105000714
Bank NameICICI BANK
Branch NameGAUR CITY-2
Branch AddressGAUR CITY-2, SECTOR-16C, GREATER NOIDA, U.P
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0007391

Development Works

Demarcation of Plots

DEMARCATED AS PER APPROVED LAYOUT PLAN OF LAND 1, JAYPEE GREENS, GREATER NOIDA

Boundary Wall

THIS BUILDING IS FOOFT PRINT OF LAND-1 PLOT, THEREFORE BEING A PART OF LAND-1, JAYPEE GREENS, BOUNDARY WALL IS NOT APPLICABLE FOR THIS FOOT PRINT PLOT

Road Work

40 MM HIGH GRADE INTERLOCKING PAVERS USED WITH FLOORING PATTERN

Footpaths

LAND-1 TOWNSHIP ROAD ALREADY DEVELOPED, INTERNAL ROAD UP TO PORCH, CC/INTERLOCKING TILES USED WITH DIFFERENT PATTERNS

Water Supply Including Drinking Water Facilities

WATER SUPPLY SHALL BE PROVIDED FROM THE LAND-1 TOWNSHIP LEVEL FROM THE CENTRALIZED WATER SUPPLY SYSTEM ALREADY BEEN OPERATIONAL

Sewer System

TO BE CONNECTED TO LAND-1 TOWN SHIP LEVEL SEWER LINE WHICH HAS ALREDY BEEN LAYED

Drain

TO BE CONNECTED TO LAND-1 TOWNSHIP LEVEL DRAIN LINE WHICH HAS ALREADY BEEN LAYED

Parks

PARKS ARE PROVIDED AT THE LAND-1 TOWNSHIP LEVEL ALOS PROVISION OF LANDSCAPE AT GROUND LEVEL/ABOVE BASEMENT.

Tree Planting

LANSCAPE DESIGN WILL BE PROVIDED AS PER THE LANDSCAPE DESIGN

Design For Electric Supply Including Street Lighting

ENERGY EFFICIENT POLE MOUNTED LED LIGHT FIXTURE SHALL BE PROVIDED AND ELECTRICAL SUPPLY WILL BE PROVIDED AT THE LAND-1 TOWNSHIP LEVEL WHICH IS ALREADY BEEN OPRETIONAL

Community Buildings

COMMUNITY FACILITIES SHALL BE PROVIDED AT THE GROUND FLOOR LEVEL OF THE BUILDING

Treatment and Disposal System of Sewage and Sullage water

CENTRALISED (OWC) PLANT PROVIDED AT LAND-1 TPOWNSHIP LEVEL ORGANIC AND INORGANIC COLLECTING BIN SHALL BE PROVIDED AT THE BUILDING PERMISES

Solid Waste Management And Disposal System

PROVIDED AT THE LAND-1 TOWNSHIP LEVEL.

Water Conservation System

CETRALIZED STORM WATER DRAINAGE SYSTEM SHALL BE CONNECTED WITH RAIN WATER HARVESTING PIT AT DIFFERENT LOCATION

Energy Management System Including Use of Renewable Energy

ENERGY EFFICIENT PLUMBING AND ELECTRICAL FIXTURE PROVIDED FOR BETTER ENERGY MANAGMENT. WHICH INCLUDES LED LIGHT FIXTURE, HEAT PUMP AND LOW WATER CONSUMPTION IN WASH BASIN AND HEALTH FAUCET

Fire Protection And Fire Safety System

CENTRALIZED FIRE DETECTION AND FIRE FIGHTING SYSTEM SHALL BE INSTALLED IN THE BUILDING AND PROVISION OF AUTOMATIC SPRINKLER SYSTEM, FHC, HOOTERS, TALK BACK SYSTEM, FIRE ALARM PANEL, FIRE EXTINGUISHER, AND SMMOKE EXTRACTION SYSTEM IN BASEMENT ETC. SHALL BE PROVIDED

Social Infrastructure And Other Public Amenities Including Public Health Services

SHALL BE PROVIDED AT LAND-1 TOWNSHIP LEVEL

Emergency Evacuation Services

N.A.

Other Miscellaneous Work

AS PER DESIGN

Documents

Registry Document

No: 2936 | Date: 08-06-2000

Lease Deed

No: 2936 | Date: 08-06-2000

Allotment Letter issued by Competent Authority

No: 00 | Date: 02-03-2019

Sale Deed

No: 20712/23 | Date: 10-08-2023

Extract of Khatauni

No: 13.09.2023 | Date: -

Proforma of Completion Certificate(Occupancy)

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 28-07-2023

Commencement Certificate

Uploaded: 28-07-2023

Other Plan(If Any)

Uploaded: 28-07-2023

Proforma of Application Form

Uploaded: 28-07-2023

Proforma of Allotment Letter

Uploaded: 28-07-2023

Proforma of Conveyance Deed

Uploaded: 25-08-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 12-08-2023

Waste Disposal Plan

Uploaded: 28-07-2023

Water Supply Plan

Uploaded: 28-07-2023

Electricity Supply Plan

Uploaded: 28-07-2023

Development Work Plan

Uploaded: 12-08-2023

Affidavit

Uploaded: 13-09-2023

CA CERTIFICATE

Uploaded: 25-08-2023

ARCHITECT CERTIFICATE

Uploaded: 12-08-2023

ENGINEERS CERTIFICATE

Uploaded: 12-08-2023

Other

Uploaded: 13-09-2023

Permits

Orignal Permit NoPLG/BP-4493/2023/1493
Orignal Permit Date18-07-2023
Valid Upto17-07-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto17-07-2033
End Date17-07-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)GOLF LAKE LLP
Contractor AddressGAUR BIZ PARK, PLOT NO.1, ABHAY KHAND-II, INDIRAPURAM, GHAZIABAD, U.P
Architect NameATEESH AGARWAL
Architect AddressF-89, GREEN PARK, NEW DELHI-16
Architect Licence NumberCA/2003/31212
Structural Engineer NameRAMKRISHNA DONGAR CHAUDHARI
Structural Engineer Address221, SHANKAR NIWAS, MULUND WEST, LBS CHECK NAKA-400080, MUMBAI
Mobile number(Project Co-ordinator)8376904275

Land Details

AFS

Showing 1 blocks with 33 units

Property Summary

Total Carpet Area

32655.60

351501.61 ft²

Total Units

60

2 different types

Blocks & Floors

1

33 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:544.26
Balconies:60
Parking ratio:0.00 per unit

Block TRECENTO RESIDENCES-A

33 units

Khasra Details

Total Area

5128.00

55197.28 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoTRECENTO RESIDENCES,-A, CONDOMINIUM APARTMENTS, TYPE-IV, SUN COURT, B6a (CT4/TOWER-A)
Area(In Sq. Mt.)5128

Other Details

Contractor Name (if any)GOLF LAKE LLP
Contractor AddressGAUR BIZ PARK, PLOT NO.1, ABHAY KHAND-II, INDIRAPURAM, GHAZIABAD, U.P
Architect NameATEESH AGARWAL
Architect AddressF-89, GREEN PARK, NEW DELHI-16
Architect Licence NumberCA/2003/31212
Structural Engineer NameRAMKRISHNA DONGAR CHAUDHARI
Structural Engineer Address221, SHANKAR NIWAS, MULUND WEST, LBS CHECK NAKA-400080, MUMBAI
Mobile number(Project Co-ordinator)8376904275