Launch Date
Completion Date
RERA ID
28.646976
77.492051
The Project is Enclosed with boundary wall having width 230 mm and height 2 meter
Combination of RCC column with brick work, plaster/paint and MS railing
Road pattern provided in such a way that approach to all the towers is motorable and section consists of Subgrade preparation with one layer GSB and one layer of WMM and black top/Cement Concrete pavement/pavers as per design of Developers Consultant.
Combination of Kerb stone/paver/cement concrete as per design of Developers Architect.
System for water is ground water and provided thru underground/overhead water tank with individual ROs to be installed by allottee.
Household Sewerage is collected through sewage lines upto the STP established for the project and after treatment the sludge and treated water obtained shall be used green areas like gardens, parks, green landscapes and also for flushing lines.
Rain water collection shall be done from terrace thru storm water lines/covered drains at ground level and connected to rain harvesting pits.
Provision of green area as per design of Developers Architect.
Planned trees are 182 nos. in open area and along the boundary wall different types of trees shall be provided.
Electrical connection for the apartment from PVVNL or its Licensee/Sub Licensee and connection will be provided to customers thru prepaid meter and proportionate electricity infrastructure cost including feeder construction expenses, substations/panels/transformers/other equipments/expenses, cabling expenses, system loading charges etc as applicable shall be borne by the customers and further subject to regular payment of fixed electricity charges, usage/consumption charges and energy losses/line distribution losses and payment of taxes/cess/duties/levy as applicable and demanded from time to time as per guidelines laid down by power supply company/government .
A common club along with Gym provided for Project.
shall be connected to STP provided for treating household sewerage and the treated Sludge/water is being used for green areas and flushing system.
House to House collection system has been planned with a arrangement of separate collection of decomposable and non decomposable waste in separate bags and a treatment arrangement for the same.
9 nos. underground recharge pits with perforated filter media used for rain water harvesting provided
NA
Vertical risers with FHC shaft/sprinklers and connected to pump room with a provision of Jockey/Main/diesel pump as per NBC.
NIL
Fire staircase provided as per NBC.
NA
Showing 5 blocks with 428 units
Total Carpet Area
72949.35 m²
785219.51 ft²
Total Units
428
1 different types
Blocks & Floors
5
30 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
28077.00 m²
302218.02 ft²