NEWActive

THE SELENE TOWER

GURUGRAM, GURGAON
07-05-2025
Launch Date
NEW
Type
2030-06-30
Completion Date

Overview

Launch Date

07-05-2025

Completion Date

2030-06-30

RERA ID

RERA-GRG-1946-2025

Basic Details

Project NameTHE SELENE TOWER
Project IDRERA-GRG-1946-2025
Project TypeNEW
Applicant TypeCompany
Submission Date07-05-2025 12:46:38 PM
Builder NameST. PATRICKS REALTY PVT LTD
CINU45200HR2008PTC037964
PANXXXX877J
Emailcontact@centralpark.in
Websitehttp://www.centralpark.in
Phone (Mobile)9871640340
Phone (Landline)Not specified
Registered AddressTHE MEDIAN, CENTRAL PARK RESORTS, OFF SOHNA ROAD, SECTOR 48, GURUGRAM, HARYANA-122018
Project AddressTHE MEDIAN, CENTRAL PARK RESORTS, OFF SOHNA ROAD, SECTOR-48, GURUGRAM, HARYANA-122018
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameICICI BANK LTD, UNIVERSAL TRADE TOWER MAIN SOHNA ROAD GURGAON HARYANA 122101
Account Number777705001876
IFSC CodeICIC0001651
MICR Code110229194
Branch Code001651

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)A.S. Bakshi, K.S. Bakshi, Raj Sahni, Shiv Bakshi, Sanjit Bakshi, Pankaj Jain
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached.

Development Details

Land Area3.818 (Acre)
Proposed FAR1.8627
Permissible FAR1.90
Total Licensed Land3.818 (Acre)

Land Usage

CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0.0161
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.8165
PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.8697
CONSTRUCTION OF ROADS0.9139
PAVEMENTS0
PARKS AND PLAYGROUNDS1.0830
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0.1188
Total3.818

Cost Details

Land Cost8356.52 Lakhs
Other Cost14013.85 Lakhs
Estimated Project Cost64945.40 Lakhs
Estimated Infrastructure Cost3365.53 Lakhs
Estimated Apartment Construction Cost39209.50 Lakhs

Documents

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 07-05-2025

DEMARCATION PLAN

Uploaded on: 07-05-2025

PROJECT PROPONENTS

Uploaded on: 01-07-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 07-05-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 07-05-2025

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 07-05-2025

ZONING PLAN

Uploaded on: 07-05-2025

SPE BOOK OF 3.818 ACRE

Uploaded on: 01-07-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 07-05-2025

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 07-05-2025

TREATED WATER ASSURANCE COMM. 3.818 ACRES

Uploaded on: 04-07-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 07-05-2025

NEW NET-WORTH CERTIFICATE

Uploaded on: 04-07-2025

APPROVED BRIII

Uploaded on: 01-07-2025

REP2

Uploaded on: 01-07-2025

FINANCIAL INVENTORY

Uploaded on: 04-07-2025

FOREST NOC

Uploaded on: 01-07-2025

APPROVAL OF SPE OF 3.818 ACRE

Uploaded on: 01-07-2025

LOI 3.818 ACRE

Uploaded on: 01-07-2025

SECOND FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

BASEMENT1 PLAN_COMPRESSED

Uploaded on: 04-07-2025

ALLOTMENT LETTER

Uploaded on: 01-07-2025

STORM WATER ASSURANCE COMM 3.818 ACRES

Uploaded on: 01-07-2025

FRESH WATER ASSURANCE COMM. 3818 ACRES

Uploaded on: 01-07-2025

BILATERAL AGREEMENT 3818 ACRE

Uploaded on: 01-07-2025

SAJRA

Uploaded on: 01-07-2025

9TH & 12 A FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

LICENSE

Uploaded on: 01-07-2025

FIRE SCHEME APPROVAL

Uploaded on: 01-07-2025

NON-ENCUMBRANCE

Uploaded on: 01-07-2025

6TH FLOOR PLAN TYPICAL TYPE 1_COMPRESSED

Uploaded on: 04-07-2025

ELEVATIONS X & Y_COMPRESSED

Uploaded on: 04-07-2025

MUTATION

Uploaded on: 01-07-2025

COLLABORATION AGREEMENT

Uploaded on: 01-07-2025

AAI NOC

Uploaded on: 01-07-2025

ELEVATIONS Z & W_COMPRESSED

Uploaded on: 04-07-2025

AGREEMENT FOR SALE

Uploaded on: 01-07-2025

BANK UNDERTAKING

Uploaded on: 01-07-2025

COMBINED AFFIDAVIT

Uploaded on: 01-07-2025

JAMABANDHI

Uploaded on: 01-07-2025

POWER ASSURANCE COMM. 3.818 ACRES

Uploaded on: 01-07-2025

SUPERIMPOSED DEMARCATION PLAN

Uploaded on: 01-07-2025

15TH, 16TH, 18TH, 19TH, 20TH, 22ND, 23RD & 24TH FLOOR (TYPICAL TYPE 3)_COMPRESSED

Uploaded on: 04-07-2025

BASEMENT 2 PLAN_COMPRESSED

Uploaded on: 04-07-2025

7TH, 8TH, 10TH, 11TH, 12TH & 14TH FLOOR (TYPICAL TYPC 2)

Uploaded on: 04-07-2025

5TH FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

REP1 CA CERTIFICATE

Uploaded on: 04-07-2025

SERVICE FLOOR PLAN AT 3RD FLOOR LEVEL_COMPRESSED

Uploaded on: 04-07-2025

4TH FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

BASEMENT 3 PLAN_COMPRESSED

Uploaded on: 04-07-2025

GROUND FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

17TH, 21TH & 25TH FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

FIRST FLOOR PLAN_COMPRESSED

Uploaded on: 04-07-2025

SERVICE FLOOR AT 26TH FLOOR LEVEL_COMPRESSED

Uploaded on: 04-07-2025

SITE PLAN 3.818 ACRE_COMPRESSED

Uploaded on: 04-07-2025

SUPP. COLL. AGGR. MLT PROPMART WITH ST. PATRICKS (10792 OF 18.01.23) UPDATED

Uploaded on: 04-07-2025

NO DEFAULT CERTIFICATE

Uploaded on: 04-07-2025

Statutory Approvals

SERVICE ESTIMATE APPROVALDate: 30-05-2025Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 22-04-2025Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 28-05-2025Status: ALREADY BEEN OBTAINED
DTCP LICENSE NO. 163 OF 2023Date: 17-08-2023Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 18-08-2023Status: ALREADY BEEN OBTAINED
AAI NOCDate: 10-06-2025Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: NAStatus: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGSUBMITTED TO HUDA
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERSUBMITTED TO HUDA

NOC

ROADSProvider: NHAIApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Pending
ELECTRICITYProvider: HSVPApproval Status: Pending
SEWAGE DISPOSALProvider: HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HSVPApproval Status: Pending

Project Team

Authorized Representative

CHIRAG GEHLOT
Name
CHIRAG GEHLOT
PAN
XXXX387B
Email
contact@centralpark.in
Mobile
9871640340
Landline
N/A
Address
The Median Central Park Resorts Off Sohna Road Sector-48 Gurugram Haryana-122018

Managing Director/CEO

AMARJIT SINGH BAKSHI
Name
AMARJIT SINGH BAKSHI
PAN
XXXX645C
Email
contact@centralpark.in
Mobile
9810204050
Landline
N/A
Address
The Median Central Park Resorts Off Sohna Road Sector-48 Gurugram Haryana-122018

Directors

KANWALJIT
Name
KANWALJIT
PAN
XXXX285E
Email
contact@centralpark.in
Mobile
9871640340
Landline
N/A
Address
The Median Central Park Resorts Off Sohna Road Sector-48 Gurugram Haryana-122018

Contact Details

Project ContactEmail: contact@centralpark.inMobile: 7428189412Landline: N/A
Project Contact PersonName: CHIRAG GEHLOTEmail: contact@centralpark.inMobile: 9871640340Landline: N/A

Land Details

Land Area3.818 (Acre)
Proposed FAR1.8627
Permissible FAR1.90
Total Licensed Land3.818 (Acre)

Land Usage

Land Cost8356.52 Lakhs
Other Cost14013.85 Lakhs
Estimated Project Cost64945.40 Lakhs
Estimated Infrastructure Cost3365.53 Lakhs
Estimated Apartment Construction Cost39209.50 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-000
Other-000
Parks and Playgrounds-000
Roads & Pavements-000
Sewerage treatment & garbage disposal-000
Shopping area-0092.2013
Storm Water Drainage-000
Water Supply System-000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres51.7356.76129.446129.446
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area95.295104.577275.808183.607
Storm Water Drainage0000
Water Supply System0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres121.615121.61552.64369.528
Electricity Supply System0000
Other0011
Parks and Playgrounds0000
Roads & Pavements001111
Sewerage treatment & garbage disposal0000
Shopping area183.607189.79588.21107.058
Storm Water Drainage0000
Water Supply System0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres97.29799.386128.98128.98
Electricity Supply System00043
Other14242866
Parks and Playgrounds0007
Roads & Pavements22222222
Sewerage treatment & garbage disposal4669
Shopping area157.855157.855195.55195.55
Storm Water Drainage4669
Water Supply System3335
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres128.98128.98128.98128.98
Electricity Supply System43868686
Other62828384
Parks and Playgrounds7141414
Roads & Pavements22222222
Sewerage treatment & garbage disposal99910
Shopping area195.55195.55195.55195.55
Storm Water Drainage99910
Water Supply System5556
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres130.6694.96--
Electricity Supply System860--
Other824.3096--
Parks and Playgrounds140--
Roads & Pavements220--
Sewerage treatment & garbage disposal110--
Shopping area198.64125.18--
Storm Water Drainage110--
Water Supply System70--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN MARBLE FLOORING/ PREMIUM TILES OR EQUIVALENT
WALL FINISHING DETAILSPOP PUNNING WITH PLASTIC EMULSION PAINT OR EQUIVALENT
KITCHEN DETAILSHIGH QUALITY DESIGNER CERAMIC TILES
BATHROOM FITTINGSHIGH QUALITY DESIGNER CERAMIC TILES / MARBLE
WOOD WORK ETCHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
DOORS AND WINDOS FRAMESHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
GLASS WORKTOUGHENED GLASS
ELECTRIC FITTINGSPANASONIC OR EQUIVALENT, VISION MODEL OR EQUIVALENT
CONDUCTING AND WIRING DETAILSKEI, POLYCAB, ANCHOR OR EQUIVALENT
CUPBOARD DETAILSHARDWOOD
WATER STORAGEYES
LIFT DETAILSTOSHIBA
EXTERNAL GLAZINGSUPVC WITH TOUGHENED GLASS
WINDOWS/GLAZINGSUPVC WITH TOUGHENED GLASS
DOORSHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
MAIN DOORSHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
INTERNAL DOORSHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
AIR CONDITIONINGPANSONIC, VOLTAS OR EQUIVALENT
ELECTRICAL FITTINGSKEI, POLYCAB, ANCHOR OR EQUIVALENT
CNG PIPE LINENOT APPLICABLE
PROVISION OF WIFI AND BROADBAND FACILITYAS PER AVAILABILITY
EXTERNAL FINISHING/COLOUR SCHEMEWHITE
INTERNAL FINISHINGAS PER THE DESIGN

Unit-wise Specifications

TOILET
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
COUNTERSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
SANITARY WARE/CP FITTINGSKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
FIXTURESKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
KITCHEN
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
COUNTERSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
FIXTURESKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
KITCHEN APPLIANCESKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WARDROBESHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
MASTER TOILET
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
COUNTERSHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
SANITARY WARE/CP FITTINGSKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
FITTING/FIXTURESKOHLER, PARRYWARE, JAQUAR OR EQUIVALENT
MASTER BEDROOM/DRESSROOM
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
MODULAR WARDROBESHARDWOOD DOOR FRAME & DOOR SHUTTER OR EQUIVALENT
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
WALLSACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
CEILINGACTION TESA OR EQUIVALENT / LOCALLY AVAILABLE
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA
WALLS & CEILINGNA
TOILETNA
BALCONYNA

Fee Details

Payment 1
amount:1358000
cheque no:1554
draft date:29-04-2025
payable to:HRERA Gurugram
payee bank:INDUSIND
Payment 2
amount:50622
cheque no:15571
draft date:30-05-2025
payable to:HRERA Gurugram
payee bank:INDUSIND