NEWActive

THE SAAVIRA

GURUGRAM, GURGAON
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
image
03-10-2024
Launch Date
NEW
Type
2031-12-31
Completion Date

Overview

Launch Date

03-10-2024

Completion Date

2031-12-31

Configurations

3 BHK, 4 BHK

Sizes

0 - 0 sq.ft.

Project Size

1 Buildings - 72 units

Total Floors

25

RERA ID

RERA-GRG-1744-2024

Basic Details

Project NameTHE SAAVIRA
Project IDRERA-GRG-1744-2024
Project TypeNEW
Applicant TypeCompany
Submission Date03-10-2024 09:08:48 PM
Builder NameONE CITY INFRASTRUCTURE PVT. LTD.
CINU70101DL2005PTC136628
PANXXXX528A
Emailudit@onecity.in
Websitehttp://www.onecity.in
Phone (Mobile)9891500335
Phone (Landline)01123358616
Registered Address8-D, HANSLAYA 15, BARAKHAMBA ROAD, NEW DELHI, DELHI-110001.
Project AddressSECTOR- 48, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilGURGAON

Location

Layout

Loading
The Saavira Masterplan
The Saavira Masterplan

Payment Plans

Loading
The Saavira Payment Plan
The Saavira Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1356 sq.ft
Built Up Area
N/A
Carpet Efficiency
N/A
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameICICI BANK
Account Number777705876492
IFSC CodeICIC0001352
MICR Code110229137
Branch Code001352

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)1. Mr. Sunil Kumar Jain 2. Mr. Udit Jain 3. Mr. Apoorv Jain Address : C - 479, Defence Colony, Lajpat Nagar, S.O, South Delhi, Delhi - 110024.
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Provided

Development Details

Land Area0.8615 (Acre)
Proposed FAR3.6168
Permissible FAR3.62
Total Licensed Land0.8615 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1399.00
CONSTRUCTION OF ROADS1365.41
PAVEMENTS0
PARKS AND PLAYGROUNDS721.76
GREEN BELTS0
VEHICLE PARKINGS0
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
Total3486.17

Cost Details

Land Cost6168.88 Lakhs
Other Cost1231.79 Lakhs
Estimated Project Cost15579.96 Lakhs
Estimated Infrastructure Cost1439.50 Lakhs
Estimated Apartment Construction Cost6739.79 Lakhs

Documents

ASSURANCE FOR WATER SUPPLY

Uploaded on: 03-10-2024

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 30-09-2024

BUILDING PLAN BR-III

Uploaded on: 03-10-2024

ZONING PLAN

Uploaded on: 30-09-2024

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-09-2024

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-09-2024

ASSURANCE FOR SEWERAGE

Uploaded on: 03-10-2024

DEMARCATION PLAN

Uploaded on: 30-09-2024

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 30-09-2024

AIRPORT HEIGHT CLEARANCE

Uploaded on: 03-10-2024

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-09-2024

LOI

Uploaded on: 03-10-2024

ALLOTMENT LETTER

Uploaded on: 03-10-2024

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 03-10-2024

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 03-10-2024

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 03-10-2024

ASSURANCE FOR STORM WATER

Uploaded on: 03-10-2024

Statutory Approvals

ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO0118/UE029/GALOT/0000001498, ALLOTTED BY THE HSVP.Date: 24-01-2024Status: ALREADY BEEN OBTAINED
BUILDING PLAN BEARING MEMO NO. CTP/DTP(AM)/SB/255086Date: 20-09-2024Status: ALREADY BEEN OBTAINED
ZONING PLAN DRAWING NO. D.T.P. (G) 2626 / 2023Date: 08-05-2023Status: ALREADY BEEN OBTAINED
AIRPORT NOC BEARING NO. AAI/RHQ/NR/ATAM/NOC/2024/186/690-93Date: 19-03-2024Status: ALREADY BEEN OBTAINED
FIRE SCHEME APPROVALDate: 15-06-2024Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 25-06-2024Status: APPLIED FOR BUT YET TO RECEIVE
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
SEWERAGE SYSTEMAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
UNDERGROUND WATER TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: HSVP (ALREADY CONNECTED)Approval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Approved
ELECTRICITYProvider: DHVBNApproval Status: Approved
SEWAGE DISPOSALProvider: HSVPApproval Status: Approved
STORM WATER DRAINAGEProvider: HSVPApproval Status: Approved

Project Team

Authorized Representative

MR UDIT JAIN
Name
MR UDIT JAIN
PAN
XXXX019N
Email
udit@onecity.in
Mobile
9891500335
Landline
01123358616
Address
C-479 Chakarvarthi Vithi Defence Colony Lajpat Nagar S. O South Delhi Delhi-110024.

Managing Director/CEO

MR SUNIL KUMAR JAIN
Name
MR SUNIL KUMAR JAIN
PAN
XXXX310J
Email
sjain@onecity.in
Mobile
9810056857
Landline
01123358616
Address
C-479 Defence Colony Lajpat Nagar S. O South Delhi Delhi-110024.

Directors

MR SUNIL KUMAR JAIN
Name
MR SUNIL KUMAR JAIN
PAN
XXXX310J
Email
sjain@onecity.in
Mobile
9810056857
Landline
01123358616
Address
C-479 Defence Colony Lajpat Nagar S. O South Delhi Delhi-110024.
MR UDIT JAIN
Name
MR UDIT JAIN
PAN
XXXX019N
Email
udit@onecity.in
Mobile
9891500335
Landline
01123358616
Address
C-479 Chakarvarthi Vithi Defence Colony Lajpat Nagar S. O South Delhi Delhi-110024.

Contact Details

Project ContactEmail: udit@onecity.inMobile: 0000000000Landline: 0000000000
Project Contact PersonName: MR UDIT JAINEmail: udit@onecity.inMobile: 9891500335Landline: 0000000000

Land Details

Land Area0.8615 (Acre)
Proposed FAR3.6168
Permissible FAR3.62
Total Licensed Land0.8615 (Acre)

Land Usage

Land Cost6168.88 Lakhs
Other Cost1231.79 Lakhs
Estimated Project Cost15579.96 Lakhs
Estimated Infrastructure Cost1439.50 Lakhs
Estimated Apartment Construction Cost6739.79 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
Shopping area0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Electricity Supply System0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.92
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.83
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.67
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.79
Water Supply System0.810.810.810.81
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.92
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.83
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.67
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.79
Water Supply System0.810.810.810.81
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.92
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.83
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.67
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.79
Water Supply System0.810.810.810.81
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.92
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.83
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.67
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.79
Water Supply System0.810.810.810.81
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.92
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.63
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.83
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.67
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.79
Water Supply System0.810.810.810.81
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System2.922.922.922.84
Electrification Cost20.8320.8320.8320.83
Other0000
Parking0.630.630.630.51
Parks and Playgrounds6.256.256.256.25
Rain water harvesting0.50.50.50.5
Renewable energy system0.830.830.830.91
Roads & Pavements11.7911.7911.7911.79
STP1.671.671.671.59
Security and Firefighting services7.297.297.297.29
Sewerage treatment & garbage disposal0.710.710.710.71
Shopping area0000
Storm Water Drainage0.630.630.630.63
Street Light0.330.330.330.33
Underground Water Tank4.794.794.794.83
Water Supply System0.810.810.810.81
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Electricity Supply System000-
Electrification Cost----
Other000-
Parking----
Parks and Playgrounds000-
Rain water harvesting----
Renewable energy system----
Roads & Pavements000-
STP----
Security and Firefighting services----
Sewerage treatment & garbage disposal000-
Shopping area000-
Storm Water Drainage000-
Street Light----
Underground Water Tank----
Water Supply System000-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING ROOM / DINING FAMILY LOUNGE - ITALIAN/ IMPORTED MARBLE BED ROOM-LAMINATED WOODEN FLOOR KITCHEN-TILES BATHROOMS - TILES BALCONIES / TERRACES- TILES SERVANT ROOM & TOILET-TILES APARTMENT LIFT LOBBIES (PRIVATE).-ITALIAN/ IMPORTED MARBLE
WALL FINISHING DETAILSWALLS - LOW VOC ACRYLIC EMULSION PAINT , CERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA ,VITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER ,M S HANDRAIL LOW VOC ACRYLIC EMULSION PAINT
KITCHEN DETAILSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA,CEILING - LOW VOC ACRYLIC EMULSION PAINT AND PART POP
BATHROOM FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESDOORS - WOODEN FRAME WITH FLUSH DOOR WITH VENEER FINISH (ON BOTH SIDES) & ARCHITRAVES,UPVC FRAMED SINGLE GLAZING UNIT,WOODEN FRAME WITH FLUSH DOOR WITH BOTH SIDE LAMINATED FINISH & ARCHITRAVE
GLASS WORKUPVC FRAMED SINGLE GLAZING
ELECTRIC FITTINGSHEAVY DUTY/ MEDIUM DUTY
CONDUCTING AND WIRING DETAILSFIRE RESISTANT
CUPBOARD DETAILSNA
WATER STORAGENA
LIFT DETAILSHIGH SPEED ELEVATORS
EXTERNAL GLAZINGSFULL POINT WINDOW UPUC
WINDOWS/GLAZINGSUPVC FRAMED SINGLE GLAZING
DOORSFLASH DOOR
MAIN DOORSFLASH DOOR
INTERNAL DOORSFLASH DOOR
AIR CONDITIONINGSPLIT AC'S
ELECTRICAL FITTINGSMODULAR
CNG PIPE LINEPROVISIONAL
PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONAL
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINT FINISH
INTERNAL FINISHINGLOW VOC ACRYLIC EMULSION

Unit-wise Specifications

TOILET
FLOORANTI-SKID VITRIFIED TILES
WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
COUNTERSGRANITE ON THE COUNTER
SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
KITCHEN
FLOORVITRIFIED TILES
WALLSCERAMIC TILES ABOVE KITCHEN PLATFORM UPTO APPROXIMATELY 2 FEET AND LOW VOC ACRYLIC EMULSION PAINT IN THE BALANCE AREA
CEILINGLOW VOC ACRYLIC EMULSION PAINT & PART POP
COUNTERSNA
FIXTURESNA
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT
WARDROBESNA
MASTER TOILET
FLOORVITRIFIED TILES
WALLSVITRIFIED TILES UP TO FALSE CEILING WITH GRANITE ON THE COUNTER
CEILINGLOW VOC ACRYLIC EMULSION PAINT WITH FALSE CEILING AS PER DESIGN
COUNTERSGRANITE ON THE COUNTER
SANITARY WARE/CP FITTINGSKOHLER, GROHA& ROCA OR EQUIVALENT
FITTING/FIXTURESKOHLER, GROHA& ROCA OR EQUIVALENT
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOOR
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORITALIAN/ IMPORTED MARBLE
WALLSLOW VOC ACRYLIC EMULSION PAINT
CEILINGLOW VOC ACRYLIC EMULSION PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES
WALLS & CEILINGEXTERIOR GRADE PAINT OF APPROVED MAKE
TOILETNA
BALCONYM S HANDRAIL

Fee Details

Payment 1
amount:569000
cheque no:512426
draft date:01-10-2024
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:161093
cheque no:932993614
draft date:25-11-2024
payable to:HRERA Gurugram
payee bank:161093