NewActive

The Peridona C-1 Jaypee Greens

Gautam Buddha Nagar, Uttar Pradesh
30-03-2025
Launch Date
New
Type
04-02-2030
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

04-02-2030

Project Size

7 Buildings - 341 units

Total Floors

41

Launch Price

19000 /sq.ft

Current Price

24000 /sq.ft

RERA ID

UPRERAPRJ298067/05/2025

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)15432
Project NameThe Peridona C-1 Jaypee Greens
Registration Fee (in Rs.)82500
AddressPlot No. C-01, Land-II, Integrated Sports Complex at Jaypee Greens, Sector-26 & 31, Surajpur Kasana Road, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN-201310
Village/Locality/Sector etc.Jaypee Greens, Sector 26 & 31, Greater Noida
StateUttar Pradesh
Project Duration (In month)59
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date30-03-2025
Sanctioning Competent AuthorityGreater Noida Authority
Project Cost (in Lacs)213908
Proposed Completion Date04-02-2030

Location

Latitude

28.280529

Longitude

77.303304

Walkthrough

Loading

Bank Details

Account Details
Name of the AccountCRCGPL Col A/C for The Peridona C-1 Jaypee Greens
Account Number9550373305
Bank NameKotak Mahindra Bank Limited
Branch NameSector 18, NOIDA
Branch AddressAnsals Fortune Arcade, Sector- 18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN- 201301
IFSC CodeKKBK0005033
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
Branch Email Addressdeepa.handa@kotak.com
Separate Account Details
Name of the AccountCRCGPL Sep Bank A/C for The Peridona C-1 Jaypee Greens
Account Number9550373312
Bank NameKotak Mahindra Bank Limited
Branch NameSector-18, NOIDA
Branch AddressAnsals Fortune Arcade, Sector-18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKKBK0005033
Transaction Account Details
Name of the AccountCRCGPL RERA Tran A/C for The Peridona C-1 Jaypee Greens
Account Number9550373299
Bank NameKotak Mahindra Bank Limited
Branch NameSector-18, NOIDA
Branch AddressAnsals Fortune Arcade, Sector-18, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN- 201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeKKBK0005033

Development Works

Demarcation of Plots

The Plot No. C-1 in Land-2, integrated Sports Complex at Jaypee Greens Sector 26 and 31 , Surjpur Kasana Road, Greater Noida, U.P. had been demarcated by JAYPEE.

Boundary Wall

Green fencing as per rule of Township.

Road Work

Access driveway to all the towers will be provided and that driveway will be pavers M 30 grade with thickness of 65 mm and 100 mm kerb stone on sides if required. An entry of tower , there will be pattern as per design.

Footpaths

Footpath will be provided using 40-50 mm paver wherever required.

Water Supply Including Drinking Water Facilities

The Total domestic water demand is 770 KL, and flushing water demand is 280 KL. since this is part of the Jaypee Green Master Plan, the water supply will be received from the Jaypee Green Infra pluming plant room. This water will be stored in the fire water tank and, which shall there after be allowed to overflow and store in water tank. The raw water after treatment shall be stored in the treated water tanks. Domestic water shall thereafter be transferred by gravity to the various consumption point. Booster pump shall be installed at the roof level to feed the Top 3 floors to ensure minimum 1.5 bar pressure at the usage points. Similarly, Flushing water will be received from the Jaypee Green (Infra) STP and store in Non portable water receiving Tank. Thereafter depending on the quality water shall be treated by UF and store in Flushing Water Tank. Flushing Water and Domestic Water shall be supplied by dedicated Hydro-pneumatic System installed in the plumbing plant room respectively to feed OHT of all towers.

Sewer System

The Centralized Sewage Treatment plant is available at master plan level. So all the blocks shall disposed by gravity system in to the first manholes around the towers, which shall be finally connected to the external sewerage system network as per the master plan. Incase of STP failure, raw water from the plumbing plant room shall be transferred to flushing water tank.

Drain

Roof rain water shall be collected through pipes and connected to rain water storage tank for reuse and excess water overflow in the surface storm drain network, surface rain water collected through drain network which will be planned at the site level and thereafter overflow in to master plan Strom water network.

Parks

Landscape with civil work masonry 115/230 mm and stone, paver, grass and various type of plantation , shrubs.

Tree Planting

Tree Plantation will be as per the sanctioned Plan in which 50 percent trees will be evergreen trees.

Design For Electric Supply Including Street Lighting

Centralized substation have been proposed for entire development at ground level. 5 no. 2000 KVA, 33/0.433 kV Oil filled Compact transformers are proposed for the entire development including External or Street lighting. In order to provide resilient power supply for the Project, 100 percent emergency power Backup is proposed through 5 No. 1500 kVA Radiator Cooled type Generator Sets.( No DG Backup for EV charging Infrastructure.). DG sets are planned in basement in double height area.

Community Buildings

Community Building will be made as per approved Building plan and there will be Multi purpose Hall, Indoor Games, GYM, Entrance lobby etc.

Treatment and Disposal System of Sewage and Sullage water

The Centralized Sewage Treatment plant is available at master plan level . So, all the Blocks shall be disposed by gravity system into the first main holes around the Towers, which shall be finally connected to the external sewerage system as per the master plan. Centralized sewage Treatment plant shall be consisting of a flushing water distribution ring, from which a connection shall be taken to the filled the UG Flushing Water Storage Tank. Although it is already treated water, ultra filtration will be done at the site to meet the government parameters. In case of STP Failure, row water from the pluming plant room shall be transferred to flushing water tank with dedicated transfer pumps installed in plumbing plant room.

Solid Waste Management And Disposal System

Collection, Storage and disposal will be done manually , and disposal will be done as per norms.

Water Conservation System

Re use STP treated water for flushing, colling tower make-up and landscaping purpose. Use of Low Flow of waterless fixtures with aerator head. Use of Sensor operated taps and Urinals and Duel Flush WCs in common Toilets. Use of Digital water Meters at each major consumption point. Use of drought resistant and native species of plants. Use of Drip irrigation of Micro Irrigation techniques for landscaping.

Energy Management System Including Use of Renewable Energy

In compliance to ECBC norms, approx. 60 kWp Solar power needs to be generated. It is proposed to plan Solar PVs at Tower roof. Solar PV shall be provided facing south on the roof. it will be synchronized with main grid power supply for utilization within the building during the day. No net Metering with utility Grid is being envisaged.

Fire Protection And Fire Safety System

The Fire Protection system is designated to provide Life safety of occupants by means of providing early warning for complete evacuation, activation of extinguishing system and timely information to occupants inline with part 4 of NBC 2016. The following fire fighting system have been proposed- Hydrant System Automatic Sprinkler System Fire Extinguishers. Fire Hose Reels Fire Alarm and Detection System Fire Pumps Water Storage Tanks Emergency Lighting and Signage Fore Doors and Partitions

Social Infrastructure And Other Public Amenities Including Public Health Services

Social gathering places in the community building are being provided.

Emergency Evacuation Services

YES, Refuge area provided at every Tower on 15th , 23rd, 31st and 39th floor in addition to Main and Fire Staircase.

Other Miscellaneous Work

Proper Security System including Security Guards, CCTV Cameras and controlled access will be made available.

Documents

Lease Deed

No: Lease Deed No. 2938-2939 | Date: 08-06-2000

Allotment Letter issued by Competent Authority

No: Allotment Letter No. 2000/270 | Date: 06-06-2000

Allotment Letter issued by Competent Authority

No: Possession Letter No. 2000/275 | Date: 08-06-2000

Allotment Letter issued by Competent Authority

No: Assignment Agreement No. 1645 | Date: 16-01-2024

Allotment Letter issued by Competent Authority

No: Land No Dues Certificate from GNIDA | Date: 09-12-2024

Allotment Letter issued by Competent Authority

No: The Peridona Reply Letter to UP RERA regarding Objection Letter Dated-04.03.2025 | Date: 11-03-2025

Proforma of Completion Certificate(Occupancy)

General body resolution for AoA (if Authorized Entity is AoA)

Notarized Affidavit for completion of balance development work

Details of Encumbrances

Uploaded: 18-02-2025

Commencement Certificate

Uploaded: 18-02-2025

Other Plan(If Any)

Uploaded: 18-02-2025

Proforma of Application Form

Uploaded: 18-02-2025

Proforma of Allotment Letter

Uploaded: 18-02-2025

Proforma of Conveyance Deed

Uploaded: 18-02-2025

Waste Disposal Plan

Uploaded: 18-02-2025

Water Supply Plan

Uploaded: 18-02-2025

Electricity Supply Plan

Uploaded: 18-02-2025

Development Work Plan

Uploaded: 18-02-2025

Affidavit

Uploaded: 16-04-2025

CA CERTIFICATE

Uploaded: 18-04-2025

ARCHITECT CERTIFICATE

Uploaded: 18-04-2025

ENGINEERS CERTIFICATE

Uploaded: 18-04-2025

Other

Uploaded: 16-04-2025

Proforma of Agreement for Sale

Uploaded: 18-02-2025

Permits

Orignal Permit NoPLG/BP SM-10-JUL-2024.21921
Orignal Permit Date05-02-2025
Valid Upto04-02-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto04-02-2035
End Date04-02-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Katyani Steel Works
Contractor Address120/5, Krishna Nagar, Safadarjung Enclave, Delhi, PIN- 110029
Architect NameShivendra Nath
Architect AddressGround Floor, Tower- A, Logix Techno Park, Sector-127, NOIDA, Gautam Buddha Nagar.
Architect Licence NumberCA/2012/56592
Structural Engineer NameRavi Shankar
Structural Engineer AddressH.No.- A112, Block-A, Sector-108, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201304
Mobile number(Project Co-ordinator)9650638228

Land Details

AFS

Showing 7 blocks with 372 units

Property Summary

Total Carpet Area

117761.72 m²

1267575.38 ft²

Total Units

341

3 different types

Blocks & Floors

7

42 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:345.34 m²
Balconies:1173
Parking ratio:0.00 per unit

Block Tower-1

42 units

Block Tower-2

42 units

Block Tower-3

42 units

Block Tower-4

42 units

Block Tower-5

80 units

Block Tower-6

42 units

Block Tower-7

82 units

Khasra Details

Total Area

15432.00 m²

166108.50 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoC-01, Land-II, Integrated Sports Complex at Jaypee Greens , Sector 26 and 31, Surajpur Kasana Road, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh, PIN- 201310
Area(In Sq. Mt.)15432

Other Details

Contractor Name (if any)Katyani Steel Works
Contractor Address120/5, Krishna Nagar, Safadarjung Enclave, Delhi, PIN- 110029
Architect NameShivendra Nath
Architect AddressGround Floor, Tower- A, Logix Techno Park, Sector-127, NOIDA, Gautam Buddha Nagar.
Architect Licence NumberCA/2012/56592
Structural Engineer NameRavi Shankar
Structural Engineer AddressH.No.- A112, Block-A, Sector-108, NOIDA, Gautam Buddha Nagar, Uttar Pradesh, PIN-201304
Mobile number(Project Co-ordinator)9650638228